Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009D121 + (2 to Environ Rept)
- ML21278A277 + (2 to Final Safety Analysis Report, Chapter 14, Safety Analysis, Table of Contents)
- ML21278A290 + (2 to Final Safety Analysis Report, Chapter 14 ,Section 14.17, Loss-of-Coolant Accident)
- ML22194A147 + (2 to Final Safety Analysis Report, Figures 9.5-1, Sheet 1, Drawing D-302-231, Redacted)
- ML22194A396 + (2 to Final Safety Analysis Report, Figure 9.4-26, of Drawing E-922-541, Revision 6, Building Service Substation Relay House Floor El. 436-0)
- ML19281A053 + (2 to Fire Protection Program, Appendix B - Figures)
- ML19114A256 + (2 to Fire Protection Program, Appendix C - Letter References)
- ML19114A254 + (2 to Fire Protection Program, Appendix a - Tables)
- ML19114A252 + (2 to Fire Protection Program, Chapter 1 Through 4)
- ML19114A253 + (2 to Fire Protection Program, Chapter 5 Through 7)
- ML19114A251 + (2 to Fire Protection Program, Table of Contents)
- ML17331A534 + (2 to Fire Protection Review Report (Fprr), List of Effective Sections)
- ML18162A101 + (2 to IP-EP-120, Emergency Classification)
- ML20038A591 + (2 to NRC Requests Re Plant Fill, Vols 1 & 2)
- ML101270312 + (2 to Offsite Dose Calculation Manual)
- ML20009E895 + (2 to Preservice Baseline Insp Program for Facility)
- ML020990131 + (2 to Procedure EI-8, Onsite Radiological Monitoring)
- ML040210792 + (2 to Procedure EIP-ZZ-00211, Field Monitoring)
- ML021280529 + (2 to Procedure No. EI-4.3, Emergency Operations Facility Activation)
- ML20053A235 + (2 to Procedure OI-RC-3-1, RCS Startup)
- ML033630593 + (2 to Procedure RA-EP-02260, Radiological Controls in the Dbab)
- ML20141C542 + (2 to Procedure Work Plan 1903.065, Emergency Response Facility Technical Support Center (Tsc))
- ML20054H081 + (2 to QA Program Manual for Midland Nuclear Plant, Vol I)
- ML18213A233 + (2 to Safety Analysis Report (SAR) for the Brr Package)
- ML063040680 + (2 to Technical Data Book, Change No. EC 38634)
- ML19171A043 + (2 to Technical Requirements Manual)
- ML21125A548 + (2 to Technical Specifications Bases, List of Effective Pages (Unit 1))
- ML19296C368 + (2 to Topical Rept CE-1-A,describing QA Program)
- ML051220226 + (2 to Unit 1 Offsite Dose Calculation Manual (ODCM))
- ML22194A406 + (2 to Updated Final Safety Analysis Report, Figure 10.2-5, System Flow Diagram Generator Gas & Vents)
- ML22194A339 + (2 to Updated Final Safety Analysis Report, Figure 7.5-1, Containment Isolation a and Safety Injection ESF Monitor Lights)
- ML22194A377 + (2 to Updated Final Safety Analysis Report, Figure 9.4-25, Sheet 2, Rev. 4, Industrial Cooling Water)
- ML22115A045 + (2 to Updated Final Safety Analysis Report, Chapter 5, Section 5.6, Other Structures - Redacted)
- ML22194A349 + (2 to Updated Final Safety Analysis Report, Figure 12.1-5, Sheet 1, Redacted)
- ML22194A311 + (2 to Updated Final Safety Analysis Report, Figure 7.6-4, Piping System Auxiliary Steam Auxiliary Building Plan & Section Below El 436-0)
- ML21278A276 + (2 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations, Table of Contents)
- ML22194A169 + (2 to Updated Final Safety Analysis Report, Figure 8.3-4, Electrical One Line and Relay Diagrams Balance of Plant-Vital AC-DC System)
- ML23317A141 + (2 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Onsite Meteorological Data Summaries November 1971 - March 1973)
- ML22194A131 + (2 to Updated Final Safety Analysis Report, Figure 3.7-52, I & C Detail Intermediate Building Earthquake Instr YM-1786)
- ML22194A251 + (2 to Updated Final Safety Analysis Report, Figure 6.3-1, Sheet 3, Piping System Flow Diagram Safety Injection)
- ML21278A256 + (2 to Updated Final Safety Analysis Report, Chapter 12, Section 12.6, Emergency Planning)
- ML20309A754 + (2 to Updated Final Safety Analysis Report, Chapter 10, Appendix 10B, Figures)
- ML22194A157 + (2 to Updated Final Safety Analysis Report, Figure 9.2-5, Drawing D-302-612, Rev. 28, System Flow Diagram Component Cooling System Inside Reactor Building)
- ML21278A241 + (2 to Updated Final Safety Analysis Report, Chapter 10, Section 10.2, Condensate and Feedwater System)
- ML21278A145 + (2 to Updated Final Safety Analysis Report, Chapter 5, Appendix 5E, Section 5E.4, Vertical Tendon Prestress Losses Due to Future Wire Breakage)
- ML21278A173 + (2 to Updated Final Safety Analysis Report, Chapter 6, Section 6.7, Containment Iodine Removal System)
- ML22194A152 + (2 to Updated Final Safety Analysis Report, Figure 9.3-13A, Rev. 7, Nuclear Valve Leak-Off Drains to Recycle Holdup Tank)
- ML21257A255 + (2 to Updated Final Safety Analysis Report, Chapter 1, Section 1.3, Comparison with Other Plants)
- ML22194A155 + (2 to Updated Final Safety Analysis Report, Figure 9.2-2, Sheet 1, Drawing D-302-222-0001, Rev. 10, Service Water Cooling a - Train Outside RB)
- ML21257A302 + (2 to Updated Final Safety Analysis Report, Chapter 3, Reactor, Table of Contents)
- ML22194A180 + (2 to Updated Final Safety Analysis Report, Drawing E-726-232, Rev. 2, Condenser Cir. Water Intake Structure Retaining Walls Bottom Slab Reinforcement Plans Retaining Walls 1 and 2)