Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17325B517 + (1999 Financial Assurance Requirements Rept for Decommissioning Nuclear Power Reactors)
- ML20202F790 + (1999 Four Year Simulator Certification Rept for MNGP Simulation Facility)
- ML20216E071 + (1999 Graded Exercise - Comanche Peak Steam Electric Station)
- ML17265A766 + (1999 Rept of Facility Changes,Tests & Experiments Conducted Without Prior NRC Approval for Jan 1998 Through June 1999, Per 10CFR50.59.With)
- ML20209J348 + (1999 Second Quarter Rept of Completed Changes,Tests & Experiments, Per 10CFR50.59.With)
- ML20249C849 + (1999 Third Quarter Rept of Completed Changes,Tests & Experiments Evaluated,Per 10CFR50.59(b)(2), for Dresden Nuclear Power Station. with)
- ML20263M946 + (19FA Electronic Control Diag for Nuclear Plant Duty Auxiliary Power Panel 1. Sheet 3 of 4.Rev Date Illegible)
- ML20263M944 + (19FA Electronic Control Diagram for Nuclear Plant Duty Control Panel 1. Sheet 4 of 4.Rev Date Illegible)
- ML22143A837 + (19_xLPR Project Updates-NRC Tech Exchange 2022)
- ML14071A147 + (1: Email - Columbia Generating Station NPDES Permit Renewal)
- ML020810326 + (1:30 P.M. (Edt) Palisades Notice of Significant Licensee Meeting -)
- ML052070160 + (1:30PM - Attachment to Transcript for Scoping Meeting, Monticello Nuclear Generating Plant)
- ML20206C946 + (1:Final Cycle 16 Freespan ODSCC Operational Assessment)
- ML19308C236 + (1:New Age for Nuclear Power. Selected Pages Describing Core Melt Incident on 661005)
- 05000263/LER-1977-024-01, 1:on 771013,A Inboard MSIV,AO-2-80A Found Leaking Inexcess of Tech Spec Acceptance Criteria.Seats Lapped & Valve Retested Satisfactorily + (1:on 771013,A Inboard MSIV,AO-2-80A Found Leaking Inexcess of Tech Spec Acceptance Criteria.Seats Lapped & Valve Retested Satisfactorily)
- ML20233A809 + (1A (1) Oconee 2020301 as Given RO Written Exam and Key)
- ML20233A815 + (1A (2) Oconee 2020301 as Given SRO Written Exam and Key.Pdf)
- ML21098A125 + (1A - Opening)
- ML21034A519 + (1A -PSL L-20-1 RO and SRO Student Exam Final as Given with Key)
- 05000327/FIN-2013002-01 + (1A EDG Breaker Failures)
- 05000321/FIN-2010003-04 + (1A EDG fuel oil return line failure)
- 05000289/FIN-2018003-01 + (1A Emergency Diesel Generator Lube Oil Leak Inadequate Corrective Actions)
- ML21286A363 + (1A Final RO Exam, Answer Key, References)
- ML21286A525 + (1A Final SRO Exam, Answer Key, References)
- 05000321/FIN-2015003-02 + (1A PSW Pump High Vibration Failure)
- ML23079A095 + (1A- RO Exam as Administered)
- ML23079A092 + (1A- SRO Exam as Administered)
- ML22061A138 + (1A-1_of_4-Furstenau_Intro-FINAL-SLIDES)
- ML22061A137 + (1A-2_of_4-Aird-NRC_PFHA_Research_Update-SLIDES)
- 05000219/FIN-2010008-03 + (1A2 and 1B2 480 V Load Center Transformer Cooling Fan Testing)
- ML21015A289 + (1B - Life Beyond 80_EPRI Overview - Wong Final R1)
- ML21098A126 + (1B - Overview)
- ML24136A224 + (1B EDG NRC Regulatory Conference Meeting Summary May 2, 2024)
- ML21034A531 + (1B Psl 2020-301 NRC Exam Post Exam Comments and References_Redacted (PII Redacted))
- ML23079A090 + (1B- Post Exam Comments)
- ML24145A085 + (1B-B Diesel Generator Failure - Final Significance Determination Letter)
- 05000369/FIN-2014004-01 + (1B/1C Reactor Coolant System Loop Safety Injection Piping Flaws)
- ML16313A117 + (1BTl1V001-RPT-01, Donald C. Cook Focused Scope Peer Review - Pre-Initiator Human Reliability Analysis)
- ML21019A017 + (1C - Beyond Nuclear - Presentation-1 - 100yrs - Final)
- ML21098A127 + (1C - PRA Methodology)
- 05000334/LER-1980-074-03, 1C Charging Pump Discharge Check Valve Did Not Reset.Caused by Binding of Antirotation Devices on Valve Disc & Disc Arm,Due to Flow or Pressure Surges on Sys Causing Disc to Rotate + (1C Charging Pump Discharge Check Valve Did Not Reset.Caused by Binding of Antirotation Devices on Valve Disc & Disc Arm,Due to Flow or Pressure Surges on Sys Causing Disc to Rotate)
- ML22061A130 + (1C-1_of_3-Novak-BigStories-SLIDES)
- ML22061A129 + (1C-2_of_3-Cohen-slides)
- ML22061A128 + (1C-3_of_3-Smith-BillionDollar-SLIDES)
- ML21019A355 + (1D - Materials Research for Extended Operation)
- ML21098A128 + (1D - Modeling Overview)
- ML16130A187 + (1D-626-11-001, Sheet Na, Rev 001, Turbine Generator Control)
- ML21098A129 + (1E - Sierra Modeling)
- ML16130A246 + (1E-200-21-1000, Sheet Na, Rev 001, Reactor Plant Systems Flo)
- ML16130A247 + (1E-710-11-001, Sheet Na, Rev 009, Elec Schematic One Line Di)
- ML16130A248 + (1E-710-11-002, Sheet 1, Rev 001, Electrical Schematic One LI)