Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24107A923 + (CBS Exemption (Attachment))
- ML24087A069 + (CBS Exemption (Attachment))
- ML24220A249 + (CBS Exemption (Attachment))
- ML24302A188 + (CBS Exemption Decision La Salle County Station (Attachment))
- ML24086A505 + (CBS Exemption Decision Quad Cities)
- ML24082A060 + (CBS Exemption Decision Watts Bar)
- ML24103A123 + (CBS Exemption Decision for Perry (Attachment))
- ML24302A184 + (CBS Exemption for LaSalle County Station ISFSI)
- ML11214A180 + (CBS New York - In-Ground Wall to Filter Water at N. Y. Nuke Site)
- ML23297A261 + (CBS Pec Presentation Slides)
- ML23313A116 + (CBS Pec Public Meeting)
- ML113470298 + (CC-780 Experience PDI-NRC Dec 2011)
- ML071570505 + (CC-AA-309-1001, Rev 1, Attachment 1, Design Analysis Major Revision Cover Sheet, 989-46-19-2, Rev 003, Calculation for Diesel Generator 2 Loading Under Design Bases Accident Condition)
- ML071570501 + (CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-1, Rev 003 Diesel Generator 3 Loading Under Design Bases Accident Condition)
- ML071570510 + (CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-3, Rev 004, Diesel Generator 2/3 Loading Under Design Bases Accident Condition)
- ML110050414 + (CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing)
- ML16243A479 + (CC1 R23 180-Day Steam Generator Tube Inspection Report)
- ML25251A028 + (CC2R26 180-Day Steam Generator Report)
- ML25105A198 + (CCCG Modeling and Treatment of Cross-Unit CCFs)
- ML20148M309 + (CCF Criteria Table)
- ML20148M310 + (CCF Criteria Table with Annotations for Nae - Staff Differences)
- ML17313A110 + (CCF Definition and Notes in NEI 16-16 (Draft 2))
- ML19066A292 + (CCF Memo from Cjf to Mxf (Rev 3))
- ML071930365 + (CCI Chemical Laboratory Bench Top Test Rev 0)
- ML19322A014 + (CCI Effectiveness Review Presentation November 20, 2019 ROP Public Meeting)
- ML20239A834 + (CCI Program History)
- ML20239A836 + (CCI Program Options Considered)
- ML19263G162 + (CCI Public Meeting Presentation September 2019)
- ML20199H153 + (CCNPP Emergency Response Exercise on 971118)
- ML20072J095 + (CCNPP Unit 1 Cycle 12 Summary of Startup Testing)
- ML20086E311 + (CCNPP Unit 2 Cycle 11 Summary of Startup Testing)
- ML20141G447 + (CCNPP Unit 2 Cycle 12 Startup Testing Rept)
- ML13319A932 + (CCNPP-BPPlan-002, Rev 0E, Small Scale Debris Bypass-Penetration Test Plan for Calvert Cliffs Nuclear Power Plant)
- ML13038A487 + (CCNPP-CHLE-001, Revision 0c, Chemical Effects Head Loss Experiment (Chle) Test Plan for Calvert Cliffs Nuclear Power Plant)
- ML13319A621 + (CCNPP-CHLE-003, Rev. 0d Chemical Effects PIRT Considerations for Calvert Cliffs Nuclear Power Plant)
- ML13319A679 + (CCNPP-CHLE-007, Appendix 1, Alkyd Coatings in Refined GSI-191 Chemical Effects Testing)
- ML13319A670 + (CCNPP-CHLE-007, Rev. G, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant)
- ML13224A103 + (CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant)
- ML13319A725 + (CCNPP-CHLE-009 Rev 2 Considerations for Using Marinite in CE Testing)
- ML11129A310 + (CCNPP3 Cola - Calvert Cliffs Unit 3 - Receipt of Revision 7 of COL Application (Docket No. 52-016))
- ML11129A312 + (CCNPP3 Cola - Ccnpp Chapter 2 Group 1)
- ML110211105 + (CCNPP3 Cola - FW: Calvert Cliffs Board Order (Admitting an Environmental Alternatives Contention))
- ML11129A313 + (CCNPP3 Cola - FW: EPR Wetbulb Vs C. Cliffs)
- ML103570099 + (CCNPP3 – COL - Draft RAI 286 Sbpa 5313)
- ML103620135 + (CCNPP3 – COL - Draft RAI 288 Rheb 5329)
- ML103620140 + (CCNPP3 – COL - Draft RAI 289 Rheb 5328)
- ML103560810 + (CCNPP3 – COL - Final RAI 283 Sbpa 5285)
- ML20041A291 + (CCTF-1 Uncertainty Analysis, Technical Rept)
- ML19309G840 + (CCTF-Operation & Maint Manual Instrumented Spool Piece & Downcomer Drag Disk Flow Measurement Sys, Interim Rept. Prepared for DOE)
- ML20259D212 + (CCW Bypass Status Inoperative Logic Diagram System:R-20. Sheet 3)
- ML20265D168 + (CCW Common Header Isolation Valves Logic Diagram System: Cc)