Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17214A643 + (20:20:46, 8 January 2025)
- ML17214A642 + (20:20:47, 8 January 2025)
- ML17214A640 + (20:20:49, 8 January 2025)
- L-17-233, High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force (NTTF) Review of Insights from the Fukishima Dai-ichi Accident + (20:20:50, 8 January 2025)
- ML17214A638 + (20:20:50, 8 January 2025)
- ML17214A637 + (20:20:51, 8 January 2025)
- ML17214A634 + (20:20:52, 8 January 2025)
- ML17214A635 + (20:20:52, 8 January 2025)
- ML17214A632 + (20:20:53, 8 January 2025)
- ML17214A633 + (20:20:53, 8 January 2025)
- ML17214A628 + (20:20:54, 8 January 2025)
- ML17214A631 + (20:20:54, 8 January 2025)
- ML17214A624 + (20:20:55, 8 January 2025)
- ML17214A622 + (20:20:56, 8 January 2025)
- L-83-605, Forwards Evaluation Rept on Existing Accident Monitoring Instrumentation & Control Sys,In Conjunction W/Suppl 1 to NUREG-0737 & Requirements of Rev 3 to Reg Guide 1.97 + (20:20:57, 8 January 2025)
- L-83-601, Application for Amend to License NPF-16,to Bring Unit 2 Tech Specs in Compliance W/Unit 1.Limiting Conditions of Operation Not Needed Below 30% of Rated Thermal Power + (20:20:59, 8 January 2025)
- ML17214A619 + (20:20:59, 8 January 2025)
- ML17214A616 + (20:21:01, 8 January 2025)
- L-83-600, Provides Info Requested Re Seized Rotor Event,Per 831107 Telcon.Graphs Encl.Info Suppls Analysis Contained in 820831 Submittal + (20:21:05, 8 January 2025)
- ML17214A614 + (20:21:05, 8 January 2025)
- ML17214A609 + (20:21:08, 8 January 2025)
- ML17214A607 + (20:21:09, 8 January 2025)
- L-83-594, Clarifies Question Raised During Evaluation of 830916 Request for Amend to Tech Specs Re Containment Leakage Path Testing of Fuel Transfer Tube Penetration.Proposed Amend Administrative in Nature & Involves Nshc.Fee Encl + (20:21:11, 8 January 2025)
- L-83-590, Informs That Results of Detailed Analysis of Data from Natural Circulation Cooldown/Boron Mixing Test Expected by End of 1983.Meeting W/Southern California Edison Re Commercial Aspects of Using Data Scheduled for Wk of 840101 + (20:21:12, 8 January 2025)
- L-83-584, Discusses 830711 Request for Transfer to NRC of ex-core Detector Neutron Noise & Accelerometer Data from Plant Recovery Program.Frequency Spectra Plots for Time Period of Interest & Magnetic Tapes Being Forwarded to D Fry of ORNL + (20:21:14, 8 January 2025)
- L-83-588, Commits to Listed Mods to App R Fire Protection Exemption Requests.Commitments Should Be Incorporated Into Appropriate Sections as Rev 2 to Fire Protection Submittal + (20:21:16, 8 January 2025)
- ML17214A594 + (20:21:18, 8 January 2025)
- L-83-572, Requests Change in Registration for Packages Based on Reorganizational Changes & That Unit 2 Be Added to General License + (20:21:19, 8 January 2025)
- ML17214A592 + (20:21:20, 8 January 2025)
- ML17214A591 + (20:21:21, 8 January 2025)
- L-83-582, Forwards Final Rept for Plant Recovery Plan Re Reactor Vessel Internals & Thermal Shield Conclusions & Findings. Schedule Changes Reevaluation of D (5) Integrity & Stability of Internal & D (6) Conclusions & Findings Encl + (20:21:22, 8 January 2025)
- L-83-581, Forwards Tables Summarizing Investigation of Technical Evaluation Rept (TER) Proprietary Pages.Table 1 Identifies TER Pages Where Proprietary Protection Required & Table 2 Lists NRC Proprietary Repts Requiring Protection + (20:21:23, 8 January 2025)
- L-83-578, Advises That Emergency Operations Facility Completed & Declared Operational on 830901 + (20:21:25, 8 January 2025)
- ML17214A582 + (20:21:27, 8 January 2025)
- ML17214A572 + (20:21:31, 8 January 2025)
- ML17214A570 + (20:21:32, 8 January 2025)
- L-83-567, Forwards Addl Info Re Loss of Offsite Power,In Response to NRC & 830926 Telcon + (20:21:33, 8 January 2025)
- ML17214A566 + (20:21:33, 8 January 2025)
- L-83-558, Advises That Proprietary & Nonproprietary Versions of CEN-258(F)-P & CEN-258(F)-NP Plant Recovery Program-Draft Failure Mechanism Analysis Presentation Presented at 831110 Meeting,Provided to D Sells + (20:21:35, 8 January 2025)
- ML17214A562 + (20:21:37, 8 January 2025)
- ML17214A561 + (20:21:38, 8 January 2025)
- ML17214A558 + (20:21:39, 8 January 2025)
- ML17214A557 + (20:21:40, 8 January 2025)
- ML17214A555 + (20:21:41, 8 January 2025)
- L-83-554, Forwards Procedures to Support Util Actions Re Generic Ltr 83-28 on Generic Implications of Salem ATWS Events + (20:21:42, 8 January 2025)
- ML17214A552 + (20:21:44, 8 January 2025)
- L-83-545, Notifies That Presentation of Thermal Shield Failure Analysis,As Part of Plant Recovery Program,Rescheduled for 831110,per NRC Request + (20:21:45, 8 January 2025)
- ML17214A550 + (20:21:47, 8 January 2025)
- ML17214A549 + (20:21:47, 8 January 2025)
- L-83-546, Forwards Detailed Control Room Design Review, Summary Rept,Per 830415 Commitment,Suppl 1 to NUREG-0737 & TMI Item I.D.1 + (20:21:48, 8 January 2025)
- ML17214A546 + (20:21:50, 8 January 2025)