i N:rthe=t Rope Ferry Rd. (Route 156), Waterford, CT 06385 i Nuclear Entrgy Millstone Nucleir Power Station l

/ Northeast Nuclear Energy Company  !

' P.O. Box 128 i

. Waterford, Cr 06385-0128 l (203)447 -1791 Fax (203) 444-4277 The Northeast Utilities System RE: Technical Specification 3.3.3.7.b November 9, 1995 j MP-95-332 l U. S. Nuclear Regulatory Commission Document Control Desk i Washington, DC 20555 l

References:

Facility Operatin Ucense No. DPR-65 Docket No. 50-This letter forwards the Special report required pursuant to Millstone Unit 2 Technical Specification 3.3.3.7.b, " Fire Detection Instrumentation." This report identifies that the fire alarm system for the intake structure has been out of service for g reater than 14 days  !

due to troubleshooting maintenance required to locate and repair intermittent alarms, j The event is being reported in accordance with Technical Specification 6.9.2.f and Technical Specification 3.3.3.7.b. There were no safety" consequences resulting from )

this event because the plant complied with the Action a" of Technical Specification 3.3.3.7. Technical Specification 3.3.3.7 requires establishing a fire watch patrol within one hour to inspect affected areas once per hour.

The cause of the intermittent alarms was isolated to a particular faulty detector. This detector has been replaced and associated work has been completed. The fire 4 detection system for the intake structure was returned to service on October 13,1995.

We trust you find this information satisfactory.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY FOR: Donald B. Miller, Jr.

Senior Vice President - Millstone Station

/

/ (A BY/ ah . uchard Director - Millstone Unit 2 DBM:ljs p cc: T. T. Martin Region 1 Administrator R D. Swetland, Senior Resident inspector. Millstone Unit Nos.1,2, and 3 G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 f(t 951117oo86 DR 951109 ADOCK 05ooo336 PDR