Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18019A098 + (Bwx Technologies, Inc., Replacement Standby Trust Agreement)
- ML18096A694 + (Bwx Technologies, Inc., Response to Request for Additional Information on Revised Request to Amend License SNM-42, Chapter 5, Nuclear Criticality Safety)
- ML21286A152 + (Bwx Technologies, Inc., Response to Request for Additional Information to Amend License SNM-42, Chapter 5, Nuclear Criticality Safety)
- ML23255A047 + (Bwx Technologies, Inc., Revised Chapter 2 of the SNM-42 License Application)
- ML23255A053 + (Bwx Technologies, Inc., Revision to Chapter 1, General Information & Chapter 2, Organization and Administration, of License SNM-42 License Application)
- ML23241A043 + (Bwx Technologies, Inc., Semi-Annual Effluent Monitoring Report for First Half of 2023)
- ML18247A469 + (Bwx Technologies, Inc., Semi-Annual Effluent Monitoring Report)
- ML25064A085 + (Bwx Technologies, Inc., Semi-Annual Effluent Monitoring Report for 2024)
- ML21347A368 + (Bwx Technologies, Inc., State Air Permit Modification)
- ML19057A146 + (Bwx Technologies, Inc., Submittal of 2018 Semi-Annual Effluent Monitoring Report)
- ML19354A506 + (Bwx Technologies, Inc., Submittal of Certification of Financial Assurance Document)
- ML21225A045 + (Bwx Technologies, Inc., Submittal of Revisions to the Quality Assurance Plan for Shipping Program (QAP-0088))
- ML22143A893 + (Bwx Technologies, Inc., Submittal of Revision 25 and 26 Changes to the Quality Assurance Plan for Shipping Program (QAP-0088))
- ML18233A597 + (Bwxt Comments on Fuel Cycle Facility Effort Factor Matrix Options Discussed During the Aug 1, 2018 Public Mtg)
- ML18067A246 + (Bwxt Nuclear Operations Group- Lynchburg, Inc., Submittal of (Bwxt NOG-L), Fatigue Management Program Six (6) Month Performance Data Report)
- ML103620042 + (By 2050 Solar Power Could End U.S. Dependence on Foreign Oil and Slash Greenhouse Gas Emissions)
- ML20064H123 + (By 781220 Util Will Submit Appropriate Tech Spec Change Requests for Specs Table 2.2-1,Table 3.3-4, & Figure 3.6-1)
- ML13162A628 + (By Larry Doerflein: PRB Notes Attached-Dial-In Provided)
- ML19093A787 + (By Order of 02/09/1978, Commonwealth of VA Was Granted Leave to File Request for Hearing in Matter within Ten Days of the Issuance of Staff Safety Evaluation Report. Commonwealth Will Not Request Hearing in Matter)
- ML20262E427 + (By-Pass Flow Module Design Layout. Sheet 1 of 1. Consists of Three Aperture Cards)
- ML20087F134 + (Bypass Event Rendered Shutdown Cooling Mode of RHR Inoperable)
- ML12325A938 + (Bypass Fiber Quantity Test Plan)
- 05000352/LER-2025-001, Bypass Leakage on the B Train of Standby Gas Treatment System HEPA Filters Exceeded Technical Specification Value + (Bypass Leakage on the B Train of Standby Gas Treatment System HEPA Filters Exceeded Technical Specification Value)
- ML12366A295 + (Bypass Test Fiber Debris Preparation Method Comparison 11/8/2012_NRC)
- ML20034G279 + (Bypass Test Instrumentation for Vogtle Electric Generating Plant Units 1 & 2)
- ML12366A297 + (Bypass Testing Information)
- ML12319A444 + (Bypass Testing Information to NRC)
- ML20214Q733 + (Bypass Timer Calculation for Ads/Eccs Mod for Pilgrim Station)
- ML20112F743 + (Bypass Timer Calculation for Automatic Depressurization Sys Mod for Hatch Units 1 & 2)
- Regulatory Guide 1.47 + (Bypassed & Inoperable Status Indication for Nuclear Power Plant Safety Systems)
- ML18064A876 + (Bypassed Containment High Pressure Trips on Rps.Ler Contains Listed 12 New Commitments.No Revs to Existing Commitments Contained within Rept)
- ENS 40311 + (Bypassing the Pressure Suppression Function of the Torus)
- ML20054A511 + (Byproduct Matl License 04-00181-01,authorizing Use of I-131 for Diagnostic Studies of Patients W/Pancreatic Insufficiency & Diabetes)
- ML19276G529 + (Byproduct Matl License Has Expired & No Renewal Application Has Been Received.Forwards Form NRC-313 Application to Be Completed for License Renewal.Radioactive Matl Must Be Safely Stored Until New License Is Issued.W/O Encl)
- ML11089A076 + (Byron EP Exercise Intent to Play DRS)
- RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 3 + (Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 3 of 3)
- RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 3 + (Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 2 of 3)
- RS-12-161, Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 1 of 3 + (Byron Generating Station, Unit 1, 12Q0108.20-R-001, Rev. 1, Appendix C, Seismic Walkdown Checklist (Swc). Part 1 of 3)
- RS-12-161, Byron Generation Station, Unit 1, 12Q0108.20-R-002 Rev. 1, Seismic Walkdown Checklist (Swc). Part 2 of 2 + (Byron Generation Station, Unit 1, 12Q0108.20-R-002 Rev. 1, Seismic Walkdown Checklist (Swc). Part 2 of 2)
- BYRON 2006-0013, Byron June 2006 Examination Outline Submittal + (Byron June 2006 Examination Outline Submittal)
- RS-16-248, Byron Nuclear Station, Amendment 27 to Fire Protection Report, Chapter 3.0, Guidelines of BTP Cmeb 9.5-1 + (Byron Nuclear Station, Amendment 27 to Fire Protection Report, Chapter 3.0, Guidelines of BTP Cmeb 9.5-1)
- RS-16-248, Byron Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Specifications Bases + (Byron Nuclear Stations, Revision 16 to Updated Final Safety Analysis Report, Technical Specifications Bases)
- IR 05000454/2016201 + (Byron Station - NRC Security Inspection Report 05000454; 455/2016201 (Cover Letter Only))
- ML110040455 + (Byron Station Unit 1 and 2 NRC MC&A Program Inspection Report 05000454-10-406; 05000455-10-406 - Cover Letter Only)
- BYRON 2014-0030, Byron Station, Units 1 and 2 - Submittal of Initial Operator Licensing Examination Outline + (Byron Station, Units 1 and 2 - Submittal of Initial Operator Licensing Examination Outline)
- RS-14-053, Byron Station, Units 1 and 2, Exelon Generation Company, LLC Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report + (Byron Station, Units 1 and 2, Exelon Generation Company, LLC Response to March 12, 2012, Request for Information Enclosure 2, Recommendation 2.1, Flooding, Required Response 2, Flood Hazard Reevaluation Report)
- ML13155A420 + (Byron and Braidwood, Units 1 and 2 - License Renewal Application, Volume 1 of 4)
- ML13161A223 + (Byron and Braidwood, Units 1 and 2 - License Renewal Application)
- RS-09-050, Byron, Unit 2 - Requests for Relief for Alternate Examination Frequency - Attachments 1 Through 4 + (Byron, Unit 2 - Requests for Relief for Alternate Examination Frequency - Attachments 1 Through 4)
- RS-14-151, Byron, Units 1 and 2 - Attachment 2, Kld TR-637, Rev. 0, Development of Evacuation Time Estimates. Part 4 of 4 + (Byron, Units 1 and 2 - Attachment 2, Kld TR-637, Rev. 0, Development of Evacuation Time Estimates. Part 4 of 4)
- RS-14-151, Byron, Units 1 and 2 - Attachment 2, Kld TR-637, Rev. 0, Development of Evacuation Time Estimates. Part 1 of 4 + (Byron, Units 1 and 2 - Attachment 2, Kld TR-637, Rev. 0, Development of Evacuation Time Estimates. Part 1 of 4)