Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "CCI Program History". Since there have been only a few results, also nearby values are displayed.

⧼showingresults⧽

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML24107A923  + (CBS Exemption (Attachment))
  • ML24087A069  + (CBS Exemption (Attachment))
  • ML24220A249  + (CBS Exemption (Attachment))
  • ML24302A188  + (CBS Exemption Decision La Salle County Station (Attachment))
  • ML24086A505  + (CBS Exemption Decision Quad Cities)
  • ML24082A060  + (CBS Exemption Decision Watts Bar)
  • ML24103A123  + (CBS Exemption Decision for Perry (Attachment))
  • ML24302A184  + (CBS Exemption for LaSalle County Station ISFSI)
  • ML11214A180  + (CBS New York - In-Ground Wall to Filter Water at N. Y. Nuke Site)
  • ML23297A261  + (CBS Pec Presentation Slides)
  • ML23313A116  + (CBS Pec Public Meeting)
  • ML113470298  + (CC-780 Experience PDI-NRC Dec 2011)
  • ML071570505  + (CC-AA-309-1001, Rev 1, Attachment 1, Design Analysis Major Revision Cover Sheet, 989-46-19-2, Rev 003, Calculation for Diesel Generator 2 Loading Under Design Bases Accident Condition)
  • ML071570501  + (CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-1, Rev 003 Diesel Generator 3 Loading Under Design Bases Accident Condition)
  • ML071570510  + (CC-AA-309-1001, Rev 3, Attachment 1, Design Analysis Major Revision Cover Sheet, 9389-46-19-3, Rev 004, Diesel Generator 2/3 Loading Under Design Bases Accident Condition)
  • ML110050414  + (CC-AA-309-1001, Rev. 3, Hc Class 1E 125 Vdc Station Battery & Charger Sizing)
  • ML16243A479  + (CC1 R23 180-Day Steam Generator Tube Inspection Report)
  • ML25251A028  + (CC2R26 180-Day Steam Generator Report)
  • ML25105A198  + (CCCG Modeling and Treatment of Cross-Unit CCFs)
  • ML20148M309  + (CCF Criteria Table)
  • ML20148M310  + (CCF Criteria Table with Annotations for Nae - Staff Differences)
  • ML17313A110  + (CCF Definition and Notes in NEI 16-16 (Draft 2))
  • ML19066A292  + (CCF Memo from Cjf to Mxf (Rev 3))
  • ML071930365  + (CCI Chemical Laboratory Bench Top Test Rev 0)
  • ML19322A014  + (CCI Effectiveness Review Presentation November 20, 2019 ROP Public Meeting)
  • ML20239A836  + (CCI Program Options Considered)
  • ML19263G162  + (CCI Public Meeting Presentation September 2019)
  • ML20199H153  + (CCNPP Emergency Response Exercise on 971118)
  • ML20072J095  + (CCNPP Unit 1 Cycle 12 Summary of Startup Testing)
  • ML20086E311  + (CCNPP Unit 2 Cycle 11 Summary of Startup Testing)
  • ML20141G447  + (CCNPP Unit 2 Cycle 12 Startup Testing Rept)
  • ML13319A932  + (CCNPP-BPPlan-002, Rev 0E, Small Scale Debris Bypass-Penetration Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13038A487  + (CCNPP-CHLE-001, Revision 0c, Chemical Effects Head Loss Experiment (Chle) Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13319A621  + (CCNPP-CHLE-003, Rev. 0d Chemical Effects PIRT Considerations for Calvert Cliffs Nuclear Power Plant)
  • ML13319A679  + (CCNPP-CHLE-007, Appendix 1, Alkyd Coatings in Refined GSI-191 Chemical Effects Testing)
  • ML13319A670  + (CCNPP-CHLE-007, Rev. G, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13224A103  + (CCNPP-CHLE-007, Revision 0c, Coatings Bench-Top Autoclave Experiment Test Plan for Calvert Cliffs Nuclear Power Plant)
  • ML13319A725  + (CCNPP-CHLE-009 Rev 2 Considerations for Using Marinite in CE Testing)
  • ML11129A310  + (CCNPP3 Cola - Calvert Cliffs Unit 3 - Receipt of Revision 7 of COL Application (Docket No. 52-016))
  • ML11129A312  + (CCNPP3 Cola - Ccnpp Chapter 2 Group 1)
  • ML110211105  + (CCNPP3 Cola - FW: Calvert Cliffs Board Order (Admitting an Environmental Alternatives Contention))
  • ML11129A313  + (CCNPP3 Cola - FW: EPR Wetbulb Vs C. Cliffs)
  • ML103570099  + (CCNPP3 – COL - Draft RAI 286 Sbpa 5313)
  • ML103620135  + (CCNPP3 – COL - Draft RAI 288 Rheb 5329)
  • ML103620140  + (CCNPP3 – COL - Draft RAI 289 Rheb 5328)
  • ML103560810  + (CCNPP3 – COL - Final RAI 283 Sbpa 5285)
  • ML20041A291  + (CCTF-1 Uncertainty Analysis, Technical Rept)
  • ML19309G840  + (CCTF-Operation & Maint Manual Instrumented Spool Piece & Downcomer Drag Disk Flow Measurement Sys, Interim Rept. Prepared for DOE)
  • ML20259D212  + (CCW Bypass Status Inoperative Logic Diagram System:R-20. Sheet 3)
  • ML20265D168  + (CCW Common Header Isolation Valves Logic Diagram System: Cc)