CCNPP3eRAIPEm Resource From: Arora, Surinder Sent: Thursday, December 23, 2010 8:50 AM To: 'Poche, Robert'; 'cc3project@constellation.com' Cc: CCNPP3eRAIPEm Resource; Wheeler, Larry; Colaccino, Joseph; Hearn, Peter; Wilson, Anthony; Vrahoretis, Susan; Lee, Samuel

Subject:

Draft RAI 286 SBPA 5313 Attachments: DRAFT RAI 286 SBPA 5313.doc

Rob, Attached is DRAFT RAI No. 286 (eRAI No. 5313). You have until January 14, 2010* to review it and decide whether you need a clarification phone call to discuss any questions in the RAI before the final issuance. After the phone call or on December 30, 2010, the RAI will be finalized and sent to you for response. You will then have 30 days to provide a technically complete response or an expected response date for the RAI.
  • - This time window allows for an extra week considering holidays and reduced resources)

Thanks SURINDER ARORA, PE PROJECT MANAGER, Office of New Reactors US Nuclear Regulatory Commission Phone: 301 4151421 FAX: 301 4156406 Email: Surinder.Arora@nrc.gov 1

Hearing Identifier: CalvertCliffs_Unit3Col_RAI Email Number: 68 Mail Envelope Properties (B46615B367D1144982B324704E3BCEED45121563C0)

Subject:

Draft RAI 286 SBPA 5313 Sent Date: 12/23/2010 8:49:48 AM Received Date: 12/23/2010 8:49:50 AM From: Arora, Surinder Created By: Surinder.Arora@nrc.gov Recipients:

"CCNPP3eRAIPEm Resource" <CCNPP3eRAIPEm.Resource@nrc.gov>

Tracking Status: None "Wheeler, Larry" <Larry.Wheeler@nrc.gov>

Tracking Status: None "Colaccino, Joseph" <Joseph.Colaccino@nrc.gov>

Tracking Status: None "Hearn, Peter" <Peter.Hearn@nrc.gov>

Tracking Status: None "Wilson, Anthony" <Anthony.Wilson@nrc.gov>

Tracking Status: None "Vrahoretis, Susan" <Susan.Vrahoretis@nrc.gov>

Tracking Status: None "Lee, Samuel" <Samuel.Lee@nrc.gov>

Tracking Status: None

"'Poche, Robert'" <Robert.Poche@constellation.com>

Tracking Status: None

"'cc3project@constellation.com'" <cc3project@constellation.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 750 12/23/2010 8:49:50 AM DRAFT RAI 286 SBPA 5313.doc 33786 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Request for Additional Information No. 286 (eRAI 5313)

DRAFT 12/23/2010 Calvert Cliffs Unit 3 UniStar Docket No.52-016 SRP Section: 09.02.05 - Ultimate Heat Sink Application Section: 9.2.9 QUESTIONS for Balance of Plant Branch 1 (AP1000/EPR Projects) (SBPA) 09.02.05-18 Below are follow up questions for RAI 171, Q9.2.5-2 and RAI 171, Q9.2.5-3.

For RAI 171, Q9.2.5-2, there are 3 follow up questions.

(1) Regarding Bullets 4 and 5:

Applicant's response to the RAI stated that there are two 100% capacity pumps with the following flow rates: desalinated water flow rate of 1225 gpm (4637 lpm), nominal pump flow rate of 790 gpm (2992 lpm) for head determination, and the average flow rate of 807 gpm (3055 lpm), and the maximum flow rate of 2411 gpm (9126 lpm).

The maximum UHS evaporate water loss is indicated in Table 2.0-1, U.S. ERP Site Design Envelope Comparison, as 1364 gpm (5163 lpm). The U.S.EPR Tier 2 Table 9.2.5-2, Ultimate Heat Sink Design Parameters, states that the maximum evaporation loss at design conditions (total both cells) is 571 gpm (2161 lpm).

Based on the staff's review of the appllicant's response, the desalinated water pump design capacity is not clear for CCNPP Unit 3 and neither is the available margin that would be maintained above its Technical Specification water level in the UHS basin.

Therefore, the applicant should provide information that clearly addresses this question.

(2) Regarding Bullet 7:

In response to the RAI, the applicant provided revised FSAR Figure 9.2-7, Raw Water and Desalinated Water System, which indicates specific location of RWSS equipment and major isolation valves. However, the figure does not show the flow path to the potable water system. This conflicts with CCNPP Unit 3 FSAR Sections 9.2.9.2 and 9.2.9.3 which state that a second pair of 100% capacity pumps is provided for potable water demand. The applicant should provide information that reconciles this apparent conflict.

(3) Regarding Bullet 10:

The revised FSAR Section 14.2.14.1 adequately describes the standby desalinated water transfer pump's automatic start upon sensing a low discharge pressure or upon the trip of the desalinated water transfer pump.

The applicant stated in its response that Section 9.2.9.3 would be revised to remove the desalinated water transfer pumps - Potable Water. However, this FSAR markup was not provided as part of the RAI response. Therefore, this markup should be provided.

1

For RAI 171, Q9.2.5-3, there is 1 follow up question.

The applicant's response to this RAI stated that an "evaluation of impact of a failure of the non-safety-related RWSS piping on the ESWS pumphouse buildings and ESWS cooling towers indicates that the RWSS piping has no impact on the ability of the ESWS pumphouse buildings and ESWS cooling towers to meet their intended safety function."

However, the applicant did not justify this conclusion was made.

The applicants response to Q9.2.5-2 stated that non-safety-related materials for the RWSS underground piping may include materials such as fiberglass reinforced plastic (FRP) or high density polyethylene (HDPE). Assuming a seismic event, the staff considers that all four trains of the non-safety-related pipes could be breached at their interface to the ESW pump house with the desalinated water transfer pumps running at high flow rate, continuing to feed the break. The applicant should describe in the CCNPP Unit 3 FSAR the impact of a seismic event on the ESWS pump house and the means by which the UHS cooling towers and ESWS components would continue to meet their intended safety function. The details of this evaluation should be provided.