ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Cooper Nuclear Station__________
Date of Examination: _9/21/2009___
Examination Level: RO X SRO Operating Test Number: __________
Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations S, D, P Obtain and Interpret a GARDEL Periodic Case Conduct of Operations NOT TESTED Equipment Control S, D Determine isolation boundaries for REC pump wearing ring replacement.
Radiation Control R,D Radiation Protection Table top scenario Emergency Procedures/Plan R, N Determine RPV water level instrumentation availability during LOCA conditions NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Cooper Nuclear Station__________
Date of Examination: _9/21/2009___
Examination Level: RO SRO X Operating Test Number: __________
Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations S, M Security Emergency Conduct of Operations R, D Determine if Shift Staffing requirements are adequate for mode change Equipment Control S, D Review Jet Pump Operability Test Radiation Control R, D Review and Approve a Liquid Radioactive Waste Discharge Permit Emergency Procedures/Plan D, R, P EAL Table Top NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___Cooper Nuclear Station____________
Date of Examination: _9/21/2009____
Exam Level: RO X SRO-I SRO-U Operating Test No.: ______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
A,D,S 1
- b. Perform quick Restart of RFPT B (Hard Card) (Alternate Path)
A,M,P,S 2
- c. Transfer Governor Valve Control from Manual to Auto with DEH in Mode IV D,S 3
- d. High Pressure Coolant Injection / Manually Initiate EN,M,S, L 4
- f. Transfer of 4160V Bus 1G from DG2 to Emergency Transformer D,L,P,S 6
- g. Install EOP PTMs 57, 58, 59, 60 D, S 7
A,EN,M,S,L 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. Respond to No Break Power Panel Failure (Alternate Path)
A,D 6
- k. Inject Fire Water into RHR (Level control)
D,E 2
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___Cooper Nuclear Station____________
Date of Examination: _9/21/2009____
Exam Level: RO SRO-I SRO-U X Operating Test No.: ______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a.
- b. High Pressure Coolant Injection / Manually Initiate EN,M,S,L 4
- c.
- d. Perform quick Restart of RFPT B (Hard Card) (Alternate Path)
A,M,P,S 2
- e.
- f.
- g.
A,EN,M,S,L 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. Respond to No Break Power Panel Failure (Alternate Path)
A,D 6
- k.
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___Cooper Nuclear Station____________
Date of Examination: _9/21/2009____
Exam Level: RO SRO-I X SRO-U Operating Test No.: ______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code*
Safety Function
- a. Respond to a Trip of a Reactor Recirc Pump (Alternate Path)
A,D,S 1
- b. Perform quick Restart of RFPT B (Hard Card) (Alternate Path)
A,M,P,S 2
- c. Transfer Governor Valve Control from Manual to Auto with DEH in Mode IV D,S 3
- d. High Pressure Coolant Injection / Manually Initiate EN,M,S, L 4
- f. Transfer of 4160V Bus 1G from DG2 to Emergency Transformer D,L,P,S 6
- g.
A,EN,M,S,L 9
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. Respond to No Break Power Panel Failure (Alternate Path)
A,D 6
- k. Inject Fire Water into RHR (Level control)
D,E 2
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 / 8 / 4 1 / 1 / 1
- / - / 1 (control room system) 1 / 1 / 1 2 / 2 / 1 3 / 3 / 2 (randomly selected) 1 / 1 / 1
ES-301 Transient and Event Checklist Form ES-301-5 Facility:
Date of Exam:
Operating Test No.:
Scenarios 1
2 3
4 CREW POSITION CREW POSITION CREW POSITION CREW POSITION M
I N
I M
U M(*)
A P
P L
I C
A N
T E
V E
N T
T Y
P E
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
T O
T A
L R
I U
RX 1
1 1 0 NOR 1
1 1 1 I/C 3
3 4
4 2 MAJ 1
2 2
2 1 RO X
SRO-I SRO-U TS 0
2 2 RX 1
1 1 0 NOR 1
1 1 1 I/C 3
4 4
4 2 MAJ 1
2 2
2 1 RO SRO-I X
SRO-U TS 2
0 2 2 RX 1
1 0 NOR 2
1 1 1 I/C 5
4 4 2 MAJ 1
2 2 1 RO SRO-I SRO-U X
TS 2
0 2 2 RX 1
1 1 0 NOR 1
1 1 1 I/C 3
4 4
4 2 MAJ 1
2 2
2 1 RO X
SRO-I SRO-U TS 0
2 2
Instructions:
- 1.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility:
Date of Exam:
Operating Test No.:
Scenarios 1
2 3
4 CREW POSITION CREW POSITION CREW POSITION CREW POSITION M
I N
I M
U M(*)
A P
P L
I C
A N
T E
V E
N T
T Y
P E
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
T O
T A
L R
I U
RX 1
1 1 0 NOR 1
1 1 1 I/C 5
3 4
4 2 MAJ 1
2 2
2 1 RO SRO-I X
SRO-U TS 2
0 2 2 RX 1
1 0 NOR 1
1 1 1 I/C 4
4 4 2 MAJ 2
2 2 1 RO SRO-I SRO-U X
TS 2
0 2 2 RX 2
1 1 0 NOR 1
1 1 1 I/C 4
3 4
4 2 MAJ 2
2 2
2 1 RO X
SRO-I SRO-U TS 0
2 2 RX 1
1 1 0 NOR 1
1 1
1 1 I/C 3
3 2
4 4 2 MAJ 1
2 2
2 2 1 RO X
SRO-I SRO-U TS 0
2 2 Instructions:
- 3.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 4.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility:
Date of Exam:
Operating Test No.:
Scenarios 1
2 3
4 CREW POSITION CREW POSITION CREW POSITION CREW POSITION M
I N
I M
U M(*)
A P
P L
I C
A N
T E
V E
N T
T Y
P E
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
T O
T A
L R
I U
RX 1
1 0 NOR 1
1 1 1 I/C 5
4 4 2 MAJ 1
2 2 1 RO SRO-I SRO-U X
TS 2
0 2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 RO SRO-I SRO-U TS 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 RO SRO-I SRO-U TS 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 RO SRO-I SRO-U TS 0
2 2 Instructions:
- 5.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 6.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility:
Date of Exam:
Operating Test No.:
Scenarios 1
2 3
4 CREW POSITION CREW POSITION CREW POSITION CREW POSITION M
I N
I M
U M(*)
A P
P L
I C
A N
T E
V E
N T
T Y
P E
S R
O A
T C
B O
P S
R O
A T
C B
O P
S R
O A
T C
B O
P S
R O
A T
C B
O P
T O
T A
L R
I U
RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 RO SRO-I SRO-U TS 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 RO SRO-I SRO-U TS 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 RO SRO-I SRO-U TS 0
2 2 RX 1
1 0 NOR 1
1 1 I/C 4
4 2 MAJ 2
2 1 RO SRO-I SRO-U TS 0
2 2 Instructions:
- 7.
Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 8.
Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.: NRC 1 Op-Test No.: _______
Examiners: ____________________________ Operators:
Initial Conditions: The plant is operating at 8% power with a startup in progress.
Turnover: Raise power and put the main turbine on line. Rod 22-27 has been inserted from 48 to 46 to return temperatures back into the normal band.
Event No.
Malf.
No.
Event Type*
Event Description 1
R Raise power to get 50% bypass valve position 2
1 I
Torus Level Instrument Fails Upscale 3
2 C
Difficult to move Control Rod 4
3 N
Role the Turbine 5
4 C
TEC Pump Trip 6
5 C
Single MSIV Inadvertent Closure 7
6 C
Rod Drop Accident 8
7 M
Fuel Failure/Scram/Failure of Scram discharge volume drain valve to close.
9 8
C Group 6 isolation failure (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.: NRC 2 Op-Test No.: 2009 NRC Examiners: ____________________________ Operators:
Initial Conditions: Near End of Operating Cycle 95% power and raising power to 100%. EDG 1 running unloaded for break-in run after maintenance that replaced 1 piston.
Turnover: Continue EDG 1 synch and load per procedure. Continue raising power to rated power.
EDG 1 LCO due to maintenance.
Event No.
Malf.
No.
Event Type*
Event Description 1
N Synchronize and Load EDG 1 per procedure.
2 R
Raise Power with RR to rated power 3
1 C
HPCI inadvertent Initiation 4
2 C
Condensate Pump A Trip, A RR Pump Fails to run back 5
3 I
APRM B fails at 100%
6 4
M Main turbine vibration increase resulting in Turbine Trip Required, Reactor Manual Scram (ATWS no rods move) 7 5
M Non Critical Busses fail to fast transfer on Turbine Trip 8
6 C
SLC Pump A starts then trips immediately 9
7 I
RCIC Flow Controller Fails Low must be taken to manual 10 8
C RCIC Turbine Trip (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.: _NRC 3_______
Op-Test No.: _______
Examiners: ____________________________ Operators:
Initial Conditions: The plant is operating at 75% power near the end of the current fuel cycle. CBP B is being restored to service following corrective maintenance. It is a red light day and the dispatcher has requested that power be raised to maximum. SLC pump 1A is out of service to replace the discharge relief valve.
Turnover: Crew is to Start CBP B and continue power ascension. TS for SLC pump LCO is included.
Event No.
Malf.
No.
Event Type*
Event Description 1
N Start Condensate Booster Pump B 2
R Raise Power using RR 3
1 I
RRMG A controller failure to maximum 4
2 C
Loss RCIC 125 VDC 5
3 M
Lowering Main Condenser Vacuum resulting in Scram and Turbine trip Required 6
R Emergency Power reduction to maintain Vacuum 7
4 C
When Reactor is Scrammed both Reactor Feed pumps trip 8
5 M
When turbine tripped Loss of Offsite power occurs. EDG #2 fails to start and can not be started from the Control room and 4160F lock out occurs due to a fault on the bus. This results in a Station black Out.
9 6
C HPCI oil system fails (leak) resulting in HPCI unavailable to inject to RPV (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.:
NRC 4 (SPARE)
Op-Test No.:
Examiners:
Operators:
Initial Conditions: The plant is operating at 90% power with no equipment out of service.
Turnover: After the crew has assumed the watch, Start 1B CRD Pump and secure 1A CRD Pump to allow maintenance on the motor.
Event No.
Malf.
No.
Event Type*
Event Description
- 1.
N Swap CRD Pumps
- 2.
1 C
RCIC Steam Leak and Manual Isolation of RCIC
- 3.
2 I
Oscillating Feedwater Flow Instrument
- 4.
3 C
Condensate booster pump trip
- 5.
R Emergency Power Reduction
- 6.
4 C
A Reactor Recirc Pump Trip
- 7.
5 C
Reactor Recirc Pump Seal Failure
- 8.
6 M
Large LOCA
- 9.
7 C
Core Spray Valves Fail to Auto Open
- 10.
8 C
RHR pumps fail to Auto Start
- 11.
M Emergency Depressurization due to low level.
(N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor