Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML033010463 + (5 to EI-4-2, Operational Support Center Activation)
- ML040500252 + (5 to EI-4.3, Emergency Operations Facility Activation)
- ML013510303 + (5 to EIP-ZZ-C0010, Emergency Operations Facility Operations)
- ML040140262 + (5 to EM-102, Operation of the Technical Support Center)
- ML040220123 + (5 to EM-216, Duties of the Fire Brigade)
- ML022460414 + (5 to EP-PS-104, Radiation Protection Coordinator (Rpc): Emergency Plan - Position Specific Procedure)
- ML031960127 + (5 to EP-PS-105, TSC Dose Calculator: Emergency Plan-Position Specific Procedure)
- ML031920059 + (5 to EP-PS-115, Chemistry Sampling Team: Emergency Plan-Position Specific Procedure)
- ML022460395 + (5 to EP-PS-127, Technical Support Center (TSC) Communicator: Emergency Plan - Position Specific Procedure)
- NLS2004016, 5 to EPIP 5.7.9, Activation of Eof + (5 to EPIP 5.7.9, Activation of Eof)
- ML010290051 + (5 to EPIP HP/0/B/1009/008 Contamination Control of Injured Individuals)
- ML040570063 + (5 to EPIP-4.08, Initial Offsite Release Assessment and Revision 15 to EPIP-4.09, Source Term Assessment)
- ML040120554 + (5 to EPIP-EPP-08, Revision 15 to EPIP-EPP-23, Revision 10 to EPIP-EPP-25, and Revision 11 to EPMP-EPP-08)
- ML022100505 + (5 to EPMP-EPP-0101, Nine Mile Point, Unit 1 Emergency Classification Technical Bases)
- NL-15-1569, 5 to Emergency Plan + (5 to Emergency Plan)
- ML17033B606 + (5 to Emergency Plan MP-26-EPl-EPMP)
- ML15233A289 + (5 to Emergency Plan. Appendices)
- ML22042B305 + (5 to Fire Protection Report - Volume 1 - Redacted)
- ML23291A342 + (5 to Fire Protection Review Report, List of Effective Pages)
- ML20335A131 + (5 to Licensing Requirements Manual (LRM) Quick Index)
- ML040280345 + (5 to NIP-EPP-01, Emergency Response Organization Expectations and Responsibilities)
- ML033010518 + (5 to OEP-ADM-1319.01, Oyster Creek Emergency Preparedness Program)
- HNP-03-145, 5 to PEP-310, Notifications and Communications + (5 to PEP-310, Notifications and Communications)
- ML20053A298 + (5 to Procedure EP-30-1, Steam Generator Tube Leak/Rupture (Ppls Unblocked))
- ML040400194 + (5 to Procedure No. EI-4.3, Emergency Operations Facility Activation)
- ML19351G226 + (5 to QA Program for Facilities)
- ML101270436 + (5 to Radioactive Waste Process Control Program Manual)
- ML021700312 + (5 to River Bend Station - Emergency Plan)
- ML091040716 + (5 to Safstor Offsite Dose Calculation Manual)
- LIC-03-0151, 5 to TSC-8, Core Damage Assessment and Revised EPIP Index Page 1 and 2 + (5 to TSC-8, Core Damage Assessment and Revised EPIP Index Page 1 and 2)
- RS-21-107, 5 to Technical Requirements Manual + (5 to Technical Requirements Manual)
- ML073200066 + (5 to Technical Requirements Manual, Volume I)
- ML20151L139 + (5 to Technical Requirements Manual, for Plant)
- ML18197A078 + (5 to Technical Specifications Bases Manual)
- ML24297A651 + (5 to UFSAR, Technical Specification Bases Changes, Technical Requirements Manual Changes, Summary Report and Revised NRC Commitments Reports, Figures and Graphs)
- ML20268A391 + (5 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102002, Rev. 112, Sheet 5, Condensate System)
- ML20268A450 + (5 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108003, Sheet 3, Rev. 81, Feedwater System)
- ML20268B041 + (5 to Updated Final Safety Analysis Report, Chapter 7, Drawing 445650, Sheet 1, Rev. 7, Separation & Color Code Instrumentation & Control Engineered Safety Features)
- ML21125A315 + (5 to Updated Final Safety Analysis Report, Chapter 11, Figures (Redacted))
- ML20268A903 + (5 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102014, Rev. 56, Sheet 7)
- ML20268A599 + (5 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108023, Rev. 59, Sheet 14, Component Cooling Water System)
- ML20268B038 + (5 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441327, Rev. 14, Sheet 1, Electrical Schematic Diagram Solenoid Valves Chemical & Volume Control System)
- ML20268A522 + (5 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108018, Rev. 20, Sheet 3A)
- ML20268B171 + (5 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441490, Sheet 1, Rev. 19, Electrical Schematic Diagram Containment Purge System)
- ML20335A139 + (5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features)
- ML20268A362 + (5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features)
- ML22193A138 + (5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features)
- ML23180A034 + (5 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features)
- ML20268A875 + (5 to Updated Final Safety Analysis Report, Chapter 3, Drawing 108014, Sheet 16)
- ML20268B145 + (5 to Updated Final Safety Analysis Report, Chapter 7, Drawing 441296, Sheet 1, Rev. 11, Electrical Schematic Diagram Main Steam Isolation Valves)
- ML20268A735 + (5 to Updated Final Safety Analysis Report, Chapter 3, Drawing 102019-6A, Rev. 82, Sheet 6A)