Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "993754-1-868 (-NP), Revision 1, Software Verification Test Plan". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML11319A067  + (993754-1-906(NP), Revision 0, Software Development Plan (Sdp))
  • ML11319A068  + (993754-1-909(NP), Revision 0, Software Configuration Management Plan (Scmp))
  • ML11319A072  + (993754-1-910(NP), Revision 1, Software Integration Plan (Sintp))
  • ML11319A071  + (993754-1-911(NP), Revision 1, Software Safety Plan (Ssp))
  • ML11319A066  + (993754-1-912(NP), Revision 0, DI&C-ISG-04 Conformance Report)
  • ML11319A064  + (993754-1-913(NP), Revision 0, Regulatory Guide 1.152 Conformance Report)
  • ML11318A029  + (993754-1-914(NP), Revision 0, System Architecture Description (Sad))
  • ML11318A030  + (993754-1802(NP), Revision 1, Software Verification and Validation Plan (Svvp))
  • ML11318A028  + (993754-1813(NP), Revision 0, Validation Test Plan (Vtp))
  • ML11318A027  + (993754-1905(NP), Revision 1, Project Management Plan (Pmp))
  • ML19234A037  + (9990001/2019002 Automated Packaging Systems)
  • ML23186A084  + (99902095 - Oklo - Public Slides - June 2023 - Presentation (1))
  • ML040150524  + (9:00 A.M. Transcript of Public Meeting Results of the Restart Readiness Assessment Team and Management and Human Performance Team Inspections)
  • ML030900334  + (9:00 Am Notice of Significant Meeting Between NRC and Firstenergy Nuclear Operating Co. to Discuss the Licensees Radiation Protection Program Restart Readiness)
  • ML040120769  + (9:30 A.M. Transcript of Public Meeting Corrective Action Team Inspection at Davis-Besse)
  • ML25098A018  + (9April2025 Public Meeting - NRC Environmental Report Meeting - Last Energy Presentation)
  • ML16061A468  + (9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV)
  • ML24114A262  + (9TH Workshop on Vendor Oversight - Program)
  • ML21134A242  + (9_AN2-2021-03 Final Operating Test)
  • ML22208A265  + (9_CNS-2022-06 Final Operating Test)
  • ML20042C436  + (9_RAI 2-15_RPP-6924, Rev. 01, Statistical Methods for Estimating the Uncertainty in the Best Basis Inventories)
  • ML22354A257  + (9_RBS-2022-12 Final Operating Test (Combined))
  • ML18333A348  + (9_W3-2018-11 Final Operating Test)
  • Information Notice 2017-05, : Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature  + ( : Potential Binding of Schneider Electric/Square-D Masterpact Nt and Nw 480-Vac Circuit Breaker Anti-Pump Feature )