Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17228A352 + (18:49:12, 8 January 2025)
- ML17228A338 + (18:49:13, 8 January 2025)
- ML17228A337 + (18:49:13, 8 January 2025)
- L-93-259, Application for Amends to Licenses DPR-67 & NPF-16,proposing Changes to TS 4.6.1.2.a,containment Leakage Surveillance Requirements, to Be Consistent W/Guidance of NUREG-1432, STS for C-E Plants + (18:49:14, 8 January 2025)
- L-93-274, Application for Amends to Licenses DPR-67 & NPF-16,removing Surveillance Requirements Re Dune & Mangrove Surveys from Tech Specs + (18:49:16, 8 January 2025)
- ML17228A334 + (18:49:16, 8 January 2025)
- ML17228A331 + (18:49:19, 8 January 2025)
- TAC:M87217 + (18:49:20, 8 January 2025)
- L-93-254, Requests Approval of Second Insp Interval Relief Request 18 Re Sys Pressure Test Requirements + (18:49:21, 8 January 2025)
- ML17228A329 + (18:49:21, 8 January 2025)
- 05000335/LER-1993-007-01, :on 930918,20 & 22,reactor Trips Initiated to Prevent Equipment Damage Due to Abnormal Influx of Jellyfish.Temporary Air Bubbler & Surface Net Placed in Intake to Collect Jellyfish + (18:49:24, 8 January 2025)
- L-93-263, Monthly Operating Repts for Sept 1993 for St Lucie Units 1 & 2 + (18:49:25, 8 January 2025)
- ML17228A324 + (18:49:27, 8 January 2025)
- 05000335/LER-1993-006-01, :on 930910,determined That Meteorological Tower Instrumentation Had Been Out of Svc Since 930909 Due to Personnel Error.Operating Procedure 1400051 Revised + (18:49:28, 8 January 2025)
- IR 05000335/1993016 + (18:49:29, 8 January 2025)
- IR 05000335/1993019 + (18:49:35, 8 January 2025)
- ML17228A318 + (18:49:37, 8 January 2025)
- ML17228A316 + (18:49:37, 8 January 2025)
- L-93-235, Application Amend to License NPF-16,deleting TS 6.2.3, Independent Safety Engineering Group & Adding TS 6.5.2.9, Technical Review Responsibilities + (18:49:38, 8 January 2025)
- L-93-229, Forwards Response to Suppl 5 to GL 89-10, Inaccuracy of Motor Operated Valve Diagnostic Equipment, for Units 1 & 2 + (18:49:40, 8 January 2025)
- ML17228A312 + (18:49:40, 8 January 2025)
- L-93-243, Forwards Spiked Sample Results Analyzed by Util in Response to NRC .Results Back Decay Corrected to 911010 + (18:49:42, 8 January 2025)
- ML17228A309 + (18:49:44, 8 January 2025)
- ML17228A306 + (18:49:45, 8 January 2025)
- ML17228A305 + (18:49:46, 8 January 2025)
- L-93-231, Monthly Operating Repts for Aug 1993 for St Lucie,Units 1 & 2 + (18:49:47, 8 January 2025)
- L-93-237, Forwards Rev 0 of Second ISI Interval Second Insp Period Second Outage 1993 Summary Rept Submittal. Rept Provides Info Required to Be Included in SG Tube ISI Special Rept + (18:49:49, 8 January 2025)
- ML17228A302 + (18:49:49, 8 January 2025)
- ML17228A298 + (18:49:51, 8 January 2025)
- ML17228A296 + (18:49:51, 8 January 2025)
- ML17228A295 + (18:49:52, 8 January 2025)
- L-93-236, Forwards St Lucie Unit 1,Cycle 12 Startup Physics Testing Rept + (18:49:53, 8 January 2025)
- L-93-232, Responds to 930728 RAI Response to GL 92-01 Rev 1, Reactor Vessel Structural Integrity Per 10CFR50.54(f) + (18:49:54, 8 January 2025)
- L-93-215, Informs That CEOG Rept CEN-387-P,Rev 1,applicable & Bounds Plant & Except for NRC Bulletin 88-011,Action Item 1.d, Updating of Plant Specific Stress & Fatigue Analyses,Actions in Bulletin Complete.Item to Be Complete by 940131 + (18:49:57, 8 January 2025)
- ML17228A289 + (18:49:57, 8 January 2025)
- ML17228A280 + (18:49:59, 8 January 2025)
- ML17228A276 + (18:50:02, 8 January 2025)
- IR 05000335/1993018 + (18:50:08, 8 January 2025)
- ML17228A272 + (18:50:09, 8 January 2025)
- ML17228A271 + (18:50:10, 8 January 2025)
- L-93-127, Application for Amend to License NPF-16,requesting Approval of Improved Methodology, Extended Statistical Combination of Uncertainties (Escu). Proprietary Rept CEN-371(F)-P Encl.Rept Withheld (Ref 10CFR2.790(a)(4)) + (18:50:11, 8 January 2025)
- ML17228A268 + (18:50:13, 8 January 2025)
- ML17228A267 + (18:50:13, 8 January 2025)
- L-93-183, Application for Amend to License NPF-16,deleting Option of Using Movable Incore Detector to Determine Incore Instrumentation Sys Operability from TS 3.3.3.2 + (18:50:14, 8 January 2025)
- ML17228A264 + (18:50:19, 8 January 2025)
- L-93-206, Forwards St Lucie Nuclear Plant,Unit 1 Reactor Containment Bldg ILRT Rept,Documenting Results of Type a Leakage Rate Testing & Including Suppl Controlled Leakage Rate Test Method Utilized for Verification.Test Completed on 930520 + (18:50:20, 8 January 2025)
- L-93-207, Comments on Suppl to GL 86-10, Fire Endurance Acceptance Criteria for Fire Barrier Sys Used to Separate Redundant Safe Shutdown Trains within Same Fire Area + (18:50:21, 8 January 2025)
- L-93-198, Monthly Operating Repts for Jul 1993 for St Lucie,Units 1 & 2 + (18:50:24, 8 January 2025)
- ML17228A255 + (18:50:24, 8 January 2025)
- IR 05000335/1993012 + (18:50:28, 8 January 2025)
- ML17228A247 + (18:50:29, 8 January 2025)