ML19114A256

From kanterella
Jump to navigation Jump to search
Revision 22 to Fire Protection Program, Appendix C - Letter References
ML19114A256
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/08/2019
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19114A265 List: ... further results
References
Download: ML19114A256 (3)


Text

PBAPS FPP APPENDIX C LETTER REFERENCES

1. S. L. Daltroff (PECO) to D. G. Eisenhut (NRC) dated March 20, 1981.
2. V. S. Boyer (PECO) to H. L. Thompson, Jr. (NRC) dated June 6, 1985.
3. a. S. L. Daltroff (PECO) to J. F. Stolz (NRC) dated July 2, 1985.
b. Branch Technical Position CMEB 9.5-1, section C.7.b
c. J. F. Stolz (NRC) to E. G. Bauer (PECO) dated October 10, 1985.
d. M. J. Cooney (PECO) to D. R. Muller (NRC) dated May 29, 1986.
e. Document Change Request (DCR)/Engineering Change Request (ECR) PB-97-02186.
4. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated December 2, 1983.
5. S. L. Daltroff (PECO) to D. G. Eisenhut (NRC) dated January 7, 1985.
6. S. L. Daltroff (PECO) to J. F. Stolz (NRC) dated March 24, 1983.
7. S. L. Daltroff (PECO) to D. R. Muller (NRC) dated February 25, 1986.
8. S. L. Daltroff (PECO) to T. A. Ippolito (NRC) dated February 16, 1979.
9. Deleted
10. S. J. Kowalski (PECO) to R. M. Bernero (NRC) dated December 10, 1986.
11. J. S. Kemper (PECo) to D. G. Eisenhut (NRC) dated September 17, 1984.
12. Deleted
13. V. S. Boyer (PECO) to H. L. Thompson, Jr. (NRC) dated May 23, 1985.
14. Deleted FPP C-1 Rev. 17, April 2009

PBAPS FPP APPENDIX C LETTER REFERENCES (Contd)

15. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated July 11, 1983.
16. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated July 22, 1983.
17. NRC Safety Evaluation Report dated November 14, 1986.
18. NRC Safety Evaluation Report dated December 31, 1986.
19. NRC Safety Evaluation Report dated March 13, 1985.
20. NRC Safety Evaluation Report dated October 3, 1991.
21. NRC Safety Evaluation Report dated May 23, 1979.
22. G. A. Hunger, Jr. (PECO) to NRC dated May 29, 1996.
23. Minor Physical Change, Engineering Change Request 97-01532.
24. NRC approval of ITS dated August 30, 1995.
25. V. S. Boyer (PECO) to D. G. Eisenhut (NRC) dated September 16, 1983.
26. J. J. Hagan (PECO) to NRC dated October 12, 1999.
27. J. P. Boska (NRC) to J. A. Hutton (PECO), Peach Bottom Atomic Power Station, Unit 2 and 3, RE: Exemption from 10CFR Part 50, Appendix R, Section III.F, Fire Detection Requirements, dated August 18, 2000.
28. J. P. Boska (NRC) to O. D. Kingsley (Exelon), Peach Bottom Atomic Power Station, Units 2 and 3, RE: Exemption from the Requirements of 10 CFR 50, Appendix R, Section III.F, Automatic Fire Detection, dated December 7, 2001.
29. Letter from George F. Wunder (NRC) to Christopher M. Crane (Exelon Nuclear), dated June 24, 2005, RE. Peach Bottom Atomic Power Station, Units 2 and 3, Issuance of License Amendments and Safety Evaluation for Fire Protection Program Changes - converting the existing automatic carbon dioxide fire suppression systems installed in each of the four FPP C-2 Rev. 17, April 2009

PBAPS FPP emergency diesel generator rooms and cable spreading room to manual actuation. (TAC Nos. MC0987 and MC0988)

FPP C-3 Rev. 17, April 2009