9 GENuclearEnergy
$$$*E$9I?tais5l["
May 15,1995 MFN 076-95 Docket STN 52-004 Document Contror Desk U. S. Nuclear Regulatory Commission Washington DC 20555 Attention: Theodore E. Quay, Director Standardization Project Directorate
Subject:
SBWR, NRC Request for Additional Information RAI 950.23, and PANTHERS-IC Test Facility Documents
Reference:
- 1) MFN 167-93, NRC Requestsfor AdditionalInformation (RAls) on the SBWR Design, Ixtter from J. F. Quirk to J. N Wilson, dated October 19,1993.
- 2) MFN 086-94, NRC Requestsfor AdditionalInformation (RAls) on the SBWR Design, Letter from P. W. Marriott to R. W. Borchardt, dated June 30,1994.
- 3) MFN 098-94, NRCRequestsfor AdditionalInformation (RAls) on the SBWR Design, Letter from P. W. Marriott to R. W. Borchardt, dated August 16,1994.
- 4) MFN 015-95, NRC Requestsfor AdditionalInformation (RAls) on the SBWR Design, RAI 950.23, Ixtter from J. E. Quinn to R. W. Borchardt, dated February 17,1995.
- 5) MFN 029-95, NRC Requestsfor AdditionalInformation (RAls) on the SBWR Design, RAI 950.23 Letter from J. E. Quinn to R. W. Borchardt, dated February 17, 1995.
- 6) MFN 041-95, NRC Requestsfor AdditionalInformation (RAls) on the SBWR Design, RAI 950.23, Letter from J. E. Quinn to R. W. Borchardt, dated March 14, 1995.
- 7) MFN 056-95, Letter from J. E. Quinn to R. W. Borchardt (NRC), NRC Requestfor AdditionalInformation (RAI) on the Simphfied Boiling Water Reactor (SBWR) Design, RAI 950.23, and PANTIIERS IC & PCC Test Facility Drawings, dated April 14,1995.
- 8) MFN 046-95, Letter from J. E. Quinn to R. W. Borchardt (NRC), SBWR Test and Analysis Program Description, NEDC-32391P, Revision B, dated April 13,1995.
- 9) MFN 072-95, Letter from J. E. Quinn to T. E. Quay (NRC), SBWR Test Documentation Submittals, dated May 10,1995.
This letter provides additional information to supplement the References 1-7 responses to Requests for Additional Information regarding the SBWR PANTHERS Test Facility.
Specifically. The enclosure to this letter which provides supplemental information regarding the response to RAI 950.23.
9505230101 950515 PDR ADOCK 05200004 h
A PDR v
O GENuclearEnergy M FN 076-95 Page 2 Reference 8 included a list of Action Items to achieve closure of items from NRC and ACRS meetings related to the GE SBWR Test and Analysis Program (TAPD). The Subjec; report c
enclosure to this letter is submitted in partial satisfaction of Item 35 of that list.
Reference 9 lists SBWR Test Submittals and relates them to the Item No from the list in Reference 8.
The Subject report enclosure to this letter completes Item No. 53 ~of the -
Attachment to MFN 072-95.
Sincerely,
- ..W y t$mesEF mn, Projects Manager a
fR and SBWR Programs
Enclosure:
SIET Document Document No.
Ecr.
Title 00395PP95 0
PANTHERS-IC TEST PROCEDURES l
cc:
P. A. Boehnert (NRC/ACRS) (2 paper copies w/att. plus E-Mail w/o att.)
I. Catton (ACRS)
(1 paper copy w/att. plus E-Mail w/o att.)
S. Q. Ninh (NRC)
(2 paper copies w/att. plus E-Mail w/o att.)
J. H. Wilson (NRC)
(1 paper copy w/att. plus E-Mail w/o att.)
GENuclearEnergy Attachment to MFN 076-95 RAI Number: 950.23 Request:
i Provide the test plan for final hardware configuration for the PANTHERS facility.
GE Response:
This response supplements the earlier responses to this RAI;
)
i a)
MFN 167-93, October 19,1993, b)
MFN 086-94, June 30,1994, c)
MFN 098-94, August 16,1994, d)
MFN 003-95, January 18,1995, e)
MFN 015-95, February 17, 1995, f)
MFN 029-95, February 17,1995, g)
MFN 041-95, March 14,1995, h)
MFN 056-95, April 14,1995.
With respect to test plan, attached are the SIET PANTHERS-IC Test Procedures. The P&ID for this program was sent in (h) above. Other test documents will follow as they become available.
Document No.
Rey.
Title 00395PP95 0
PANTHERS-IC TEST PROCEDURES i
i e
GENuclentEnergy t
MFN 076-95 bec: (E-Mail w/o att. except as noted) l l
N. E. Barclay l
J. A. Beard l
P. F. Billig R. H. Buchholz T. Cook (doe)
(2 paper copies w/att, plus E-Mail w/o att.)
l J. D. Duncan l
R. T. Fernandez (EPRI) l J. R. Fitch J. E. Leatherman J. E. Quinn l
T. R. McIntyre T. J. Mulford (EPRI)
(1 paper copy w/att. plus E-Mail w/o att.)
P. E. Novak F. A. Ross (doe)
K. T. Schaefer l
R. Srinivasan (EPRI)
(2 paper copies w/att. plus E-Mail w/o att.)
i J. E. Torbeck i
GE Master File M/C 747 (1 paper copy w/att. plus E-Mail w/o att.)
l SBWR Project File (1 paper copy w/att. plus E-Mail w/o att.)