Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1996-47, Recordkeeping, Decommissioning Notifications for Disposals of Radioactive Waste by Land Burial Authorized Under Former 10 CFR 20.304, 20.302, and Current 20.2002 +
- ML17264A585 +
- ML18102A336 +
- ML18102A334 +
- ML18102A320 +
- ML18102A319 +
- ML20117J058 +
- ML20117J014 +
- ML20117E675 +
- ML20117D077 +
- ML20117C820 +
- ML20117C736 +
- ML20117C660 +
- ML20117C215 +
- ML20117C047 +
- ML20117B819 +
- ML20117B512 +
- ML20117B269 +
- ML20116M767 +
- ML20137Y498 +
- ML20137Q928 +
- ML20135A800 +
- ML20148C398 +
- ML20140E573 +
- ML20138E418 +
- ML20134G742 +
- ML20134G210 +
- ML20129F461 +
- ML20128P924 +
- ML20128P918 +
- ML20128P327 +
- ML20128J192 +
- ML20211K167 +
- TAC:M80655 +
- TAC:M95255 +
- 2CAN089608, Forwards TS Re Changes to ANO Unit 2 TS 3/4.6.1.3 Concerning Containment Air Locks +
- BSEP-96-0309, Responds to NRC Re Violations Noted in Insp Rept 50-324/96-08 & 50-325/96-08.Corrective Actions:Revised Maint Procedures & Established Plant to Complete Implementation of Maint Procedure AP-005 Reformat Project +
- 1CAN089601, Forwards Errors or Changes in Emergency Core Cooling Sys Evaluation +
- LIC-96-0108, Forwards Addl Info on C-E Cecor Fixed In-Core Detector Analysis Sys +
- HL-5229, Forwards FFD Performance Data for six-month Reporting Period Jan-June 1996 Per 10CFR26.71(d) +
- E000-96-001, Requests Extension to 970331 to Submit Evaluation Re Radiological Consequence Analysis for Control Room Operators +
- 05000327/LER-1996-009-01, :on 960718,auxiliary Building Secondary Containment Boundary/Fire Barrier Not Maintained as Required by Design.Caused by Failure to Follow Design Control Process +
- 05000354/LER-1996-020, :on 960719,south Plant Vent Radioactive Gaseous Effluent Monitor Declared Inoperable.Caused by Failure to Perform Actions for Inoperable Instrumentation.Frequency of Grab Samples Flow Estimations Increased +
- 05000423/LER-1996-013, :on 960612,design Deficiency in Rhrs.Caused by Inconsideration That Failure Mode of RHS Flow Control Valves Could Create High RHS Heat Exchanger CCP Discharge Temps. Actuators for Heat Exchanger Valves,Modified +
- ML20116N499 +
- ML20117E554 +
- ML20117E547 +
- ML20138F762 +
- ML20117B464 +
- ML20116N507 +