Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-82-378, Semiannual Radioactive Effluent Release Rept,Jan-June 1982 + (20:21:54, 8 January 2025)
- ML17214A541 + (20:21:56, 8 January 2025)
- ML17214A532 + (20:21:57, 8 January 2025)
- L-83-536, Forwards Procedures Generation Package, Per 830415 Commitment & in Response to Suppl 1 to NUREG-0737.Program Developed to Convert C-E Emergency Procedure Guidelines Into Emergency Operating Procedures + (20:21:58, 8 January 2025)
- ML17214A527 + (20:21:58, 8 January 2025)
- L-83-534, Forwards Class I & Class II Fees for 831012 Application to Amend Licenses DPR-67 & NPF-16.W/o Encl + (20:22:00, 8 January 2025)
- L-83-531, Forwards Proprietary Failure Mechanism Analysis Program. Rept Withheld (Ref 10CFR9.5(4)) + (20:22:02, 8 January 2025)
- L-83-525, Provides Schedule for Submittal of Core Damage Assessment Procedure,Eleventh Criterion of NUREG-0737,Item II.B.3, Post-Accident Sampling Sys. Procedure Will Be Submitted Prior to Startup Following Fall 1984 Refueling Outage + (20:22:07, 8 January 2025)
- L-83-526, Forwards List of Addl ESF Actuation Sys Relays Not Identified in 830926 Submittal or FSAR to Be Nontestable W/O Jeopardizing Plant Safety.Sufficient Justification Provided for Not Testing Relays + (20:22:10, 8 January 2025)
- ML17214A519 + (20:22:10, 8 January 2025)
- L-83-495, Provides Amended Safety Evaluation & Determination of No Significant Hazards in Response to Concerns Re NSHC Determination Submitted w/830825 Proposed License Amend Re Peaking Factor & Load Follow Power Peaking Penalty + (20:22:12, 8 January 2025)
- ML17214A516 + (20:22:14, 8 January 2025)
- ML17214A514 + (20:22:16, 8 January 2025)
- L-83-528, Responds to 830916 Telcon Request for Addl Info on Franklin Research Ctr Technical Evaluation Rept,Item 114 Re Fisher & Porter Pressure Transmitter.Transmitter Inoperability Will Not Affect Safety Sys If Failure Occurs + (20:22:17, 8 January 2025)
- L-83-521, Forwards Rev 5 to Recovery Plan Listing post-core Support Barrel Approximate Repair Flushing Time.Remaining Info Submittal Dates Listed.Thermal Shield Failure Analysis Will Be Submitted by 831027 + (20:22:18, 8 January 2025)
- L-83-518, Application for Amend to Licenses DPR-67 & NPF-16,revising Facility Organization Chart & Modifying Definition of Shift Technical Advisor Function + (20:22:21, 8 January 2025)
- ML17214A504 + (20:22:22, 8 January 2025)
- ML17214A502 + (20:22:24, 8 January 2025)
- ML17214A503 + (20:22:24, 8 January 2025)
- L-83-514, Forwards Draft Emergency Operating Procedure, Alternate Shutdown & Indices App R Cables W/Fire Area Routes & App R Equipment & Cables by Fire Area, Per 10CFR50,App R, Section III.G.3 Requirements + (20:22:25, 8 January 2025)
- ML17214A494 + (20:22:27, 8 January 2025)
- ML17214A493 + (20:22:28, 8 January 2025)
- ML17214A492 + (20:22:29, 8 January 2025)
- ML17214A491 + (20:22:30, 8 January 2025)
- L-83-510, Forwards Inservice Test Program for Pumps & Valves & Rev 0 to PNS-CIG Document 002-10, Inservice Insp,First 10-Yr Plan, Vols 1 & 2 + (20:22:31, 8 January 2025)
- L-83-509, Discusses Reactor Vessel Internals & Thermal Shield & Plant Recovery Program.Outline of Final Rept of Integrity & Stability of Internals W/O Thermal Shield,Presented at 830922 Meeting,Encl.Info Submittal Dates Listed + (20:22:32, 8 January 2025)
- ML17214A486 + (20:22:35, 8 January 2025)
- ML17214A484 + (20:22:40, 8 January 2025)
- L-83-504, Forwards Detailed Control Room Design Review of Plant, St Lucie Unit 2 Nuclear Power Station (NUREG-0737,Suppl 1), Per 830415 Commitment + (20:22:41, 8 January 2025)
- ML17214A480 + (20:22:43, 8 January 2025)
- ML17214A478 + (20:22:45, 8 January 2025)
- ML17214A474 + (20:22:46, 8 January 2025)
- ML17214A471 + (20:22:47, 8 January 2025)
- ML17214A469 + (20:22:48, 8 January 2025)
- ML17214A464 + (20:22:49, 8 January 2025)
- L-83-500, Forwards Class II & Class III Fees for License Amend Applications & 0615,per NRC + (20:22:50, 8 January 2025)
- L-83-497, Forwards List of Specific ESF Actuation Sys Devices & Associated Actuated Equipment Which Cannot Be Tested at Power.Equipment Not Previously Identified in FSAR Table 7.3-9 + (20:22:52, 8 January 2025)
- ML17214A456 + (20:22:54, 8 January 2025)
- ML17214A454 + (20:22:55, 8 January 2025)
- TAC:44404 + (20:22:55, 8 January 2025)
- ML17214A451 + (20:22:57, 8 January 2025)
- ML17214A449 + (20:22:59, 8 January 2025)
- ML17214A444 + (20:23:01, 8 January 2025)
- L-83-491, Forwards One Oversize Drawing Depicting post-core Support Barrel Lug Removal NDE Data,Per Util + (20:23:02, 8 January 2025)
- ML17214A443 + (20:23:02, 8 January 2025)
- ML17214A438 + (20:23:05, 8 January 2025)
- ML17214A440 + (20:23:05, 8 January 2025)
- L-83-489, Application to Amend License DPR-67,deleting Tech Spec Requirement to Perform Containment Leakage Path Test for Penetration 25 (Fuel Transfer Tube) Tap 2 to Prevent Bellows Overpressurization + (20:23:06, 8 January 2025)
- L-83-488, Forwards Suppl 2 to Fire Hazard Analysis Rept + (20:23:07, 8 January 2025)
- ML17214A432 + (20:23:13, 8 January 2025)
- L-83-476, Advises That Engineering Dept Performing Detailed Drawing Review to Confirm Vital Area Equipment Is Contained in Rev 7 to Security Plan.Review Will Be Completed by 830930.Security Plan Will Be Revised to Correct Deviations + (20:23:15, 8 January 2025)