Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML21265A308 + (3. Email Response to Requests for Additional Information)
- ML25181A195 + (3. Enclosure 2 - Amendment 1 to SNM-2013 (Public - Redacted))
- ML090860789 + (3. FEMA Response to NRC Regarding Farley TARs Seven Question, FEMA Memo from Burnside, January 16, 2009)
- ML23250A326 + (3. Final CoC 1031 Amendment 0 Revision 2, TS Appendix a)
- ML24324A365 + (3. Final CoC 1031 Amendment 13 TS Appendix a)
- ML25042A641 + (3. Final CoC 1031 Amendment 14 TS Appendix a)
- ML25211A338 + (3. Final Safety Evaluation Report or CoC No. 1042, Amendment No.4 for the NUHOMS Eos System)
- ML21308A608 + (3. Non-Proprietary Slide Presentation from 10-22-21 pre-application Meeting (Public))
- ML23030B794 + (3. Proposed Certificate of Compliance No. 1032, Amendment 7, Appendix a)
- ML24312A181 + (3. Proposed CoC 1014 Amendment No. 19 Appendix B)
- ML22220A152 + (3. Proposed CoC 1031 Amendment 0 Revision 2 TS Appendix a)
- ML24075A117 + (3. Proposed CoC 1031 Amendment 13 TS Appendix B)
- ML24211A241 + (3. Proposed CoC 1031 Amendment 14 TS Appendix a)
- ML24340A133 + (3. Proposed CoC 1031 Amendment 15 Technical Specifications Appendix B)
- ML24179A264 + (3. Proposed CoC No. 1040, Amendment No. 0, Revision 1, Appendix a)
- ML21174A127 + (3. Proposed Renewed CoC 1027 Amendment 1)
- ML24242A049 + (3. Proposed Renewed CoC No. 1025 Amendment No. 6 Revision 1, Appendices a and B)
- ML21125A106 + (3. Proposed TS - CoC No. 1042 Amendment 2)
- ML22354A266 + (3. Proposed Technical Specifications Appendix a for CoC No. 1026, Renewed Amendment No. 0)
- ML23068A387 + (3. Renewed Certificate of Compliance No. 1014, Amendment No. 0, Appendix a)
- ML21316A195 + (3. Technical Specifications (Appendix B) for CoC No. 1008, Renewed Amendment No. 0)
- ML102880487 + (3.1 Inadequate Air Content)
- ML12065A169 + (3.1 Reactivity Control Systems)
- ML12065A174 + (3.1 Reactivity Control Systems, 3.1.5 Shutdown Bank Insertion Levels)
- ML12065A173 + (3.1 Reactivity Control Systems, 3.1.6 Control Bank Insertion Limits, LCO 3.1.6)
- ML18019A103 + (3.1.3.2 Acoustic Monitoring of Bats on the Orr 2015 (Draft))
- TSTF-331 + (3.1.5 Bases Change)
- ML040640752 + (3.1.5 Fire Zones, Appendix R Questions & Answers)
- TSTF-158 + (3.1.5 Safety Rod Insertion Limits, Required Action A.1 Deletion)
- TSTF-344 + (3.1.8 and 3.1.9 SR Frequency Change)
- ML23038A151 + (3.2-1 Administrative Topics Outline)
- ML23038A153 + (3.2-2 Control Room In-Plant Systems Outline)
- TSTF-135 + (3.3 - RPS and ESFAS Instrumentation)
- ML23038A155 + (3.3-1 Scenario Outline)
- TSTF-264 + (3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRS)
- ML102720446 + (3.4 Exhibit 7, Petrographic Report)
- ML102720498 + (3.4 Exhibit 7a, Petrographic Report)
- ML23038A145 + (3.4-1 Events and Evolutions Checklist)
- ML23160A183 + (3.4-1 Events and Evolutions Checklist)
- ML22242A307 + (3.4-1 Scenario Events & Evolutions Checklist RO & SRO)
- ML031110328 + (3.4.2 the NRC Failed to Provide Adequate Reactor Oversight Process Guidance)
- ML031110307 + (3.4.2 the NRC Failed to Provide Adequate Reactor Oversight Process Guidance)
- ML030840372 + (3.4.2 the NRC Failed to Provide Adequate Reactor Oversight Process Guidance)
- TSTF-261 + (3.4.5 and 3.4.6 - Omit LCO Reference to at Least PER Writer'S Guide)
- TSTF-262 + (3.4.6, 3.4.7, and 3.4.8: Allow Dhr/Rhr/Sdc Pumps to Be Aligned for LPI)
- TSTF-155 + (3.5.1 Core Flood TANKS- Deletion of Condition D and Modification of Condition C)
- TSTF-199 + (3.8.4 - Delete Maintenance Surveillances)
- ML18214A573 + (3.Indemnity Agreement Number B-66 Amend 10 20180718)
- ML110450566 + (3/01/2011 Notice of Forthcoming Meeting with Exelon to Discuss NRCs Staffs Review of the Ultimate Head Sink License Amendment Request for the Byron Station, Units 1 and 2)
- ML070460256 + (3/02/07, Notice of Meeting with PSEG Nuclear, LLC, to Discuss Technical Aspects of the Licensees Application for an Extended Power Uprate (EPU) at the Hope Creek)
- ML103510697 + (3/02/11 Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for South Texas Project, Units 1 and 2 License Renewal Application Review)