Modeling Overview Gabriel Taylor, P.E.
Office of Nuclear Regulatory Research
HEAF Research Working Group Update - April 6th, 2021 Overview of ZOI development 2
Scenario Current Duration Equipment Config.
Material Modeling Incident Energy Heat Flux Fragility Target Vulnerability Threshold ZOI Tables
+
=
Zone of Influence (ZOI)
HEAF Research Working Group Update - April 6th, 2021 Flashback : April 2018 3
Merging with incorporation of CFD modeling insights
HEAF Research Working Group Update - April 6th, 2021 Modeling Approaches
- SNL SIERRA Suite
- Multi-physics coupled model
- Focus on modeling arc (source term)
- CFD modeling
- Focus on modeling thermal transport to target
- Empirical
- Data fit
- Focus on specific phenomena; enclosure breach, arc voltage 4
HEAF Research Working Group Update - April 6th, 2021 Modeling Scenarios 5
- Medium Voltage, Non-segregated phase bus duct
Enclosure:
Steel or Aluminum
- Conductors: Aluminum or Copper
- Medium Voltage Switchgear
- Configuration: Supply, Main, Load
- Energy Profile: Stiff, Decay, or Stiff + Decay
- Conductors: Aluminum or Copper
- Low Voltage Switchgear
- Conductors: Aluminum or Copper
HEAF Research Working Group Update - April 6th, 2021 Scenario Consolidation
- Low energy scenarios are being removed from initial list using empirical correlations and slightly conservative fragility thresholds
- Reduces scenario list by 88%
- Some scenarios have similar or identical hazard and can be consolidated even further 6
HEAF Research Working Group Update - April 6th, 2021 Summary
- Overall approach to decouple modeling and fragility efforts remains intact
- Modeling approach has evolved into a hybrid between category and dynamic
- PRA guidance document supports defining model scenarios
- Modeling appears to provide reasonable estimates to inform the working groups ZOI determination. However, areas for uncertainty reduction exist.