Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17229A385 + (18:20:32, 8 January 2025)
- 05000389/LER-1997-002-03, :on 970518,containment Sump Debris Screen Was Not IAW Design Due to Gaps in Screen Encl.Performed SER to Document Containment Sump Design Requirements + (18:20:33, 8 January 2025)
- ML17229A382 + (18:20:35, 8 January 2025)
- ML17229A380 + (18:20:36, 8 January 2025)
- L-97-146, Monthly Operating Repts for May 1997 for St Lucie,Units 1 & 2 + (18:20:37, 8 January 2025)
- ML17229A378 + (18:20:39, 8 January 2025)
- ML17229A377 + (18:20:40, 8 January 2025)
- ML17229A376 + (18:20:41, 8 January 2025)
- 05000335/LER-1997-006, :on 970501,operation Was Prohibited by TS Due to Inadequately Tested Degraded Voltage Sys.Revised Unit 1 ESFAS Surveillance Test Procedure + (18:20:42, 8 January 2025)
- ML17229A374 + (18:20:44, 8 January 2025)
- ML17229A373 + (18:20:46, 8 January 2025)
- L-97-141, Final Analysis of Radiological Consequences of Main Steam Line Break Outside Containment for St Lucie Unit 1 Nuclear Power Plant Using NUREG-0800 Std Review Plan Section 15.1.5, App a, Rev 1 + (18:20:47, 8 January 2025)
- ML17229A371 + (18:20:47, 8 January 2025)
- ML17229A368 + (18:20:49, 8 January 2025)
- ML17229A367 + (18:20:50, 8 January 2025)
- TAC:M98163 + (18:20:51, 8 January 2025)
- TAC:M98787 + (18:20:52, 8 January 2025)
- ML17229A365 + (18:20:52, 8 January 2025)
- ML17229A364 + (18:20:53, 8 January 2025)
- ML17229A363 + (18:20:54, 8 January 2025)
- L-97-140, Communicates Util Plans for Eddy Current Testing of Replacement SGs for Unit 1.Concludes That SRs of Unit 1 TS 3.4.5 Not Applicable to Preservice Insp of Replacement SGs + (18:20:55, 8 January 2025)
- 05000335/LER-1997-007, :on 970502,reactor Coolant Pump Oil Collection Sys Was Outside App R Design Bases.Identified Leak Sites Were Repaired & Mods to RCP Oil Collection Sys to Capture Any Future Leakage from Areas + (18:20:57, 8 January 2025)
- ML17229A360 + (18:20:58, 8 January 2025)
- L-97-134, Application for Amends to Licenses DPR-67 & NPF-16, Incorporating Administrative Changes That Will Improve Consistency Throughout TSs & Related Bases + (18:20:59, 8 January 2025)
- TAC:M92014 + (18:21:01, 8 January 2025)
- ML17229A357 + (18:21:02, 8 January 2025)
- ML17229A356 + (18:21:04, 8 January 2025)
- ML17229A355 + (18:21:05, 8 January 2025)
- TAC:M97706 + (18:21:05, 8 January 2025)
- ML17229A353 + (18:21:06, 8 January 2025)
- ML17229A352 + (18:21:07, 8 January 2025)
- TAC:M96890 + (18:21:08, 8 January 2025)
- ML17229A350 + (18:21:09, 8 January 2025)
- 05000389/LER-1997-001-03, :on 970423,containment Isolation Actuation Occurred.Caused by Increased Radiation Levels During Removal of Upper Guide Structure.Proper Actuation of Containment Isolation Components Was Verified + (18:21:10, 8 January 2025)
- L-97-135, Confirms Completion of NRC GL 96-01, Testing of SR Logic Circuits Review & Procedure Changes for Plant,Unit 2 + (18:21:11, 8 January 2025)
- L-97-136, Forwards Response to NRC 970313 RAI on Pressurized Thermal Shock Submittals for Plant Rv Beltline Matls Per 10CFR50.61 + (18:21:13, 8 January 2025)
- L-97-110, Informs NRC Staff of Util Plans for Cycle Length of Unit 1 Cycle 15.Plans Include Need for Exercising 25% Maximum Allowable Surveillance Interval for TS SR During That Cycle + (18:21:14, 8 January 2025)
- L-97-129, Monthly Operating Repts for Apr 1997 for St Lucie Units 1 & 2 + (18:21:16, 8 January 2025)
- 05000335/LER-1997-005, :on 970419,reactor Was Shutdown Due to Reactor Coolant Pressure Boundary Leakage.Hot Cracking Was Caused by Weld Contamination.Repairs to RCPB Were Completed & 1A SDC Train Was Restored to Svc + (18:21:18, 8 January 2025)
- ML17229A343 + (18:21:20, 8 January 2025)
- ML17229A341 + (18:21:21, 8 January 2025)
- ML17229A340 + (18:21:22, 8 January 2025)
- ML17229A339 + (18:21:23, 8 January 2025)
- ML17229A338 + (18:21:24, 8 January 2025)
- ML17229A337 + (18:21:25, 8 January 2025)
- ML17229A336 + (18:21:26, 8 January 2025)
- ML17229A335 + (18:21:27, 8 January 2025)
- ML17229A334 + (18:21:28, 8 January 2025)
- ML17229A333 + (18:21:29, 8 January 2025)
- ML17229A332 + (18:21:31, 8 January 2025)
- L-97-131, Submits SG Tubes Plugged During Spring 1997 Unit 2 Refueling Outage + (18:21:32, 8 January 2025)