Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "993754-1-812 (-NP), Revision 1, DCPP PPS Validation Test Specification". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • IR 05000250/2021040  + (95001 Supplemental Inspection Report 05000250/2021040 and 05000251/2021040)
  • IR 05000395/2024040  + (95001 Supplemental Inspection Report 05000395/2024040 and Follow-Up Assessment Letter)
  • IR 05000397/2024040  + (95001 Supplemental Inspection Report 05000397/2024040 and Follow-Up Assessment Letter)
  • IR 05000346/2022040  + (95001 Supplemental Inspection Report 05000346/2022040 and Follow-Up Assessment Letter)
  • IR 05000333/2025041  + (95001 Supplemental Inspection Report 05000333/2025041 and Follow-Up Assessment Letter)
  • IR 05000391/2024040  + (95001 Supplemental Inspection Report 05000391/2024040 and Follow-Up Assessment Letter)
  • IR 05000260/2025040  + (95001 Supplemental Inspection Report 05000260/2025040 and Follow-Up Assessment Letter)
  • IR 05000483/2022040  + (95001 Supplemental Inspection Report 05000483/2022040 and Follow-Up Assessment Letter)
  • IR 05000461/2019040  + (95001 Supplemental Inspection Report 05000461/2019040 and Assessment Follow-up Letter)
  • IR 05000348/2023040  + (95001 Supplemental Inspection Report 05000348/2023040 and Follow-Up Assessment Letter)
  • IR 05000395/2023441  + (95001 Supplemental Inspection Report 05000395/2023441 and Follow Up Assessment Letter)
  • IR 05000318/2025040  + (95001 Supplemental Inspection Report 05000318/2025040 and Follow-Up Assessment Letter)
  • ML23167B172  + (95001 Supplemental Inspection Report 05000265/2023040 and Follow-Up Assessment Letter)
  • IR 05000390/2024440  + (95001 Supplemental Inspection Supplemental Report 05000390-2024440 and 05000391-2024440 and Follow-Up Assessment Letter)
  • ML25099A013  + (95001 Supplemental Inspection Supplemental Report 05200025/2025040 and Follow-Up Assessment Letter)
  • IR 05000414/2025040  + (95001 Supplemental Inspection Supplemental Report 05000414 2025040 and Follow Up Assessment Letter)
  • IR 05000281/2020040  + (95001 Supplemental Inspection Supplemental Report 05000281/2020040)
  • 95001 Supplemental- 2 White PIs Inspection (Grand Gulf 2019)  + (95001 Supplemental- 2 White PIs)
  • ML19364A239  + (95MOST-RF3, Rev. 18 Cimarron Facility Final Status Survey Plan Phases I, II, and III)
  • ML21292A221  + (96 Upgrade Testing for the Model No. HFIR Package)
  • ML19364A231  + (96MOST-RF1, Rev. 1, Cimaron Facility Ground Water and Surface Water Monitoring Locations)
  • ML11319A070  + (993754-1-801(NP), Revision 0, Software Quality Assurance Plan (Sqap))
  • ML13004A471  + (993754-1-801, Rev. 1, Pacific Gas & Electric Co Nuclear Safety-Related Process Protection System Replacement Diablo Canyon Power Plant, Software Quality Assurance Plan)
  • ML14205A037  + (993754-1-811 (-NP), Revision 1, Failure Modes and Effects Analysis)
  • DCL-14-034, 993754-1-811 (-NP), Revision 1, Failure Modes and Effects Analysis  + (993754-1-811 (-NP), Revision 1, Failure Modes and Effects Analysis)
  • ML14205A038  + (993754-1-819 (-NP), Revision 0, Reliability Analysis)
  • DCL-14-034, 993754-1-819 (-NP), Revision 0, Reliability Analysis  + (993754-1-819 (-NP), Revision 0, Reliability Analysis)
  • ML14205A039  + (993754-1-868 (-NP), Revision 1, Software Verification Test Plan)
  • DCL-14-034, 993754-1-868 (-NP), Revision 1, Software Verification Test Plan  + (993754-1-868 (-NP), Revision 1, Software Verification Test Plan)
  • ML11319A067  + (993754-1-906(NP), Revision 0, Software Development Plan (Sdp))
  • ML11319A068  + (993754-1-909(NP), Revision 0, Software Configuration Management Plan (Scmp))
  • ML11319A072  + (993754-1-910(NP), Revision 1, Software Integration Plan (Sintp))
  • ML11319A071  + (993754-1-911(NP), Revision 1, Software Safety Plan (Ssp))
  • ML11319A066  + (993754-1-912(NP), Revision 0, DI&C-ISG-04 Conformance Report)
  • ML11319A064  + (993754-1-913(NP), Revision 0, Regulatory Guide 1.152 Conformance Report)
  • ML11318A029  + (993754-1-914(NP), Revision 0, System Architecture Description (Sad))
  • ML11318A030  + (993754-1802(NP), Revision 1, Software Verification and Validation Plan (Svvp))
  • ML11318A028  + (993754-1813(NP), Revision 0, Validation Test Plan (Vtp))
  • ML11318A027  + (993754-1905(NP), Revision 1, Project Management Plan (Pmp))
  • ML19234A037  + (9990001/2019002 Automated Packaging Systems)
  • ML23186A084  + (99902095 - Oklo - Public Slides - June 2023 - Presentation (1))
  • ML040150524  + (9:00 A.M. Transcript of Public Meeting Results of the Restart Readiness Assessment Team and Management and Human Performance Team Inspections)
  • ML030900334  + (9:00 Am Notice of Significant Meeting Between NRC and Firstenergy Nuclear Operating Co. to Discuss the Licensees Radiation Protection Program Restart Readiness)
  • ML040120769  + (9:30 A.M. Transcript of Public Meeting Corrective Action Team Inspection at Davis-Besse)
  • ML25098A018  + (9April2025 Public Meeting - NRC Environmental Report Meeting - Last Energy Presentation)
  • ML16061A468  + (9Revision 1 to 93754-12-862-NP, V&V Implementation Phase Summary Report PPSII-IV)
  • ML24114A262  + (9TH Workshop on Vendor Oversight - Program)
  • ML21134A242  + (9_AN2-2021-03 Final Operating Test)
  • ML22208A265  + (9_CNS-2022-06 Final Operating Test)
  • ML20042C436  + (9_RAI 2-15_RPP-6924, Rev. 01, Statistical Methods for Estimating the Uncertainty in the Best Basis Inventories)