ML100880175
ML100880175 | |
Person / Time | |
---|---|
Site: | Cooper |
Issue date: | 09/21/2009 |
From: | Garchow S Operations Branch IV |
To: | |
References | |
CN-2009-09 | |
Download: ML100880175 (16) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Cooper Nuclear Station__________ Date of Examination: _9/21/2009___
Examination Level: RO X SRO Operating Test Number: __________
Administrative Topic Type Describe activity to be performed (see Note) Code*
Conduct of Operations S, D, P Obtain and Interpret a GARDEL Periodic Case Conduct of Operations NOT TESTED Equipment Control S, D Determine isolation boundaries for REC pump wearing ring replacement.
Radiation Control R,D Radiation Protection Table top scenario Emergency Procedures/Plan R, N Determine RPV water level instrumentation availability during LOCA conditions NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility: __Cooper Nuclear Station__________ Date of Examination: _9/21/2009___
Examination Level: RO SRO X Operating Test Number: __________
Administrative Topic Type Describe activity to be performed (see Note) Code*
Conduct of Operations S, M Security Emergency Conduct of Operations R, D Determine if Shift Staffing requirements are adequate for mode change Equipment Control S, D Review Jet Pump Operability Test Radiation Control R, D Review and Approve a Liquid Radioactive Waste Discharge Permit Emergency Procedures/Plan D, R, P EAL Table Top NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
- Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1; randomly selected)
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___Cooper Nuclear Station____________ Date of Examination: _9/21/2009____
Exam Level: RO X SRO-I SRO-U Operating Test No.: ______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. Respond to a Trip of a Reactor Recirc Pump (Alternate Path) A,D,S 1
- b. Perform quick Restart of RFPT B (Hard Card) (Alternate Path) A,M,P,S 2
- c. Transfer Governor Valve Control from Manual to Auto with DEH D,S 3 in Mode IV
- d. High Pressure Coolant Injection / Manually Initiate EN,M,S, L 4
- f. Transfer of 4160V Bus 1G from DG2 to Emergency Transformer D,L,P,S 6
- g. Install EOP PTMs 57, 58, 59, 60 D, S 7
- h. SGT System Support for HPCI operations (Alternate Path) A,EN,M,S,L 9 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. Respond to No Break Power Panel Failure (Alternate Path) A,D 6
- k. Inject Fire Water into RHR (Level control) D,E 2
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___Cooper Nuclear Station____________ Date of Examination: _9/21/2009____
Exam Level: RO SRO-I SRO-U X Operating Test No.: ______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function a.
- b. High Pressure Coolant Injection / Manually Initiate EN,M,S,L 4 c.
- d. Perform quick Restart of RFPT B (Hard Card) (Alternate Path) A,M,P,S 2 e.
f.
g.
- h. SGT System Support for HPCI operations (Alternate Path) A,EN,M,S,L 9 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. Respond to No Break Power Panel Failure (Alternate Path) A,D 6 k.
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: ___Cooper Nuclear Station____________ Date of Examination: _9/21/2009____
Exam Level: RO SRO-I X SRO-U Operating Test No.: ______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title Type Code* Safety Function
- a. Respond to a Trip of a Reactor Recirc Pump (Alternate Path) A,D,S 1
- b. Perform quick Restart of RFPT B (Hard Card) (Alternate Path) A,M,P,S 2
- c. Transfer Governor Valve Control from Manual to Auto with DEH D,S 3 in Mode IV
- d. High Pressure Coolant Injection / Manually Initiate EN,M,S, L 4
- f. Transfer of 4160V Bus 1G from DG2 to Emergency Transformer D,L,P,S 6 g.
- h. SGT System Support for HPCI operations (Alternate Path) A,EN,M,S,L 9 In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
- j. Respond to No Break Power Panel Failure (Alternate Path) A,D 6
- k. Inject Fire Water into RHR (Level control) D,E 2
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (EN)gineered safety feature - / - / 1 (control room system)
(L)ow-Power / Shutdown 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Date of Exam: Operating Test No.:
A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RO RX 1 1 1 0 X
NOR 1 1 1 1 SRO-I I/C 3 3 4 4 2 SRO-U MAJ 1 2 2 2 1 TS 0 2 2 RO RX 1 1 1 0 NOR 1 1 1 1 SRO-I X I/C 3 4 4 4 2 SRO-U MAJ 1 2 2 2 1 TS 2 0 2 2 RO RX 1 1 0 NOR 2 1 1 1 SRO-I I/C 5 4 4 2 SRO-U MAJ 1 2 2 1 X
TS 2 0 2 2 RO RX 1 1 1 0 X NOR 1 1 1 1 SRO-I I/C 3 4 4 4 2 SRO-U MAJ 1 2 2 2 1 TS 0 2 2
Instructions:
- 1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Date of Exam: Operating Test No.:
A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RO RX 1 1 1 0 NOR 1 1 1 1 SRO-I X I/C 5 3 4 4 2 SRO-U MAJ 1 2 2 2 1 TS 2 0 2 2 RO RX 1 1 0 NOR 1 1 1 1 SRO-I I/C 4 4 4 2 SRO-U MAJ 2 2 2 1 X TS 2 0 2 2 RO RX 2 1 1 0 X NOR 1 1 1 1 SRO-I I/C 4 3 4 4 2 SRO-U MAJ 2 2 2 2 1 TS 0 2 2 RO RX 1 1 1 0 X NOR 1 1 1 1 1 SRO-I I/C 3 3 2 4 4 2 SRO-U MAJ 1 2 2 2 2 1 TS 0 2 2 Instructions:
- 3. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 4. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Date of Exam: Operating Test No.:
A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RO RX 1 1 0 NOR 1 1 1 1 SRO-I I/C 5 4 4 2 SRO-U MAJ 1 2 2 1 X
TS 2 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 5. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 6. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
ES-301 Transient and Event Checklist Form ES-301-5 Facility: Date of Exam: Operating Test No.:
A E Scenarios P V 1 2 3 4 T M P E O I L N CREW CREW CREW CREW T N I T POSITION POSITION POSITION POSITION A I
M C S A B S A B S A B S A B L U A T R T O R T O R T O R T O M(*)
N Y O C P O C P O C P O C P R I U T P E
RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2 Instructions:
- 7. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
- 8. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-1 basis.
- 3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.: NRC 1 Op-Test No.: _______
Examiners: ____________________________ Operators: _____________________________
Initial Conditions: The plant is operating at 8% power with a startup in progress.
Turnover: Raise power and put the main turbine on line. Rod 22-27 has been inserted from 48 to 46 to return temperatures back into the normal band.
Event Malf. Event Event No. No. Type* Description 1 R Raise power to get 50% bypass valve position 2 1 I Torus Level Instrument Fails Upscale 3 2 C Difficult to move Control Rod 4 3 N Role the Turbine 5 4 C TEC Pump Trip 6 5 C Single MSIV Inadvertent Closure 7 6 C Rod Drop Accident 8 7 Fuel Failure/Scram/Failure of Scram discharge volume drain valve M
to close.
9 8 C Group 6 isolation failure
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.: NRC 2 Op-Test No.: 2009 NRC Examiners: ____________________________ Operators: _____________________________
Initial Conditions: Near End of Operating Cycle 95% power and raising power to 100%. EDG 1 running unloaded for break-in run after maintenance that replaced 1 piston.
Turnover: Continue EDG 1 synch and load per procedure. Continue raising power to rated power.
EDG 1 LCO due to maintenance.
Event Malf. Event Event No. No. Type* Description 1 N Synchronize and Load EDG 1 per procedure.
2 R Raise Power with RR to rated power 3 1 C HPCI inadvertent Initiation 4 2 C Condensate Pump A Trip, A RR Pump Fails to run back 5 3 I APRM B fails at 100%
6 4 M Main turbine vibration increase resulting in Turbine Trip Required, Reactor Manual Scram (ATWS no rods move) 7 5 M Non Critical Busses fail to fast transfer on Turbine Trip 8 6 C SLC Pump A starts then trips immediately 9 7 I RCIC Flow Controller Fails Low must be taken to manual 10 8 C RCIC Turbine Trip
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.: _NRC 3_______ Op-Test No.: _______
Examiners: ____________________________ Operators: _____________________________
Initial Conditions: The plant is operating at 75% power near the end of the current fuel cycle. CBP B is being restored to service following corrective maintenance. It is a red light day and the dispatcher has requested that power be raised to maximum. SLC pump 1A is out of service to replace the discharge relief valve.
Turnover: Crew is to Start CBP B and continue power ascension. TS for SLC pump LCO is included.
Event Malf. Event Event No. No. Type* Description 1 N Start Condensate Booster Pump B 2 R Raise Power using RR 3 1 I RRMG A controller failure to maximum 4 2 C Loss RCIC 125 VDC 5 3 M Lowering Main Condenser Vacuum resulting in Scram and Turbine trip Required 6 R Emergency Power reduction to maintain Vacuum 7 4 C When Reactor is Scrammed both Reactor Feed pumps trip 8 5 M When turbine tripped Loss of Offsite power occurs. EDG #2 fails to start and can not be started from the Control room and 4160F lock out occurs due to a fault on the bus. This results in a Station black Out.
9 6 C HPCI oil system fails (leak) resulting in HPCI unavailable to inject to RPV
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor
Appendix D Scenario Outline Form ES-D-1 Facility: Cooper Nuclear Station Scenario No.: NRC 4 Op-Test No.:
(SPARE)
Examiners: Operators:
Initial Conditions: The plant is operating at 90% power with no equipment out of service.
Turnover: After the crew has assumed the watch, Start 1B CRD Pump and secure 1A CRD Pump to allow maintenance on the motor.
Event Malf. Event Event No. No. Type* Description
- 1. N Swap CRD Pumps
- 3. 2 I Oscillating Feedwater Flow Instrument
- 4. 3 C Condensate booster pump trip
- 5. R Emergency Power Reduction
- 6. 4 C A Reactor Recirc Pump Trip
- 7. 5 C Reactor Recirc Pump Seal Failure
- 8. 6 M Large LOCA
- 9. 7 C Core Spray Valves Fail to Auto Open
- 10. 8 C RHR pumps fail to Auto Start
- 11. M Emergency Depressurization due to low level.
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor