UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE INSERVICE INSPECTION PROGRAM OF THE LOW PRESSURE TURBINE DISCS FLORIDA POWER AND LIGHT COMPANY Et Al.

ST.

LUCIE PLANT, UNIT NO.

2 DOCKET NO. 50-389 Introduction Section 10.2. 1 of the St. Lucie Plant, Unit No. 2, Safety Evaluation Report (October 1981) contains the staff's conclusion that the low-pressure (LP) turbine discs should be inspected during the first refueling outage.

The licensee commitment to this inspection was documented in Supplement No.

3 to the Safety Evaluation Report (April 1983).

In a letter dated April 9, 1984 the licensee requested that the commitment contained in Supplement No.

3 be deleted and replaced with a commitment to perform turbine disc inspec-tions in accordance with the turbine vendor's recommended intervals.

Additional clarifying information was provided by a letter dated August 6, 1984.

Discussion The inspection commitment contained in the St. Lucie' Safety Evaluation Report resulted from the review of the St. Lucie 2

FSAR.

At the time of the review, the licensee had not yet received from the turbine vendor (Westinghouse) the recommended inspection intervals for the St. Lucie 2 LP turbine discs.

This was due to the fact that the turbine vendor was giving priority to operating plants and determined the inspection intervals for those plants first.

The licensee received a letter from the vendor dated January 30, 1982 containing the recommended inspection intervals for the St. Lucie 2 turbine discs.

This letter specified an inspection interval of 3.49 years for LP¹1 and an inspec-tion interval of 3. 12 years for LP¹2.

These recommended inspection intervals comply with the new criteria accepted by the staff and detailed in the NRC letter to the licensee dated August 21, 1981.

The staff concluded that the inspection intervals for dis'cs on nuclear LP rotors provide an acceptably high degree of assurance that the discs will be inspected before cracks can grow to a size that could cause disc failure at speeds up to design speed.

The licensee subsequently committed to follow the inspection intervals recommended by the vendor for the licensee's other operating units, St. Lucie I and Turkey Point 3

8 4.

84>01iosee S40eao pDR *@DOCK 05000389.

8

=

'DR

~

~

N

In the course of the staff review, additional information regarding the turbine vendor's method of determining the turbine disc temperature that should be used for crack growth calculations was requested.

This information was supplied in the August 6, 1984 letter, along with a table that updates the table currently in the FSAR.

This updated table will be incorporated in the next revision to the FSAR.

Conclusions Based on the information that has been supplied by the licensee, the staff has concluded that temperatures used by the turbine vendor are consistent with the criterion that has been found acceptable by the staff.

Therefore, it is con-cluded that turbine disc inspection intervals of 3.49 years and 3.12 years for LP 1 and LP 2, respectively, are acceptable.

Principle Contributor:

W. Hazelton D. Sells

@~s