Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "CCTF-1 Uncertainty Analysis, Technical Rept". Since there have been only a few results, also nearby values are displayed.

⧼showingresults⧽

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19066A292  + (CCF Memo from Cjf to Mxf (Rev 3))
  • ML071930365  + (CCI Chemical Laboratory Bench Top Test Rev 0)
  • ML19322A014  + (CCI Effectiveness Review Presentation November 20, 2019 ROP Public Meeting)
  • ML20239A834  + (CCI Program History)
  • ML20239A836  + (CCI Program Options Considered)
  • ML19263G162  + (CCI Public Meeting Presentation September 2019)
  • ML20199H153  + (CCNPP Emergency Response Exercise on 971118)
  • ML20072J095  + (CCNPP Unit 1 Cycle 12 Summary of Startup Testing)
  • ML20086E311  + (CCNPP Unit 2 Cycle 11 Summary of Startup Testing)
  • ML20141G447  + (CCNPP Unit 2 Cycle 12 Startup Testing Rept)
  • ML13319A932  + (CCNPP-BPPlan-002, Rev 0E, Small Scale Debris Bypass-Penetration Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13038A487  + (CCNPP-CHLE-001, Revision 0c, Chemical Effects Head Loss Experiment (Chle) Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13319A621  + (CCNPP-CHLE-003, Rev. 0d Chemical Effects PIRT Considerations for Calvert Cliffs Nuclear Power Plant)
  • ML13319A679  + (CCNPP-CHLE-007, Appendix 1, Alkyd Coatings in Refined GSI-191 Chemical Effects Testing)
  • ML13319A670  + (CCNPP-CHLE-007, Rev. G, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13224A103  + (CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13319A725  + (CCNPP-CHLE-009 Rev 2 Considerations for Using Marinite in CE Testing)
  • ML11129A310  + (CCNPP3 Cola - Calvert Cliffs Unit 3 - Receipt of Revision 7 of COL Application (Docket No. 52-016))
  • ML11129A312  + (CCNPP3 Cola - Ccnpp Chapter 2 Group 1)
  • ML110211105  + (CCNPP3 Cola - FW: Calvert Cliffs Board Order (Admitting an Environmental Alternatives Contention))
  • ML11129A313  + (CCNPP3 Cola - FW: EPR Wetbulb Vs C. Cliffs)
  • ML103570099  + (CCNPP3 – COL - Draft RAI 286 Sbpa 5313)
  • ML103620135  + (CCNPP3 – COL - Draft RAI 288 Rheb 5329)
  • ML103620140  + (CCNPP3 – COL - Draft RAI 289 Rheb 5328)
  • ML103560810  + (CCNPP3 – COL - Final RAI 283 Sbpa 5285)
  • ML20041A291  + (CCTF-1 Uncertainty Analysis, Technical Rept)
  • ML19309G840  + (CCTF-Operation & Maint Manual Instrumented Spool Piece & Downcomer Drag Disk Flow Measurement Sys, Interim Rept. Prepared for DOE)
  • ML20259D212  + (CCW Bypass Status Inoperative Logic Diagram System:R-20. Sheet 3)
  • ML20265D168  + (CCW Common Header Isolation Valves Logic Diagram System: Cc)
  • ML20261L597  + (CCW Common Header Isolation Valves Logic Diagram System: Cc)
  • ML20259D279  + (CCW Common Header Isolation Valves Logic Diagram System:R-20. Sheet 4)
  • ML20260E286  + (CCW Common Header Isolation Valves Logic Diagram System: Cc. Actual Drawing NUMBER:5R-20-9-Z-42044 1)
  • ML20260E289  + (CCW Common Loads Isolation Valves Logic Diagram System:Cc. Actual Drawing NUMBER:5R-20-9-Z-42045 1)
  • ML20265D172  + (CCW Common Loads Isolation Valves Logic Diagram System:Cc)
  • ML20261L743  + (CCW Common Loads Isolation Valves Logic Diagram System:Cc)
  • ML20259D274  + (CCW Component Isolation Valve Logic Diagram System:R-20. Sheet 5)
  • ML20259D269  + (CCW Component Isolation Valve Logic Diagram System:R-20. Sheet 6)
  • ML20259D239  + (CCW Containment Isolation MOV Logic Diagram System:R-20. Sheet 11)
  • ML20259D252  + (CCW Containment Isolation MOV Logic Diagram System:R-20. Sheet 9)
  • ML20260E292  + (CCW Containment Isolation Valves Logic Diagram System:Cc. Actual Drawing NUMBER:5R-20-9-Z-42046 1)
  • ML20265D177  + (CCW Containment Isolation Valves Logic Diagram System:Cc)
  • ML20261L738  + (CCW Containment Isolation Valves Logic Diagram System:Cc)
  • ML20259D232  + (CCW Containment Isolation Valves Logic Diagram System:R-20. Sheet 12)
  • ML20261L806  + (CCW Disch from RHR HX Valves Logic Diagram System:Cc)
  • ML20260E442  + (CCW Disch from RHR HX Valves Logic Diagram System:Cc. Actual Drawing NUMBER:5R-20-9-Z-42058 1)
  • ML20259C419  + (CCW ESF Monitoring Train B Logic Diagram System:Z-26. Sheet 16)
  • ML20259D222  + (CCW Ecw Auto Train Start Logic Diagram System:R-20. Sheet 1)
  • ML20260E460  + (CCW Ecw Standby Train Start Logic Diagram System:Cc. Actual Drawing NUMBER:5R-20-9-Z-42061 1)
  • ML20260B305  + (CCW Ecw Standby Train Start Logic Diagram System:Cc)
  • ML20260E467  + (CCW Ecw Train Selector Alarm Logic Diagram System:Cc. Actual Drawing NUMBER:5R-20-9-Z-42062 1)
  • ML20265D212  + (CCW Ecw Train Selector Alarm Logic Diagram System:Cc)