Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17212B291 +
- ML18017B491 +
- ML17341A586 +
- ML17341A584 +
- ML17297B711 +
- ML18046A960 +
- ML20050C737 +
- ML20261E751 +
- ML20260B704 +
- ML20260B695 +
- ML20260B781 +
- ML20260B718 +
- ML20260B103 +
- ML20260B097 +
- ML20260B089 +
- ML20259G019 +
- ML20259G006 +
- ML20259F556 +
- ML20259F160 +
- ML20259F155 +
- ML20259A673 +
- ML20260B108 +
- ML20259G009 +
- ML20260B093 +
- ML20259G002 +
- ML20259G014 +
- ML20261B000 +
- ML20260B665 +
- ML20138C405 +
- 05000364/LER-1981-039, Forwards LER 81-039/03L-0 +
- 05000364/LER-1981-039-03, /03L-0:on 810915,while Performing FNP-2-STP-20.0A, a Train Penetration Room Filtration Sys Declared Inoperable When Pressure Differential Transmitter Failed to Open for Damper.Caused by Transmitter Drift.Unit Recalibr +
- ML20038B320 +
- ML20032F003 +
- AECM-81-373, Submits Final Response to IE Bulletin 79-24, Frozen Lines. UHS Water Level Has Been Raised to Ensure 30-day Supply of Water.Standby Svc Water Sensing Lines Now Designed to Be Under 6 Inches of Water.No Freeze Protection Required +
- 05000298/LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Also Submitted +
- 05000298/LER-1981-022-03, /03L-0:on 810912,blown Fuse in Valve Motor Circuit Disabled Valve & Reactor Core Isolation Cooling Sys.Caused by Motor Grounded by Grease That Penetrated Defective Seal in Valve Operator & Into Armature.Motor & Seal Replaced +
- ML20032C338 +
- 05000312/LER-1981-047-01, /01E-0:on 810930,bus a Emergency Pressurizer Heater Bank 3 Operated Intermittently Due to Loose Wire. Caused by Misoriented Screw Washer.Washer re-oriented & Screw Tightened +
- 05000312/LER-1981-047, Forwards LER 81-047/01T-0.Detailed Event Analysis Submitted +
- 05000312/LER-1981-048, Forwards LER 81-048/04T-0 +
- 05000325/LER-1981-067, Forwards LER 81-067/03L-0 +
- 05000312/LER-1981-048-04, /04T-0:on 811003,monthly Record Review Revealed Violation on 4 Days of Ph Limit in Sept.Three Violations Caused by Instrument Calibr.Corrective Action in Followup Rept +
- ML20032A966 +
- 05000280/LER-1981-052-03, /03L-0:on 810920,during Routine Shutdown to Repair Feedwater Leaks Inside Containment Steam Flow Indicator for Steam Generator C,FI-1494,would Not Indicate Properly.Caused by Moisture in Transmitter.Leaks Repaired +
- ML20031G840 +
- 05000280/LER-1981-048-03, /03L-0:on 810912,while Unit Was Being Returned to Svc Following Rod Control Problem,C Steam Flow Transmitter Ft-1495 Indicated Low.Caused by Water Collecting & Shorting Out Transmitter.Transmitter Replaced +
- 05000282/LER-1981-018, Forwards LER 81-018/01T-0 +
- 05000282/LER-1981-018-01, /01T-0:on 810928,during Eddy Current Testing of Steam Generators at Refueling,Tube Degeneration Observed. Caused by Corrosion &/Or Fretting.Defective Tubes Plugged +
- 05000282/LER-1981-013, Forwards LER 81-013/03L-0 +
- 05000266/LER-1981-013, Forwards LER 81-013/03L-0 +