- L-83-582, Forwards Final Rept for Plant Recovery Plan Re Reactor Vessel Internals & Thermal Shield Conclusions & Findings. Schedule Changes Reevaluation of D (5) Integrity & Stability of Internal & D (6) Conclusions & Findings Encl + (20:21:22, 8 January 2025)
- L-83-581, Forwards Tables Summarizing Investigation of Technical Evaluation Rept (TER) Proprietary Pages.Table 1 Identifies TER Pages Where Proprietary Protection Required & Table 2 Lists NRC Proprietary Repts Requiring Protection + (20:21:23, 8 January 2025)
- L-83-578, Advises That Emergency Operations Facility Completed & Declared Operational on 830901 + (20:21:25, 8 January 2025)
- ML17214A582 + (20:21:27, 8 January 2025)
- ML17214A572 + (20:21:31, 8 January 2025)
- ML17214A570 + (20:21:32, 8 January 2025)
- L-83-567, Forwards Addl Info Re Loss of Offsite Power,In Response to NRC & 830926 Telcon + (20:21:33, 8 January 2025)
- ML17214A566 + (20:21:33, 8 January 2025)
- L-83-558, Advises That Proprietary & Nonproprietary Versions of CEN-258(F)-P & CEN-258(F)-NP Plant Recovery Program-Draft Failure Mechanism Analysis Presentation Presented at 831110 Meeting,Provided to D Sells + (20:21:35, 8 January 2025)
- ML17214A562 + (20:21:37, 8 January 2025)
- ML17214A561 + (20:21:38, 8 January 2025)
- ML17214A558 + (20:21:39, 8 January 2025)
- ML17214A557 + (20:21:40, 8 January 2025)
- ML17214A555 + (20:21:41, 8 January 2025)
- L-83-554, Forwards Procedures to Support Util Actions Re Generic Ltr 83-28 on Generic Implications of Salem ATWS Events + (20:21:42, 8 January 2025)
- ML17214A552 + (20:21:44, 8 January 2025)
- L-83-545, Notifies That Presentation of Thermal Shield Failure Analysis,As Part of Plant Recovery Program,Rescheduled for 831110,per NRC Request + (20:21:45, 8 January 2025)
- ML17214A550 + (20:21:47, 8 January 2025)
- ML17214A549 + (20:21:47, 8 January 2025)
- L-83-546, Forwards Detailed Control Room Design Review, Summary Rept,Per 830415 Commitment,Suppl 1 to NUREG-0737 & TMI Item I.D.1 + (20:21:48, 8 January 2025)
- ML17214A546 + (20:21:50, 8 January 2025)
- L-83-538, Notifies That Reactor Vessel Surveillance Specimen Rept Summarizing Test Results Will Be Provided by 831215 + (20:21:51, 8 January 2025)
- ML17214A544 + (20:21:53, 8 January 2025)
- L-82-378, Semiannual Radioactive Effluent Release Rept,Jan-June 1982 + (20:21:54, 8 January 2025)
- ML17214A541 + (20:21:56, 8 January 2025)
- ML17214A532 + (20:21:57, 8 January 2025)
- L-83-536, Forwards Procedures Generation Package, Per 830415 Commitment & in Response to Suppl 1 to NUREG-0737.Program Developed to Convert C-E Emergency Procedure Guidelines Into Emergency Operating Procedures + (20:21:58, 8 January 2025)
- ML17214A527 + (20:21:58, 8 January 2025)
- L-83-534, Forwards Class I & Class II Fees for 831012 Application to Amend Licenses DPR-67 & NPF-16.W/o Encl + (20:22:00, 8 January 2025)
- L-83-531, Forwards Proprietary Failure Mechanism Analysis Program. Rept Withheld (Ref 10CFR9.5(4)) + (20:22:02, 8 January 2025)
- L-83-525, Provides Schedule for Submittal of Core Damage Assessment Procedure,Eleventh Criterion of NUREG-0737,Item II.B.3, Post-Accident Sampling Sys. Procedure Will Be Submitted Prior to Startup Following Fall 1984 Refueling Outage + (20:22:07, 8 January 2025)
- L-83-526, Forwards List of Addl ESF Actuation Sys Relays Not Identified in 830926 Submittal or FSAR to Be Nontestable W/O Jeopardizing Plant Safety.Sufficient Justification Provided for Not Testing Relays + (20:22:10, 8 January 2025)
- ML17214A519 + (20:22:10, 8 January 2025)
- L-83-495, Provides Amended Safety Evaluation & Determination of No Significant Hazards in Response to Concerns Re NSHC Determination Submitted w/830825 Proposed License Amend Re Peaking Factor & Load Follow Power Peaking Penalty + (20:22:12, 8 January 2025)
- ML17214A516 + (20:22:14, 8 January 2025)
- ML17214A514 + (20:22:16, 8 January 2025)
- L-83-528, Responds to 830916 Telcon Request for Addl Info on Franklin Research Ctr Technical Evaluation Rept,Item 114 Re Fisher & Porter Pressure Transmitter.Transmitter Inoperability Will Not Affect Safety Sys If Failure Occurs + (20:22:17, 8 January 2025)
- L-83-521, Forwards Rev 5 to Recovery Plan Listing post-core Support Barrel Approximate Repair Flushing Time.Remaining Info Submittal Dates Listed.Thermal Shield Failure Analysis Will Be Submitted by 831027 + (20:22:18, 8 January 2025)
- L-83-518, Application for Amend to Licenses DPR-67 & NPF-16,revising Facility Organization Chart & Modifying Definition of Shift Technical Advisor Function + (20:22:21, 8 January 2025)
- ML17214A504 + (20:22:22, 8 January 2025)
- ML17214A502 + (20:22:24, 8 January 2025)
- ML17214A503 + (20:22:24, 8 January 2025)
- L-83-514, Forwards Draft Emergency Operating Procedure, Alternate Shutdown & Indices App R Cables W/Fire Area Routes & App R Equipment & Cables by Fire Area, Per 10CFR50,App R, Section III.G.3 Requirements + (20:22:25, 8 January 2025)
- ML17214A494 + (20:22:27, 8 January 2025)
- ML17214A493 + (20:22:28, 8 January 2025)
- ML17214A492 + (20:22:29, 8 January 2025)
- ML17214A491 + (20:22:30, 8 January 2025)
- L-83-510, Forwards Inservice Test Program for Pumps & Valves & Rev 0 to PNS-CIG Document 002-10, Inservice Insp,First 10-Yr Plan, Vols 1 & 2 + (20:22:31, 8 January 2025)
- L-83-509, Discusses Reactor Vessel Internals & Thermal Shield & Plant Recovery Program.Outline of Final Rept of Integrity & Stability of Internals W/O Thermal Shield,Presented at 830922 Meeting,Encl.Info Submittal Dates Listed + (20:22:32, 8 January 2025)
- ML17214A486 + (20:22:35, 8 January 2025)
- ML17214A484 + (20:22:40, 8 January 2025)
- L-83-504, Forwards Detailed Control Room Design Review of Plant, St Lucie Unit 2 Nuclear Power Station (NUREG-0737,Suppl 1), Per 830415 Commitment + (20:22:41, 8 January 2025)