Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17312A200 +
- ML17312A106 +
- ML17312A098 +
- Press Release-95-136, NRC Considers Request to Release CLEANED-UP Area at Jefferson Proving Ground for Unrestricted Use +
- ML18038B529 +
- ML061730201 +
- ML20100H631 +
- ML20094L241 +
- ML20094K746 +
- ML20094K692 +
- ML20094K403 +
- ML20094K116 +
- ML20094H491 +
- ML20094H481 +
- ML20094H421 +
- ML20094H387 +
- ML20094H189 +
- ML20094H000 +
- ML20094G876 +
- ML20094G867 +
- ML20094G730 +
- ML20135F955 +
- ML20149L035 +
- ML20217D532 +
- HL-5050, Forwards Rev 14A to Ei Hatch Nuclear Plant Units 1 & 2 FSAR Update & Rev 11A to Ei Hatch Nuclear Plants Units 1 & 2 Fire Hazards Analysis & Fire Protection Program +
- B15424, Clarifies 950609 Proposed Rev to TS Re Secondary Containment Per 951004 Telcon W/Nrc.Revised TS Pages Encl +
- B15438, Documents Responses NNECO Provided in 951101 Telcon Re Rev to TS Re Pressurizer & Main Steam Safety Valves +
- RBG-42159, Forwards Response to 950925 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, Including Response to GL 92-08 Reporting Requirement 2(c) from & Calculations Which Will Be Used to Detemine Ampacity Derating Parameters +
- BSEP-95-0445, Informs NRC of Rev in Schedule for Completion of Bsep,Unit 2 Core Spray Sys Sparger Repair Bracket Seal Weld Application & Deletion of Plans to Perform Liquid Penetrant Exam of Repair Bracket Welds,Per NRC Bulletin 80-13 +
- 3F1195-13, Submits Ltr to Clarify Sources of Emergency FW That Will Be Available to Plant in Natural Circulation Cooldown & to Close NRC Unresolved Item 50-302/95-14-04 +
- 3F1195-14, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-16.Corrective Actions:Placed DC Cooling to MUP-1A Under Administrative Control +
- 05000373/LER-1995-017-03, :on 951010,determined That PCIS Contacts for RB Ventilation & FPC Exhaust Ventilation High RM Trip Sys Not Being Tested Per TS 4.3.2.2 Due to Procedural Deficiencies. Changes Will Be Made to Sps for Logic Testing +
- 05000327/LER-1995-013, :on 951010,surveillance Was Missed During Mode 6.Caused by Inadequate Training of Licensed Operators in Use of 12-wk Schedule.Revised Procedures to Include Comprehensive List of Routine SIs +
- 05000289/LER-1995-005-01, :on 951012,invalid Heat Sink Protection Sys Actuation Occurred.Caused by Failure of Logic Modules.Logic Module Failure Analysis Will Continue in Order to Substantiate Suspected Failure Mode +
- 05000456/LER-1995-013-04, :on 951012,fire Protection App R Design Discrepancies Occurred Due to Inadequate Evaluations During Preparation of Original Analysis.Maintained Hourly Fire Watches for All Fire Zones +
- 05000219/LER-1995-006, :on 951011,inoperable Emergency Lighting Units Resulted in Operation Not in Compliance W/Ts.Caused by Lack of Procedural Direction.Wrote Preventative Maint Task to Direct Immediate Repairs +
- 05000219/LER-1995-007, :on 951010,TS Required Surveillance Was Missed Due to Administrative Error.Nuclear Safety Assessment Group Performed Audit of Past Surveillance Activities +
- ML20094L124 +
- ML20094K951 +
- ML20094P415 +
- ML20094J552 +
- HL-5064, Forwards Rev to Security Plan for Ei Hatch Nuclear Plant. Plan Withheld +
- 05000280/LER-1995-011, :on 951018,both Source Range Nuclear Instruments de-energized Due to Personnel Error.Initiated Abnormal Procedure-40 +
- IR 05000255/1995010 +
- ML18038B543 +
- HNP-95-098, Provides Info Per 10CFR50.46(a)(3(ii) for HNP Re Change in ECCS Evaluation Model +
- 05000250/LER-1995-007-01, :on 951017,manual RT Occurred Following Drop of Four Control Rods.Caused by Water Intrusion Into Rod Control Power Cabinet 2BD.Inspected Control Power Cabinet 2BD for Other Water Damage +
- IR 05000237/1992013 +
- ML17264A221 +
- ML17264A232 +