Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20265C499 + (Area CA9 HV & AC Plan Elev 30 Ft 0 Inches to 9 Ft 0 Inches)
- RA-05-004, Area Classification Change: Storm Drains (D3500) - Section 7 + (Area Classification Change: Storm Drains (D3500) - Section 7)
- ML20266A395 + (Area No 3 Turbine Building Plan at Elevation 150 O)
- ML20266A399 + (Area No 3 Turbine Building Plan at Elevation 165 O)
- ML20262H497 + (Area Piping Composite Containment El 114 Ft 6 Inches & 120 Ft 10 Inches Area 11 Unit 1)
- ML20259D375 + (Area Piping Composite Containment El 114 Ft 6 Inches & 120 Ft 10 Inches Area II-Unit 1)
- ML20262H500 + (Area Piping Composite Containment El 135 Ft 4 Inches,140 Ft & 147 Ft 7 Inches Area 11 Unit 1)
- ML20262H506 + (Area Piping Composite Containment El 161 Ft 10 Inches & El 170 Ft Area 11 Unit 1)
- ML20262H508 + (Area Piping Composite Containment El 184 Ft 6 Inches Area 11 Unit 1)
- ML20262H519 + (Area Piping Composite Containment Misc Partial Plans & Sections Unit 1)
- ML20261B730 + (Area Radiation Monitor Cabinet 1H13-P844)
- ENS 52946 + (Area Radiation Monitor Failure)
- ENS 48407 + (Area Radiation Monitor Used for Emergency Assessment Failed)
- ENS 51094 + (Area Radiation Monitors Non-Functional During Planned Bus Outage)
- ML20263S670 + (Area Radiation Monitors System Instrumentation Engineering Diagram)
- ENS 46717 + (Area Telephone Outage Affects Emergency Notification System Phone)
- ML12349A292 + (Area Walk-By Checklist, Page 1 - Page 90)
- ML12349A293 + (Area Walk-by Checklist, Page 91 - Page End)
- ML20210M890 + (Area of Focus - Boron Redistribution)
- ML20091G387 + (Area of Focus - Helical Tube Steam Generator Design)
- ML20349G934 + (Areal Extent & Isopachs of the Shell Zone Utley Limestone)
- ML18053A254 + (Areas 1-5 Clarification)
- ML19249D369 + (Areas Around Nuclear Facilities Should Be Better Prepared for Radiological Emergencies, Rept to Us Congress by Comptroller General)
- 05000348/FIN-2008006-02 + (Areas Where Omas Are Performed DID Not Have Elus Installed)
- ML23232A004 + (Areas for Clarification Requested by the NRC Regarding the Nine ARCAP-TICAP ISGs and DG-1404)
- ML21180A259 + (Areas for Discussion)
- ENS 47931 + (Areement State Report - Stolen Troxler Moisture Density Gauge)
- ML17317A475 + (Areva - Application for Revision 4 to Certificate of Compliance No. 9358 for the Model No. TN-LC, Docket No. 71-9358)
- ML18022A312 + (Areva - Request for Transfer of Certificate of Compliance (CoC) for the Model Nos. SP-1, SP-2, and SP-3 Packaging)
- DCL-13-021, Areva Affidavit for Areva Calculations 32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and 32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer N + (Areva Affidavit for Areva Calculations #32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and #32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Noz)
- ML13078A292 + (Areva Affidavit for Areva Calculations 32-9199805-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis (Proprietary) and 32-9199937-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Nozzl)
- ML15282A259 + (Areva Affidavits)
- L-MT-14-042, Areva Atrium 10XM Fuel Transition - Errata Re License Amendment Request + (Areva Atrium 10XM Fuel Transition - Errata Re License Amendment Request)
- ML14132A194 + (Areva Atrium 10XM Fuel Transition - Response to Request for Additional Information)
- ML14077A302 + (Areva Atrium 10XM Fuel Transition - Response to Request for Additional Information)
- ML14035A298 + (Areva Atrium 10XM Fuel Transition - Response to Request for Additional Information)
- L-MT-14-033, Areva Atrium 10XM Fuel Transition - Supplement to Describe the Effect of Local Power Range Monitor Surveillance Grace Period + (Areva Atrium 10XM Fuel Transition - Supplement to Describe the Effect of Local Power Range Monitor Surveillance Grace Period)
- L-MT-14-088, Areva Atrium 10XM Fuel Transition License Amendment Request Supplement + (Areva Atrium 10XM Fuel Transition License Amendment Request Supplement)
- DCL-13-021, Areva Calculation 32-9200291-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Nozzles (Non-Proprietary) + (Areva Calculation #32-9200291-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Nozzles (Non-Proprietary))
- ML101400407 + (Areva Calculation 32-9135800-001, DB-1 CRDM Nozzle Weld Anomaly Flaw Evaluation of Idtb Repair, Enclosure C)
- ML101400406 + (Areva Calculation 32-9136508-002, DB-1 CRDM Nozzle J-Groove Weld Flaw Evaluation for Idtb Repair, Enclosure B)
- ML101400405 + (Areva Calculation 32-9136884-001, DB-1 CRDM Nozzle Weld Anomaly Flaw Evaluation of Idtb Alternate Repair with Alloy 52M/82, Enclosure a)
- DCL-13-021, Areva Calculation 32-9200249-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis - Non Proprietary + (Areva Calculation 32-9200249-000, Diablo Canyon Power Plant Unit 2 Pzr Safety and Spray Nozzles Planar Flaw Analysis - Non Proprietary)
- ML13078A291 + (Areva Calculation 32-9200291-000, DCPP Unit 2 - Evaluation of Laminar Indications in Pressurizer Nozzles (Non-Proprietary))
- RS-15-236, Areva Calculation 32-9244389-000, Revision 0, Byron/Braidwood RVCH Nozzle Idtb Repair Weld Anomaly. + (Areva Calculation 32-9244389-000, Revision 0, Byron/Braidwood RVCH Nozzle Idtb Repair Weld Anomaly.)
- ML15259A050 + (Areva Calculation 32-9244389-000, Revision 0, Byron/Braidwood RVCH Nozzle Idtb Repair Weld Anomaly)
- ML16320A036 + (Areva Calculation 32-9244389-001, Byron/Braidwood RVCH Nozzle Idtb Repair Weld Anomaly)
- RS-15-236, Areva Calculation 32-9244434-000, Revision 0, Byron and Braidwood RVCH Nozzle As-Left J-Groove Analysis + (Areva Calculation 32-9244434-000, Revision 0, Byron and Braidwood RVCH Nozzle As-Left J-Groove Analysis)
- ML16320A037 + (Areva Calculation 32-9244434-002, Byron and Braidwood RVCH Nozzle As-Left J-Groove Analysis)
- ML16320A038 + (Areva Calculation 51-9252998-002, Byron Units 1 & 2, and Braidwood Units 1 & 2 Idtb Reactor Vessel Head Penetration Nozzle Weld Repair-Life Assessment Summary)
- ML110680289 + (Areva Calculation No. 32-9138066-000, NMP-1 CRD Housing Idtb Weld Anomaly Analysis. (Non-Proprietary))