Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203L269 +
- ML20203K499 +
- ML20203F675 +
- ML20203F660 +
- ML20203F228 +
- ML20203C073 +
- ML20203B309 +
- ML20203B278 +
- ML20203B066 +
- ML20202J508 +
- ML20202J426 +
- ML20202H977 +
- ML20202H961 +
- ML20202H028 +
- ML20202E269 +
- ML20236J133 +
- ML20216D049 +
- BSEP-98-0040, Forwards Requested Exam Outline Matls to Support Initial License Exam at Plant.W/O Encl +
- NOC-AE-0074, Application for Amend to License NPF-80,incorporating Attached Amend to TS 3.4.5.Amend Will Implement 1-volt voltage-based Repair Criteria for SG Tube Support plate-to- Tube Intersections +
- ML20217C958 +
- 05000423/LER-1998-006, Forwards LER 98-006-00,documenting Condition Determined Reportable at Unit 3 on 980115.Util Commitments in Response to Event Contained within Attachment 1 to Ltr +
- ML20236N316 +
- ML20236N276 +
- ML20203L930 +
- ML20203M689 +
- ML20203B354 +
- ML20203F018 +
- ML20196D061 +
- 05000272/LER-1998-001, :on 980116,AFP Internal Flooding Protection Was Installed Incorrectly.Caused by Installation Error During Construction.Pipe Alley Flood Gate counter-weight Was Properly Positioned on 980124 +
- HNP-98-017, Responds to RAI on Shearon Harris IPEEE Submittal,Dtd 971215.Rev 0 to C-007, CP&L Harris IPEEE: HCLPF Capacity Calculations for 1X-SAB CST Tank & 1X-SN RWST Tank, Encl +
- 05000499/LER-1998-001, :on 980115,failure to Meet TS Requirements for Inoperable Sdg 21 Noted.Caused by Failure of U3 Operational Amplifier in DG Voltage Regulator Circuit.Replaced Voltage Regulator Board for Sdg 21 & Complete Post Maint Test +
- B17050, Provides Info Re RAI of 980203 Re Recirculation Spray Sys. Encl 1 Provides Responses to Questions 1 Through 5 & Encl 2 Provides Responses to Question 6 +