Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19234A362 + (Attachment 2 - License Transfer Order)
- ML042740022 + (Attachment 2 - Licensees Presentation Slides)
- ML100321306 + (Attachment 2 - Markup of Proposed Operating License and Technical Specifications Pages)
- ML16068A131 + (Attachment 2 - Markup of Seabrook Station Emergency Action Levels -Initiating Conditions, Threshold Values and Basis)
- ML22332A450 + (Attachment 2 - Markup of Technical Specification Pages)
- RA-18-001, Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages + (Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages)
- ML18191A545 + (Attachment 2 - McGuire Technical Specification 3.8.1 Bases Marked Up Pages)
- ML083290592 + (Attachment 2 - Minnesota Natural Heritage Information System, Rare Features Database, Index Report of Records within 1 Mile Radius of Prairie Island)
- ML19290E326 + (Attachment 2 - NRC Form 741, Nuclear Material Transaction Report)
- ML15014A160 + (Attachment 2 - NRC Working Group Recommendations to Revise the Substantive Cross-Cutting Issue Process)
- ML17097A489 + (Attachment 2 - NUREG-2191 and NUREG-2192 (February 2017 Draft) Mechanical Comments)
- ML22220A200 + (Attachment 2 - NUREG-2194, Vol. 2, Rev. 1, Standard Technical Specifications, Westinghouse Advanced Passive 1000 Plants. Volume 2, Bases)
- ML18341A242 + (Attachment 2 - North Carolina State University Pulstar Reactor License and Technical Specification Changes for License Amendment Request for Fueled Experiments)
- ML12115A375 + (Attachment 2 - Notice of Appearance by Diane Curran)
- ML22327A209 + (Attachment 2 - Oqam Interim Revision 35a Mark-Up, Identifying Changes Through the Use of Strikeovers and Inserts)
- ML031530141 + (Attachment 2 - PSEG Nuclear LLC Presentation Hope Creek Extended Power Uprate for 05/08/2003 Meeting with PSEG Nuclear, LLC and General Electric Nuclear Energy, Regarding Hope Creek Generating Station Proposed Extended Power Uprate)
- ML16049A011 + (Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9)
- DCL-16-011, Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9 + (Attachment 2 - Pacific Gas and Electric Company Diablo Canyon Power Plant Units 1 and 2, Process Protection System (PPS) Replacement Interface Requirements Specification Nuclear Safety-Related, Rev 9)
- DCL-11-072, Attachment 2 - Potential Transformer Characteristic Ratio and Phase Angle Curve + (Attachment 2 - Potential Transformer Characteristic Ratio and Phase Angle Curve)
- ML031540426 + (Attachment 2 - Presentation Reduction of Unnecessary Regulatory Burden Initiative from 05/13/2003 Meeting Between U.S. Nuclear Regulatory Commission (NRC) Staff & Calvert Cliffs Nuclear Power Plant, Inc)
- ML051090141 + (Attachment 2 - Presentation Slides for Oconee Meeting to Discuss Tornado Mitigation Strategy)
- ML20002A658 + (Attachment 2 - Proposed App a 1032 Amd 5)
- ML20052D791 + (Attachment 2 - Proposed CoC Pages - (Non-Proprietary))
- ML22331A005 + (Attachment 2 - Proposed HI-STORE License/Technical Specifications)
- ML18179A106 + (Attachment 2 - Proposed HI-STORM FW CoC 1032, Amendment 5)
- ULNRC-06781, Attachment 2 - Proposed TS Bases Changes (Markups) + (Attachment 2 - Proposed TS Bases Changes (Markups))
- ML21294A396 + (Attachment 2 - Proposed Technical Specification Changes (Mark-Up))
- ML22140A134 + (Attachment 2 - Proposed Technical Specification Changes (Mark-Up))
- ML16047A342 + (Attachment 2 - Provides Large Number of Other Comments Received from Various NRC Staff Members Ranging from Specific Comments to Individual Staff Opinions)
- ML051190301 + (Attachment 2 - Regulatory Guide 1.1 - Net Positive Suction Head for Emergency Core Cooling and Containment Heat Removal System Pumps)
- ML22181B132 + (Attachment 2 - Replacement for Attachment 2, Proposed Technical Specification Changes (Mark-up), of ULNRC-06688)
- ML21014A350 + (Attachment 2 - Report and Analysis Summary)
- ML15246A129 + (Attachment 2 - Requests for Exemptions for STP Piloted Risk-Informed Approach to Closure for GS1-191 Through 3-3 Technical Specifications Bases Page Markups (Information Only))
- ML19317D394 + (Attachment 2 - Response to Request for Additional Information (Batch 2) on HI-STORM FW Amendment 5 (Non-Proprietary))
- ML20326A008 + (Attachment 2 - Response to Requests for Additional Information Part 6)
- ML14316A198 + (Attachment 2 - Responses to Request for Additional Information Questions)
- ML19037A293 + (Attachment 2 - Responses to Requests for Additional Information - Non-Proprietary)
- ML003732118 + (Attachment 2 - Review Criteria-S101221-02)
- ML22153A178 + (Attachment 2 - Revised Clean Technical Specifications)
- ML22349A044 + (Attachment 2 - Revised Pages to the University of Missouri Research Reactor Facility Emergency Plan)
- ML22343A263 + (Attachment 2 - Revision 5 to HI-2146312, Safety Analysis Report on the Hi_Star Atb IT Non-Fuel Waste Transport System)
- ML20356A330 + (Attachment 2 - SFSC Heat Removal System)
- ML061920330 + (Attachment 2 - SNC Slides for April 14, 2006 Public Meeting to Discuss Vogtle Early Site Permit Seismic Activities)
- ML070450100 + (Attachment 2 - Sequoyah Nuclear Plant - Plant Performance)
- ML20307A327 + (Attachment 2 - Standardized Radiological Emergency Plan Revision EP-AA-1002, Revision 37, Radiological Emergency Plan Annex for Byron Station)
- ML12030A278 + (Attachment 2 - State of New York� Letter to NRC Staff Concerning Scope of Disclosure Obligations Dated November 30, 2011)
- ML17325A566 + (Attachment 2 - Supplemental Information for HI-STORM 100 Amendment 11 (Non-Proprietary))
- ML14170A046 + (Attachment 2 - TS Bases Developmental Revision I Changes (Mark-Up) for WBN Unit 2)
- ML030450487 + (Attachment 2 - TVA Handout During 02/10/03 Meeting, Tennessee Valley Authority Browns Ferry Nuclear Plant, Unit 1 Restart Status)
- ML021220053 + (Attachment 2 - Table a - Administrative Changes North Anna, Units 1 and 2, Amendments 231 and 212)
- ML061240255 + (Attachment 2 - Table a - Administrative Changes for Monticello, Amendment 146 for the Conversion to the Improved Technical Specifications with Beyond-Scope Issues)