PBAPS FPP APPENDIX C LETTER REFERENCES
- 1. S. L. Daltroff (PECO) to D. G. Eisenhut (NRC) dated March 20, 1981.
- 2. V. S. Boyer (PECO) to H. L. Thompson, Jr. (NRC) dated June 6, 1985.
- 3. a. S. L. Daltroff (PECO) to J. F. Stolz (NRC) dated July 2, 1985.
- b. Branch Technical Position CMEB 9.5-1, section C.7.b
- c. J. F. Stolz (NRC) to E. G. Bauer (PECO) dated October 10, 1985.
- d. M. J. Cooney (PECO) to D. R. Muller (NRC) dated May 29, 1986.
- 4. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated December 2, 1983.
- 5. S. L. Daltroff (PECO) to D. G. Eisenhut (NRC) dated January 7, 1985.
- 6. S. L. Daltroff (PECO) to J. F. Stolz (NRC) dated March 24, 1983.
- 7. S. L. Daltroff (PECO) to D. R. Muller (NRC) dated February 25, 1986.
- 8. S. L. Daltroff (PECO) to T. A. Ippolito (NRC) dated February 16, 1979.
- 9. Deleted
- 10. S. J. Kowalski (PECO) to R. M. Bernero (NRC) dated December 10, 1986.
- 11. J. S. Kemper (PECo) to D. G. Eisenhut (NRC) dated September 17, 1984.
- 12. Deleted
- 13. V. S. Boyer (PECO) to H. L. Thompson, Jr. (NRC) dated May 23, 1985.
- 14. Deleted FPP C-1 Rev. 17, April 2009
PBAPS FPP APPENDIX C LETTER REFERENCES (Contd)
- 15. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated July 11, 1983.
- 16. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated July 22, 1983.
- 17. NRC Safety Evaluation Report dated November 14, 1986.
- 18. NRC Safety Evaluation Report dated December 31, 1986.
- 19. NRC Safety Evaluation Report dated March 13, 1985.
- 20. NRC Safety Evaluation Report dated October 3, 1991.
- 21. NRC Safety Evaluation Report dated May 23, 1979.
- 22. G. A. Hunger, Jr. (PECO) to NRC dated May 29, 1996.
- 23. Minor Physical Change, Engineering Change Request 97-01532.
- 24. NRC approval of ITS dated August 30, 1995.
- 25. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated September 16, 1983.
- 26. J. J. Hagan (PECO) to NRC dated October 12, 1999.
- 27. J. P. Boska (NRC) to J. A. Hutton (PECO), Peach Bottom Atomic Power Station, Unit 2 and 3, RE: Exemption from 10CFR Part 50, Appendix R, Section III.F, Fire Detection Requirements, dated August 18, 2000.
- 28. J. P. Boska (NRC) to O. D. Kingsley (Exelon), Peach Bottom Atomic Power Station, Units 2 and 3, RE: Exemption from the Requirements of 10 CFR 50, Appendix R, Section III.F, Automatic Fire Detection, dated December 7, 2001.
- 29. Letter from George F. Wunder (NRC) to Christopher M. Crane (Exelon Nuclear), dated June 24, 2005, RE. Peach Bottom Atomic Power Station, Units 2 and 3, Issuance of License Amendments and Safety Evaluation for Fire Protection Program Changes - converting the existing automatic carbon dioxide fire suppression systems installed in each of the four FPP C-2 Rev. 17, April 2009
PBAPS FPP emergency diesel generator rooms and cable spreading room to manual actuation. (TAC Nos. MC0987 and MC0988)
FPP C-3 Rev. 17, April 2009