Forwards SER Granting Licensee 930730 Request for Relief from Asme,Section XI Requirements to Allow Repair of ASME Class 2 Structures
ML17228A329
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 10/21/1993
From: Berkow H
Office of Nuclear Reactor Regulation
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17228A330 List:
References
TAC-M87217, NUDOCS 9310270024
Download: ML17228A329 (4)


Text

October 21, 19

. ~

Docket No. 50-335 Hr. J.

H. Goldberg President Nuclear Division Florida Power and Light Company Post Office Box 14000 Juno

Beach, Florida 33408-0420

Dear Hr. Goldberg:

SUBJECT:

ST.

LUCIE UNIT 1 RELIEF TO ALLOW A NON-CODE TEHPORARY REPAIR OF THE REFUELING WATER TANK (TAC NO. H87217)

As detailed in the attached safety evaluation, the staff has determined that Code repair requirements in this case are impractical, as defined under the provisions of 10 CFR 50.55a(g)(6)(i),

and that granting of the requested relief is authorized by law and will not endanger life or property or the common defense or security and is otherwise in the public interest, given due consideration to the burden upon the licensee and facility that could result if the Code requirements were imposed on the facility.

Therefore, pursuant to 10 CFR 50.55a(g)(6)(i), relief is granted until the next scheduled refueling outage for the St. Lucie Unit 1 facility, upon which the leaking portion of the RWT is required to be repaired or replaced in accordance with the appropriate provisions of the ASHE Code,Section XI.

Sincerely, (Original Signed By)

Herbert N. Berkow, Director Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation ib

Enclosure:

Safety Evaluation Docket File NRC & Local PDRs cc w/enclosure:

PDII-2 RF See next page S. Varga G. Lainas H. Berkow E. Tana OGC ACRS (10)

H. Sinkule, RII By letter dated July 30, 1993, you submitted a request for relief from the American Society of Hechanical Engineers (ASHE) Code,Section XI requirements regarding repair of ASHE Class 1, 2, or 3 structures.

You wish to perform a

temporary non-ASHE Section XI repair of the St. Lucie Unit 1 refueling water tank (RWT), an ASHE Class 2 structure.

The St. Lucie staff discovered a few weeks earlier that the bottom plate of the tank has developed a pinhole leak.

OFFICE LA:PDI I-2 p

D: PDI I NAME ETana d/V No~ is ms HBerko t

DATE 10 d/

93 1

93 10 93 OFFICIAL RECORD COPY DOCUHENT NAHE: C:iAUTOSiWPDOCSiSTLUCIEiSL87217.RWT 9320270024 931021~

'DR ADOCK 05000335'(

P200F~ 7

@Fo

(

Ill

(h

t

Ar. J.

H. Goldberg Florida Power and Light Company CC:

Jack Shreve, Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, Florida 32399-1400 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.

Hwy AlA Jensen Beach, Florida 34957 Mr. Joe Myers, Director Div. of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Harold F. Reis, Esq.

Newman

& Holtzinger 1615 L Street, N.W.

Washington, DC 20036 John T. Butler, Esq.

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 34982 Mr. Thomas R.L. Kindred County Administrator St. Lucie County 2300 Virginia Avenue Fort Pierce, Florida 34982 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB Combustion Engineering, Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 St. Lucie Plant Mr. Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.

Tallahassee, Florida 32399-0700 Regional Administrator, RII U.S. Nuclear Regulatory Coamission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. H. N. Paduano

Manager, Licensing 5 Special Projects Florida Power and Light Company P.O.

Box 14000

".Juno Beach, Florida 33408-0420 D. A. Sager Vice President St. Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0128 C. L. Burton Plant General Manager St. Lucie Nuclear Plant P.O.

Box 128 Ft. Pierce, Florida 34954-0128

'