Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18101A735 +
- ML18153A816 +
- ML18153A815 +
- ML20084T126 +
- ML20083R747 +
- ML20083R337 +
- ML20083P884 +
- ML20083P875 +
- ML20083P356 +
- ML20083P354 +
- ML20083P305 +
- ML20083M986 +
- ML20083M973 +
- ML20083M783 +
- ML20083C929 +
- ML20083C915 +
- ML20083C905 +
- ML20083C898 +
- ML20083C880 +
- ML20083C877 +
- ML20083C874 +
- ML20091G308 +
- HL-4827, Forwards Rev 13C to FSAR & Rev 10C to Fire Hazards Analysis & Fire Protection Program +
- RC-95-0136, Forwards Amend 95-01 to Fire Protection Evaluation Rept +
- NRC-95-4463, Forwards Proprietary & Nonproprietary Versions of AP600 Testing Program Rept PCS-T2R-050, Large-Scale Test Data Evaluation. Proprietary Version of Rept Withheld from Public Disclosure Per 10CFR2.790.Also See 9809300271 +
- 3F0595-14, Forwards Background Section,Brief Conclusion & Two Attachments Containing Summary of follow-up Questions & Util Responses to Study Performed by Gilbert Commonwealth Re Plant Fifth Tendon Surveillance +
- SNRC-2192, Forwards Both Copies,Signed by Util President Cv Giacomazzo, of Amend 7 to Indemnity Agreement B-87.Util Returning Copies Because Effective Date Left Blank +
- HL-4843, Advises That Info Submitted to NRC on 940824 & 940923,in Response to GL 94-03 & NRC Rai,Respectively,Does Not Need to Be Withheld from Public Disclosure +
- 1CAN059505, Application for Amend to License DPR-51.Amend Would Revise SR for Verifying Adequate SW Flow to Each Train of RB Emergency Cooling +
- NRC-95-0048, Requests That Proposed TS Change Submitted by Re Calibr Interval Extension Be Designated as Cost Beneficial Licensing Action +
- 1CAN059506, Documents Util Position Discussed on 950512 W/Nrc & Requests Enforcement Discretion from Specific Test Flow Requirement of TS 4.5.2.1.2(a)(1) to Allow Determining Proper Sys Operation by Engineering Evaluation in Bases of TS 3.3 +
- NRC-95-4462, Forwards Proprietary EPRI Rept RA-93-10, GOTHIC Design Review,Final Rept +
- ML20266H627 +
- ML20265D972 +
- ML20265C841 +
- ML20265D436 +
- ML20265C969 +
- ML20265E260 +
- 05000298/LER-1995-010, :on 950413,unanalyzed Condition Discovered During Closeout of RHR Min Flow Valve Design Change (DC) 94-332.Caused by Improper Review of Previous DC 76-2.Util Implemented DC 94-332 +
- 05000317/LER-1995-001-01, :on 950415,Unit 1 Entered TS 3.0.3 When EDG Supplying Backup Power Became Inoperable.Caused by Leaking Fuel Injector Pump Due to Improper Drainage.Drain Lines Cleaned +
- 05000318/LER-1995-004, :on 950414,fire Occurred in Section of Expansion Joint Matl in K Line Wall,Burning Approx Three Linear Feet of Cork Matl.Caused by Sparks from Welding Near Wall.Fire Watches Posted & Walkdown Performed +
- 05000373/LER-1995-010-01, :on 950415,auto Start of Standby Gas Treatment, Units 1 & 2 Division 2 Reactor Bldg Ventilation Isolation & Other Isolation Signals Received Due to Wrong Fuse Being Pulled Due to Personnel Error.Replaced Fuse +
- 05000374/LER-1995-008-02, :on 950415,reactor Scrammed from High Scram Discharge Vol Water Due to Mgt Deficiency.Operating Personnel Responded to Alarm/Annunciator Conditions & Performed Required Immediate Action +
- 05000423/LER-1995-007-02, :on 950416,partial CDA Signal Generated When Limit Switch Contacts Grounded While Performing Mods.Caused by Personnel Error & Programmatic Weaknesses.Reviews W/ Affected Dept Personnel Performed +
- ML20083M595 +
- ML20083M757 +
- ML20083M568 +
- ML20083M625 +
- ML20083M753 +
- ML20129J113 +