RFACTOR COOLANT SYSTEM COLD SHUTDOWN - L00. S FILLED LItlITING CONDITION FOR OPERATION 3.4.1.4.1At least one shutdown cooling loop shall be OPERABLE and in operation'- 'nd either:

a.

One additional shutdown cooling loop shall be OPERABLE, or b.

The secondary side water level of at least two steam generators shall be greater than 105 of narrow range indication.

APPLICABILITY:

MODE 5 with reactor coolant loops filled".

ACTION:

a

~

b.

With less than the above required loops OPEPABLE or with less than the required steam generator level, within one (1) hour initiate corrective action to return the required loops to OPERABLE status or to restore the required level.

With no shutdown cooling loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and within one (1) hour initiate corrective action to.r eturn the required shutdown cooling loop to.operation.

SURVEILLANCE RE UIREi~'LENTS 4.4.1.4.1.1 The secondary side water level of at least two steam generators when required shall be determined to be within limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.4.1.4.1.2 At least one shutdown cooling loop shall be determined to be in operation and circulating reactor coolant at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

    • The shutdown cooling pump may be de-energized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided 1) no operations are permitted that would cause dilution of the Reactor Coolant System boron concentration, and
2) core outlet temperature is mai ntained at

'east 10'F below saturation temperature.

8 One shutdown cooling loop mav be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance testing provided the other shutdown cooling loop is OPERABLE and in operation.

,"gA reactor coolant pump shall not be started with two idle loops in which one-or.more of the Reactor Coolant System cold leg temperatures is less than or equal to 165'F unless

1) the pressurizer water volume is less than 40% indicated level, or 2) the secondary water temperature of each steam" generator is less than 45'F above each of the Reactor Coolant System cold leg temperatures.

ST LUCIE - UNIT 1, 8303140093 820223 PDR ADOCK 05000335 P

PDR 3/4 4-ld Amendment No.

56

REACTOR COOLANT. SYSTEH COLO SHUTDOWN -

LOOPS NOT FILLED LIHITING CONDITION FOR OPERATION 3.4.1.4.2 Two shutdown cooling loops shall be OPERABLE and at least one shut-down cooling loop shall be in operation*.

APPLICABILITY:

i~iODE 5 with reactor coolant loops not filled.

ACTION:

a.

With less than the above required loops OPERABLE, within one (1) hour initiate corrective action to return the required loops to OPERABLE status.

b.

With no shutdown cooling loop in operation, suspend all operations involving a reduction in boron concentration of the Reactor Coolant System and within one (1) hour initiate corrective action to return the required shutdown cooling loop to operation.

SURVEILLANCE RE UIRB4ENTS 4.4.1.4.2 At least one shutdown cooling loop shall be determined to be in operation and circulating reactor coolant at least once per 12.hours.

One shutdown cooling loop may be inoperable for up to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for surveillance

.testing provided the other shutdown cooling loop is OPERABLE and in operation.

The Normal or Emergency Power Source may be inoperable for each shutdown

cooling loop.
  • The shutdown cooling pump may be de-energized for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> provided,l) no operations are permitted that would cause dilution of the Reactor Coolant System boron concentration, and
2) core outlet temperature is maintained at least 10'F below saturation temperature.

ST.

LUCIE - UNIT 1

3/4 4-le Amendment No.

5 6