Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25339A133 + (57243-EN 57243_13 - RSCC Dba Marmon - Update 20251204 - Attachments Removed - No Proprietary Information)
- ML24274A124 + (57243-EN 57243_4 - Rssc Dba Marmon - Update 20240926 - Redacted)
- ML24302A277 + (57243-EN 57243_5 - Rssc Dba Marmon - Update 20241030)
- ML25097A281 + (57243-EN 57243_7 - RSCC Dba Marmon - Update 20250328)
- ML24330A242 + (57437-EN 57437 - FitzPatrick - Web Links Removed)
- ML24365A117 + (57483-EN 57483 - Attachment Removed - Part 21 Report. Ametek Solidstate Controls Interim Part 21 Notification)
- ML25238A018 + (57483-EN 57483 - Update - Final Report - Ametek)
- ML25050A042 + (57484-EN 57484 - Final Report Notification Pursuant to 10 CFR 21.21 Regarding Limitorque SMB-00 Torque Switch Assemblies)
- ML25127A255 + (57599-EN 57599_1 - Curtis Wright - Update 20250506 (002) - Redacted)
- ML25099A160 + (57654-EN 57654 - Curtis Wright, GE Over/Under Voltage Time Delay Relay Pn: 12IAV69A1A)
- ML25100A099 + (57654-EN 57654 - Curtiss Wright - Update 1 (003))
- ML25162A273 + (57753-EN 57753 Callaway - Framatome, Inc. Notification of 10 CFR 21 Defect)
- ML25174A178 + (57770-EN 57770 - Cooper Dgjw Water Pump Failure - Attachments Removed)
- ML25210A055 + (57827-EN 57827 - Curtis Wright - Redline Version - No Proprietary Information - Attachment Removed)
- ML25317A675 + (57981-En 57981 - Paragon Energy Solutions, Potential Deviation Related to Stryten (Formally Gnb) N&M Series Flooded Batteries Installed in 24VDC, 48VDC, 125VDC and 250VDC Station Battery Strings)
- ML25317A676 + (57988-EN 57988 - Engine Systems, Inc, Report No. 10CFR21-0139, Rev. 0)
- ML18193A724 + (58)
- ML11214A200 + (58 Miscellaneous Photographs)
- ML23068A443 + (58. Renewed Certificate of Compliance No. 1014, Amendment No. 14)
- ML25330A126 + (58060-EN 58060 - Rosemount Model 3154)
- ML26029A103 + (58135-EN 58135 - Paragon Energy Solutions - Defective Electric Actuator. Defect with Schneider Electric Actuator Part Number MA-418-0-0-4)
- ML26033A212 + (58139-EN 58139 - Engine Systems Inc. - EMD EDG Cylinder Head Cracking)
- ML18213A398 + (588775 Conversation Record for University of Notre Dame to License No. 13-01983-15)
- ML071040017 + (59 FRN 12990, Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations)
- ML23068A444 + (59. Renewed Certificate of Compliance No. 1014, Amendment No. 14, Appendix a)
- ML18109A107 + (594655)
- ML18129A207 + (599800 Fee Sheet for National Aeronautics & Space Administration to License No. 34-00507-16)
- ML14071A159 + (5: Fact Sheet for NPDES Permit WA002515-1, Columbia Generating Station)
- 05000263/LER-1977-024-05, 5:on 771004,RCIC-9 Turbine Exhaust Line Check Valve Found Leaking in Excess.Caused by Improper Seating Due to Bent Disc Washer.Damaged Parts Replaced & Stop Added to Prevent Striking + (5:on 771004,RCIC-9 Turbine Exhaust Line Check Valve Found Leaking in Excess.Caused by Improper Seating Due to Bent Disc Washer.Damaged Parts Replaced & Stop Added to Prevent Striking)
- 05000254/LER-1989-005-08, 5:on 890522,RCIC Declared Inoperable Due to Differential Pressure Indicating Switch Failure to Calibr Properly.Caused by Worn Trip Setpoint Locking Mechanism. Switch Replaced & New Switch Calibr + (5:on 890522,RCIC Declared Inoperable Due to Differential Pressure Indicating Switch Failure to Calibr Properly.Caused by Worn Trip Setpoint Locking Mechanism. Switch Replaced & New Switch Calibr)
- ML20263N360 + (5KV MVP Electric Penetration Assembly. Sheet 1 of 1)
- ML22200A269 + (5Q1.2-302, Rev. 31, Proceduradiation Monitoring - Water Sampling Analysis)
- ML19261A490 + (5WG Memo to EDO)
- ML20135H209 + (5_13 Email of NEI Submittal of Response to RAI NEI 14-05A, Revision 1)
- ML21138A887 + (5_7 Email Transmittal for Fee Waiver Request for NEI 99-01 Rev 7)
- ML24129A065 + (5_8_24 Meeting Handouts - Active Traveler Summary Report and Priorities)
- ML24129A066 + (5_8_24 Meeting Handouts - History of Traveler Adoption)
- ML24129A067 + (5_8_24 Meeting Handouts - Proposed Change to the PWR ECCS Mode 4 Requirements)
- ML21137A288 + (5_AN2-2021-03 Draft Operating Test)
- ML20042C432 + (5_Email from Doug Deford with Calculation for RAI 3-1)
- ML22354A253 + (5_RBS-2022-12 Draft Operating Test)
- ML18333A344 + (5_W3-2018-11 Draft Operating Test)
- ML18193A739 + (6)
- ML14036A111 + (6 & 54 to Plant Operating Manual EM-102 & EM-104, Operation of the Technical Support Center)
- ML25016A263 + (6 - Constellation OE)
- ML25280A090 + (6 - DID & Integrated Risk Evaluation)
- ML25059A186 + (6 - Duke OE)
- ML26015A213 + (6 - EPRI NDE Workplan)
- ML25016A264 + (6 - Entergy OE)
- ML24067A012 + (6 - NRC - Workshop3 - Best Estimate Dose)
- ML21167A104 + (6 - PRA Acceptability - Future Oversight of Risk-Informed Initiatives)