Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-84-306, Informs of Nonconformance W/Vendor Equipment Technical Info Program Recommendations (Generic Ltr 83-28,Item 2.2.2) in Areas of Internal Handling of Vendor Svcs & Vendor Info. Revised Procedures to Be Incorporated by 841215 + (20:15:28, 8 January 2025)
- L-84-301, Provides Justification That Loss of One LPSI Pump Worst Active Failure,In Response to Amend 63 to SER for Cycle 6 Restart + (20:15:30, 8 January 2025)
- L-84-287, Ack Receipt of 840914 Request for Addl Info Re Inservice Insp Program.Requested Info Will Be Submitted by 841119 + (20:15:32, 8 January 2025)
- L-84-296, Advises That Complete Response to Re NUREG-0737, Item II.F.2, Inadequate Core Cooling Instrumentation Sys, Will Be Provided by 841031,per 841019 Commitment + (20:15:34, 8 January 2025)
- L-84-274, Responds to Item 2 of Generic Ltr 84-15 Re Improvement & Maint of Diesel Generator Reliability.Formal Log to Readily Meet Intent of Reg Guide 1.108 Implemented + (20:15:36, 8 January 2025)
- L-84-280, Application for Amend to License NPF-16,revising Tech Specs to Implement Hardware Change in Continuous Containment Purge Sys.Mod to Station Air Sys Planned to Replace Containment Isolation Valves I-V-18-794 & I-V-18-796 + (20:15:38, 8 January 2025)
- ML17215A610 + (20:15:38, 8 January 2025)
- ML17215A604 + (20:15:41, 8 January 2025)
- ML17215A597 + (20:15:42, 8 January 2025)
- ML17215A595 + (20:15:43, 8 January 2025)
- ML17215A594 + (20:15:45, 8 January 2025)
- ML17215A592 + (20:15:45, 8 January 2025)
- L-84-273, Advises That Re Spent Fuel Storage Inadvertently Numbered L-84-266.Number Should Be L-84-272 + (20:15:47, 8 January 2025)
- ML17215A591 + (20:15:47, 8 January 2025)
- L-84-262, Forwards Response to Requesting Addl Info Re Facility Cycle 2 Reload.Response to Item 13 Proprietary to C-E.Response to Item 13 Withheld (Ref 10CFR2.790) + (20:15:49, 8 January 2025)
- L-84-266, Documents Agreement Reached W/Nrc Re Handling & Storage of Fuel Assemblies.Fuel Assemblies Situated in Spent Fuel Pool for Insp &/Or Mod Not Considered Stored + (20:15:51, 8 January 2025)
- ML17215A584 + (20:15:52, 8 January 2025)
- ML17215A582 + (20:15:53, 8 January 2025)
- L-84-227, Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1984 + (20:15:54, 8 January 2025)
- ML17215A579 + (20:15:56, 8 January 2025)
- ML17215A578 + (20:15:57, 8 January 2025)
- L-84-251, Forwards Proprietary Response to NRC 840705 Request for Addl Info Re Creep Collapse Calculations Given in Cycle 6 Reload Rept.Response Supports Application of Exxon Nuclear Corp Methods to C-E Fuel.Response Withheld (Ref 10CFR2.790) + (20:15:59, 8 January 2025)
- ML17215A576 + (20:15:59, 8 January 2025)
- NL-17-1366, Proposed Alternative RR-V-11 Regarding Main Steam Safety Relief Valve Testing Requirements + (20:16:01, 8 January 2025)
- L-84-246, Forwards Clarifying Info Re Postulated Reactor Coolant Pump Seized Rotor & Loss of All Nonemergency Ac Events,Per 840213 Request + (20:16:02, 8 January 2025)
- L-84-235, Informs That Proposed License Amend Re Containment Ventilation Sys Submitted on 840831 Forwarded to Designee for State of Fl + (20:16:03, 8 January 2025)
- ML17215A555 + (20:16:06, 8 January 2025)
- ML17215A553 + (20:16:07, 8 January 2025)
- L-84-225, Application for Amend to License NPF-16,modifying Tech Specs to Remove Restriction Allowing 8-inch Containment Purge Valves to Be Open Only for Less than or Equal to 1,000 H/Yr + (20:16:08, 8 January 2025)
- ML17215A549 + (20:16:08, 8 January 2025)
- L-84-217, Submits Mod to Fire Hazard Analysis.Smoke Detection in Shutdown HX Room Will Be Placed in Hve 10A & B Exhaust Ducts.Design Will Reduce Radiation Exposure to Workers During Installation of Detectors + (20:16:11, 8 January 2025)
- L-84-223, Requests Schedular Extensions for Responding to Items in NRC Re Improving & Maintaining Diesel Generator Reliability.Responses to Items 1 & 3 Will Be Provided by 850131 & Item 2 in 90 Days,Per Generic Ltr 84-15 + (20:16:13, 8 January 2025)
- L-84-222, Forwards License Amend Fees in Response to 840809 & 10 Requests + (20:16:15, 8 January 2025)
- ML17215A538 + (20:16:17, 8 January 2025)
- L-84-208, Submits Results of Recalculated Figures of Offsite Doses for Fuel Handling Accident.Calculations Remain Same as Presented in Table 5-7 of Spent Fuel Pool Rerack SAR Except No Credit Taken for Filters + (20:16:18, 8 January 2025)
- ML17215A537 + (20:16:18, 8 January 2025)
- L-84-203, Advises That Permanent Refueling Canal Sump Pump Will Not Be Installed,Per 821008 Commitment.Mod Determined Unnecessary + (20:16:20, 8 January 2025)
- L-84-204, Forwards Info Re Cycle 2 Reload,Per 840621 Request + (20:16:23, 8 January 2025)
- ML17215A529 + (20:16:23, 8 January 2025)
- ML17215A527 + (20:16:25, 8 January 2025)
- L-84-194, Responds to B Wright Question Re Correlation of Data on 48-inch Purge Valves.Henry Pratt Co Provided Verification Model Testing for 48-inch Ria Included Model W/Disc Structure Similar to Model Installed at Plant + (20:16:27, 8 January 2025)
- ML17215A522 + (20:16:27, 8 January 2025)
- ML17215A518 + (20:16:29, 8 January 2025)
- L-84-191, Informs That Complete Response to 840531 Request for Addl Info Re Util Concerning RCS Asymmetric LOCA Loads Evaluation Expected by 841001.Delay Due to Detailed Nature of Response + (20:16:32, 8 January 2025)
- ML17215A511 + (20:16:34, 8 January 2025)
- ML17215A510 + (20:16:35, 8 January 2025)
- ML17215A508 + (20:16:36, 8 January 2025)
- ML17215A506 + (20:16:37, 8 January 2025)
- ML17215A503 + (20:16:38, 8 January 2025)
- ML17215A501 + (20:16:39, 8 January 2025)
- ML17215A500 + (20:16:40, 8 January 2025)