Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20266J568 + (Braze ASSY-ECD Body)
- ML20211G863 + (Brazos Electric Cooperative,Inc 1985 Annual Rept. TEX-LA Electric Cooperative of Texas,Inc Financial Statements for 1984 & 1985 Encl)
- ML20196B735 + (Brazos Electric Power Cooperative Inc 1987 Annual Rept)
- ML20128H039 + (Brazos Electric Power Cooperative,Inc 1984 Annual Rept)
- ML20214H299 + (Brazos Electric Power Cooperative,Inc 1986 Annual Rept. Tex-La Electric Cooperative of Texas,Inc Financial Statements for 861231 & 1985 & Accountants Rept Encl)
- ML100271673 + (Brdwd Intent to Play in the Incident Response Exercise)
- ML062770188 + (Brdwd Request for Information)
- 05000391/LER-2019-002, Breach Due to Penetration Boot Seal Separation Results in Shield Building Inoperability + (Breach Due to Penetration Boot Seal Separation Results in Shield Building Inoperability)
- ML24060A203 + (Breach Notification Plan)
- ML25084A156 + (Breach Notification Plan - v2.3 03-21/2025, Final)
- ML23130A383 + (Breach Notification Plan Final v2.0 2023 05 10)
- ML25007A204 + (Breach Notification Plan v2.2 2024-12-18 Final)
- ENS 49631 + (Breach Sizes Exceeded for Control Room Envelope)
- ENS 52597 + (Breach in Auxiliary Building Secondary Containment)
- ENS 47619 + (Breach in High Energy Line Break Barrier)
- Information Notice 1979-26, Breach of Containment Integrity + (Breach of Containment Integrity)
- ENS 40776 + (Breach of Primary Fission Product Barrier)
- 05000397/LER-2021-001, Breach of Secondary Containment + (Breach of Secondary Containment)
- ML20263B461 + (Break & Restraint Locations Auxiliary Steam and Condensate Piping. Sheet 1 of 5)
- 05000390/FIN-2015007-03 + (Break In Non-Seismic ERCW Discharge Piping)
- ML20141F698 + (Break Spectrum Analysis for Small Break LOSS-OF-COOLANT Accidents in a RESAR-3S Plant)
- ML20085A529 + (Break in Instrument Line or Lines from Primary Sys That Penetrate Containment & Loss of Nonemergency AC Power to Station Auxiliaries, Supplemental Info to FSAR Figures 15E.6.2 & 15E.2.6,respectively)
- 05000334/LER-1981-091-01, Break in Redundant Underground 12-inch Supply Header Resulted in Loss of Fire Water Sys.Caused by External Finger Corrosion Along Pipe Bottom.Total Sys Piping change-out Not Warranted + (Break in Redundant Underground 12-inch Supply Header Resulted in Loss of Fire Water Sys.Caused by External Finger Corrosion Along Pipe Bottom.Total Sys Piping change-out Not Warranted)
- ENS 50798 + (Breakdown in the Quality Assurance Program for Vogtle 3&4 Construction Project)
- ENS 50815 + (Breakdown in the Quality Assurance Program for V. C. Summer 2 & 3 Construction Project)
- Information Notice 1980-22, Breakdowns in Contamination Control Programs + (Breakdowns in Contamination Control Programs)
- 05000282/FIN-2012002-01 + (Breaker 212E-44 Failure due to Lack of Preventive Maintenance)
- ML073130444 + (Breaker Confirmatory Action Letter)
- ML20077R712 + (Breaker Coordination Evaluation for 125 Volt Dc Vital I&C Power Sys & 600 Volt Ac Essential Auxiliary Power Sys)
- ML18093A547 + (Breaker Coordination W/Respect to External & Internal Hazards)
- 05000255/LER-2008-002, Breaker Cubicle Switch Failure Results in High Pressure Safety Injection Pump Inoperability + (Breaker Cubicle Switch Failure Results in High Pressure Safety Injection Pump Inoperability)
- 05000361/LER-2002-002, Breaker Failure to Close Renders Containment Emergency Fan Inoperable for Longer than Allowed by Technical Specifications + (Breaker Failure to Close Renders Containment Emergency Fan Inoperable for Longer than Allowed by Technical Specifications)
- 05000362/LER-2002-002 + (Breaker Failure to Close renders Containment Emergency Fan Inoperable for Longer than Allowed by Technical Specifications)
- 05000423/LER-2002-002, Breaker Mechanism Failure Results in Inoperable Emergency Diesel Generator + (Breaker Mechanism Failure Results in Inoperable Emergency Diesel Generator)
- ML050840119 + (Breaker Shematic)
- ML022540136 + (Breaker Switch Failure at Columbia Generting Station)
- 05000296/LER-2024-002, Breaker Trip Automatically Started an Emergency Diesel Generator + (Breaker Trip Automatically Started an Emergency Diesel Generator)
- 05000373/FIN-2015001-04 + (Breakers Installed Beyond Design)
- 05000361/LER-2010-006, Breakers Left in Non-Seismically Qualified Condition Result in Condition Prohibited by Technical Specifications + (Breakers Left in Non-Seismically Qualified Condition Result in Condition Prohibited by Technical Specifications)
- 05000316/LER-2077-020, Breaking of East Centrifugal Charging Pump Shaft Between Third and Fourth Stage Impellers + (Breaking of East Centrifugal Charging Pump Shaft Between Third and Fourth Stage Impellers)
- ML23214A242 + (Breakout Questions - Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application)
- ML24156A154 + (Breakout Questions - Aging Management Audit - Perry Unit 1 - License Renewal Application)
- ML23172A147 + (Breakout Questions - Aging Management Audit - Comanche Peak Units 1 and 2 - License Renewal Application)
- ML25028A425 + (Breakout Questions - Aging Management Audit - Browns Ferry Units 1, 2, and 3 - Subsequent License Renewal Application)
- ML25080A136 + (Breakout Questions - Aging Management Audit - Dresden Units 2 and 3 SLR)
- ML25253A040 + (Breakout Questions - Aging Management Audit - Robinson Unit 2 SLR)
- ML24085A701 + (Breakout Questions - Aging Management Audit - VC Summer Unit 1 - Subsequent License Renewal Application)
- ML22024A003 + (Breakout Questions - Fire Protection Scoping and Screening)
- ML22024A004 + (Breakout Questions - Scoping - Letdown Cooler)
- ML22024A005 + (Breakout Questions - Scoping and Screening - Reactor Coolant System)
- ML22024A006 + (Breakout Questions - Structural Scoping and Screening)