Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-83-183, Forwards Schedule Outlining Portions of Initial Test Program That May Be Incomplete by Core Load + (20:30:03, 8 January 2025)
- L-83-185, Forwards Rev 2 to Offsite Dose Calculation Manual + (20:30:06, 8 January 2025)
- ML17213B196 + (20:30:06, 8 January 2025)
- ML17213B193 + (20:30:09, 8 January 2025)
- L-83-181, Forwards P 25,corrective Action Plans,To Suppl a to Engineering Verification Program, Inadvertently Omitted from Util + (20:30:10, 8 January 2025)
- L-83-184, Forwards marked-up Table 3-1 of Radiological Emergency Plan. Changes Respond to Comments During 830322 Telcon & Will Be Incorporated Into Rev 13 by 840101 + (20:30:12, 8 January 2025)
- L-83-172, Discusses Mods to Batch C & 16 Selected Batch B Fuel Assemblies Similar to Mods at AR Power & Light Unit 2.Shims Installed on Guide Tubes to Increase Shoulder Gap & Holddown & Flow Plates Machined in Thickness to Maintain Length + (20:30:14, 8 January 2025)
- ML17213B187 + (20:30:16, 8 January 2025)
- L-83-170, Forwards Proprietary Exxon Nuclear Analysis of Power Distribution Measurement Uncertainty for St Lucie,Unit 1. Responses Re Overpressure Mitigating Sys & Cycle 6 Reload Encl.Proprietary Rept Withheld (Ref 10CFR2.790) + (20:30:17, 8 January 2025)
- L-83-171, Advises That Essential Apparatus Will Be Installed by End of First Refueling to Test 8-inch Minipurge Valves in Containment Ventilation Sys Every 92 Days,Per Tech Spec 4.6.1.7.4 + (20:30:18, 8 January 2025)
- ML17213B180 + (20:30:20, 8 January 2025)
- L-83-158, Forwards Const/Startup Monthly Status Rept for Feb 1983. Current Target Fuel Load Date Is 830323 + (20:30:21, 8 January 2025)
- L-83-151, Forwards Revised Justification for Interim Operation,Prior to Installation of Containment Flame Impingement Shields, Highlighting Measures Taken to Provide Fire Protection in Affected Areas Above & Beyond Present NRC Requirements + (20:30:23, 8 January 2025)
- L-83-164, Forwards Suppl 1 to Analytical Justification of Seismic Test Adequacy of St Lucie,Unit 2 CPC & Ni Modules in Reactor Protection Sys Cabinet, Operability Rept + (20:30:25, 8 January 2025)
- ML17213B177 + (20:30:25, 8 January 2025)
- L-83-163, Informs That Amend 14 to FSAR Will Be Issued Approx 4 Months Following Issuance of OL + (20:30:27, 8 January 2025)
- L-83-168, Forwards Final Response to TMI Item II.D.1, Performance Testing of BWR & PWR Relief & Safety Valves. Conclusions Reached in Encl Evaluation on Operability of Pressurizer Safety Valves & PORVs Satisfy Commitment + (20:30:29, 8 January 2025)
- ML17213B172 + (20:30:29, 8 January 2025)
- L-83-169, Forwards Present Schedule to Install TSI Matl Flame Impingement Shields on Lower Most Cable Trays in Containment Cable Tray Racks + (20:30:31, 8 January 2025)
- L-83-161, Forwards Proprietary Rev 0 to Justification of Xnb DNB Correlation for St Lucie Unit 1. Rept Withheld (Ref 10CFR2.790).Affidavit Encl + (20:30:33, 8 January 2025)
- L-83-153, Advises That Remaining Active safety-related Valves, Including safety-related Check Valves,Will Be Stroked After Valve Safety Sys Tested During Hot Functional Testing After Core Load But Prior to Initial Criticality + (20:30:41, 8 January 2025)
- L-83-157, Forwards Addl Info Requested at 830315 Meeting Re Compliance of Surveillance Requirements for Ac Sources w/plant-specific Design.Tech Specs 3/4.8.1.1 Changed as Noted + (20:30:43, 8 January 2025)
- ML17213B164 + (20:30:45, 8 January 2025)
- ML17213B163 + (20:30:46, 8 January 2025)
- L-83-150, Forwards Addl Info to Clarify Aspects of Auxiliary Feedwater Pump Endurance Test Rept,Per Commitment in SER + (20:30:47, 8 January 2025)
- L-83-149, Discusses Concerns Raised by Equipment Qualification Branch Re Testing of pre-aged Batteries,To Demonstrate Seismic Qualification.Batteries Will Be Replaced After 10 Yrs from Purchase Date or Addl Test Data Will Be Provided + (20:30:49, 8 January 2025)
- L-83-142, Responds to 821210 Request for Info on Use of Raychem Flamtrol Cables.Only Cable Affected Is Conductor 2AWG (1-3/C 2) 480-volt Power Cable,Utilized in Six safety-related Applications.Cables to Be Replaced + (20:30:51, 8 January 2025)
- ML17213B159 + (20:30:51, 8 January 2025)
- ML17213B147 + (20:30:53, 8 January 2025)
- ML17213B145 + (20:30:54, 8 January 2025)
- ML17213B146 + (20:30:54, 8 January 2025)
- ML17213B143 + (20:30:55, 8 January 2025)
- ML17213B144 + (20:30:55, 8 January 2025)
- ML17213B142 + (20:30:56, 8 January 2025)
- ML17213B141 + (20:30:57, 8 January 2025)
- ML17213B138 + (20:30:58, 8 January 2025)
- ML17213B140 + (20:30:58, 8 January 2025)
- L-83-145, Submits Addl Info Re Human Factors Issues Under Appeal,Per NRC Mgt 830224-25 Site Visit.Current Configuration of Control Board 206 Will Not Pose Increased Risk to Health & Safety Nor Involve Unreviewed Safety Question + (20:30:59, 8 January 2025)
- L-83-139, Forwards Addl Info Re 821210 Degraded Grid Voltage Protection Submittals,Per 820223 Telcon.Voltage/Time Setpoints Will Be Supported by Two Undervoltage Devices + (20:31:00, 8 January 2025)
- ML17213B132 + (20:31:02, 8 January 2025)
- L-83-129, Application for Amend to License DPR-67 Changing Tech Specs to Modify Surveillance Requirements & Bases Associated W/Chlorine Detection Sys + (20:31:03, 8 January 2025)
- L-83-137, Forwards Comprehensive Vibration Assessment Program,Final Summary Rept, Completing Action Indicated in SER,NUREG- 0843,Section 3.9.2.3.Rept Favorably Correlates Reactor Vibrational Characteristics W/Prototype Reactor + (20:31:05, 8 January 2025)
- ML17213B127 + (20:31:05, 8 January 2025)
- L-83-140, Forwards Proprietary C-E 810821 Responses to Bnwl Questions Re Statistical Combination of Uncertainties That Form Basis of Methodology Used in Support of Facility reloads.C-E Responses Withheld (Ref 10CFR2.790).Affidavit Encl + (20:31:07, 8 January 2025)
- L-83-138, Discusses Commitment Re Fragmentation of Cladding Embrittlement,Per 830303 Meeting.Results of ECCS Analysis Encl.Info Previously Discussed in Section 4.2.3(a) of SER (NUREG-0843) + (20:31:09, 8 January 2025)
- ML17213B120 + (20:31:11, 8 January 2025)
- ML17213B119 + (20:31:12, 8 January 2025)
- ML17213B117 + (20:31:13, 8 January 2025)
- L-83-127, Informs of Intent to Submit Assessment of Operability of Large Pratt Purge & Vent Valves by 830331,per NRC 830216 Request + (20:31:14, 8 January 2025)
- ML17213B111 + (20:31:17, 8 January 2025)
- ML17213B110 + (20:31:18, 8 January 2025)
- ML17213B109 + (20:31:20, 8 January 2025)