-I i~7 uE EIAG Hope Creek Extended Power
" PSEG ANuclear LLC Introductions/Meetin2 Obiectives
- Introduction
- Meeting Objectives
- Provide overview of Hope Creek EPU
- Discuss licensing approach
- Gain NRC insights from previous uprates 2
- Project Overview - R. Moore/D. McHugh
- GE14 Transition - D. Notigan
- EPU Licensing Approach - G. Salamon
- Technical Quality Assurance - D. Garchow
- Open Discussion 3
Nuclar LLC Project Overview 15% Licensed Power Uprate (to 3787 MWt)
- Evaluations performed for 120% OLTP
-I0% implemented in 2004
- Remaining increases in subsequent operating cycles
- No increase in Rx pressure 4
Auclear LLC Project Overview ELTR Process CLTR Process I
I i
I
-Reactor core and fuel performance (0200)
-Thermal-hydraulic stability (0202)
-ECCS LOCA performance (0407)
-Transient analyses (0900)
-ATWS (0902)
Fuel Dependent Evaluations Non-Fuel Dependent Evaluations PUSAR (GE14 equilibrium Core) 5
PSEG Nuclear LLC Project Overview Feasibility/Scoping study completed September, 2001 Company project approval April, 2002 Project team formed May, 2002 Major evaluation areas
- Environmental (PSEG)
Project oversight
- Grid stability (Independent system operator) 6
TtNclear LLC Pro ject Overview
- Upgrades and Replacements RF1 1 (in progress)
- Cooling tower fill and flow distribution
- 500 kV breaker indication Cycle 12 online
- 500 kV breaker installation RF12 (Fall 2004)
- Turbine moisture separators
- FW heater & turbine moisture separator level controls
- Stator water cooling pumps
- Isophase bus duct cooling 7
Pro'ect Overview Licensing Topical Areas
- ARTS/MELLLA
- EPU
- Core Thermal Power (3787 MWt)
- Tech Spec Changes
- Possible Containment Over Pressurization Credit
- Revised Rx Pressure / Temperature Limits
- GEXL Correlation
- SLMCPR 8
Nucear LLC Project Overview
- Current Status
- ARTS/IMELLLA project in progress
- Cycle specific evaluations included
- EPU project in progress
- GE14 fuel transition in progress 9
PSEG; Nu c lear LLC GE14 Fuel Transition
- GE 14 Fuel Design Present core Westinghouse and GE 9B (93% / 7%)
- Critical power calculations performed using GNF GEXL correlation Same process as Dresden/Quad Cities Cycle specific core limits from the reload process SRLR analysis from the reload process 10
uSEG Nuaxl6ee LLGC GE14 Fuel Transition
- Submittals
- GEXL - August 2003
- Cycle specific SLMCPR and associated Tech Spec changes - October 2003
- SRLR report - February 2004 11
1~
l L
Nuaclear LLC GE14 Fuel Transition - GESTAR II 3-D Neutronic Simulation AL Complete b,~TilH SLMCPR Services Support Storage Rack Criticality T/M Modeling Transient/LOCA Lattice Physics Modeling GE14 FSAR /Tech Specs 12
GEXL for SVEA-96+ fuel ANuclear LLC GNF
[
PSEG PSEG GNF GNF PSEG PSEG uiat fine Critical Power i Collection Matrix
. Generate CP data Using ABB method Fit critical power data to GEXL Generate pin-to-pin peaking for data collection Submit GEXL coffelation to NRC GNF SLMCPR Calc Determine additive constants and bundle R-factors Statistical Comparison l
to ABB Test Data Qualify GEXL correlation bias and uncertainties 13
D PSECa Nldear LL C GE14 Fuel Transition Independent reviews/validations Design review of GEXL test matrix (PSEG/GE)
FMEA for GEXL correlation/calculations (PSEG/GE)
Engineering design reviews planned (PSEG/GE)
- Nuclear design
- T/H model
- T/M model
- RLP Independent validation using W computer codes 14
Schedule 10/04 RFO t
+
1-4 I
I I
I I
I I
I I
I I
8/03 9/03 10/03 NucSEa M3u dearz. LLGC MELLLA LCR EPU LCR GEXL Correlation Cycle Specific Reload Analysis (SRLR)
SLMCPR/
GE14 Transition LCR 6/03 02/04 15 I
I
PSEG Auclear LLCTechnical Quality Assurance Industry proven project management approach Integrated team Work to the schedule Regular communications Expeditious RAI resolutions Industry benchmarking/OE
- Independent verification
- Vendor quality assessments
- PSEG oversight 16
Nuclear LLC Open Discussion
- Comments
- Questions and Answers 17