Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17276B719 + (12:50:49, 8 January 2025)
- GO2-82-886, Informs of Option Selected to Justify Use of Square Root of Sum of Squares Method for Combining Dynamic Responses Due to Seismic & Hydrodynamic Loads,Per NRC 820722 Request. Generation of Cumulative Distribution Functions Chosen + (12:50:50, 8 January 2025)
- GO2-82-880, Forwards Pump & Valve Operability Assurance Review Audit Forms,In Response to 820809 Request for Addl Info.Components Identified by Eg&G Via Telcon.Valves MS-RV-1A & RCIC-V-19 Not Installed.Remaining Components Installed + (12:50:55, 8 January 2025)
- ML17276B715 + (12:50:59, 8 January 2025)
- ML17276B713 + (12:51:01, 8 January 2025)
- ML17276B712 + (12:51:06, 8 January 2025)
- ML17276B709 + (12:51:07, 8 January 2025)
- GO2-82-827, Forwards Dynamic Qualification Rept for Safety-Related Equipment, Vols I & Ii.Rept Will Be Incorporated Into FSAR Amend + (12:51:09, 8 January 2025)
- GO2-82-874, Forwards marked-up Section 8.3 to FSAR Amend 23,clarifying Electrical Separation Issues,Per 821006 Meeting.Changes Will Be Incorporated Into Future FSAR Amend + (12:51:12, 8 January 2025)
- ML17276B705 + (12:51:15, 8 January 2025)
- ML17276B701 + (12:51:17, 8 January 2025)
- ML17276B700 + (12:51:18, 8 January 2025)
- ML17276B699 + (12:51:20, 8 January 2025)
- GO2-82-865, Forwards Revision 1 to Plant Verification Rept, Dtd Oct 1982 + (12:51:21, 8 January 2025)
- GO2-82-864, Forwards Revision 1 to Plant Verification Rept, Dtd Oct 1982 + (12:51:25, 8 January 2025)
- ML17276B693 + (12:51:28, 8 January 2025)
- ML17276B690 + (12:51:30, 8 January 2025)
- GO2-82-839, Confirms 821005 Telcon Re Use of ASME Code Case N-310-1, Certification of Bolting Matls Section Iii,Div 1,Class 1, 2,3,MC & Cs. Util Will Implement Code Case as Agreed + (12:51:31, 8 January 2025)
- GO2-82-822, Advises That Section 14.2.14.3.17 Will Be Amended to Remove Any Ref to Containment Hot Pipe Penetration Testing.Ser Outstanding Issue 21 (NUREG-0892) Closed W/O Need for Acceptance Criteria.Diagrams Re Penetration Assembly Encl + (12:51:33, 8 January 2025)
- GO2-82-823, Informs That Hydrostatic Test of Diesel Engine Auxiliary Piping to 125% of Design Pressure Performed,In Response to Supplemental SER Item 9.5.4.1,Open Item 15 & FSAR Question 040.084.Exemption Requested for Intake & Exhaust Lines + (12:51:35, 8 January 2025)
- GO2-82-825, Forwards Recommendations on Proposed Plant Operating Procedure Changes,Equipmemt Mods & Discussion of Design Basis Ashfall.Advance Warning Arrangements in Section Ii.A. Fulfill Commitment Per Supplemental SER Section 2.5.1.3.1 + (12:51:38, 8 January 2025)
- ML17276B684 + (12:51:45, 8 January 2025)
- ML17276B683 + (12:51:47, 8 January 2025)
- ML17276B682 + (12:51:48, 8 January 2025)
- ML17276B680 + (12:51:49, 8 January 2025)
- ML17276B679 + (12:51:51, 8 January 2025)
- ML17276B678 + (12:51:52, 8 January 2025)
- ML17276B677 + (12:51:53, 8 January 2025)
- ML17276B676 + (12:51:54, 8 January 2025)
- ML17276B675 + (12:51:55, 8 January 2025)
- ML17276B674 + (12:51:56, 8 January 2025)
- ML17276B673 + (12:51:57, 8 January 2025)
- ML17276B672 + (12:51:58, 8 January 2025)
- ML17276B671 + (12:51:59, 8 January 2025)
- ML17276B670 + (12:52:00, 8 January 2025)
- ML17276B668 + (12:52:01, 8 January 2025)
- ML17276B669 + (12:52:01, 8 January 2025)
- ML17276B667 + (12:52:02, 8 January 2025)
- ML17276B666 + (12:52:03, 8 January 2025)
- ML17276B665 + (12:52:05, 8 January 2025)
- ML17276B664 + (12:52:06, 8 January 2025)
- GO2-82-836, Forwards Update to Pump & Valve Inservice Test Program Plan, Per Util 820708 ltr.W/21 Oversize Drawings.Aperture Cards Are Available in PDR + (12:52:07, 8 January 2025)
- ML17276B663 + (12:52:07, 8 January 2025)
- GO2-82-381, Forwards Test Rept 82-5-355B, Three-Hour Fire Endurance Tests on Thermo-Lag 330-1 Subliming Coating Envelope Sys for WPPSS Nuclear Projects. W/O Encl + (12:52:43, 8 January 2025)
- GO2-82-801, Provides Addl Info Re Preservice Insp Program Plan for Scram Discharge Sys Per 820812 Telcon.Boundary Diagram for Control Rod Drive Sys Encl + (12:53:02, 8 January 2025)
- ML17276B654 + (12:53:26, 8 January 2025)
- GO2-82-824, Forwards Supplemental Response to NUREG-0612, Control of Heavy Loads, Revision 1 to Close Out SER Outstanding Issue 30 + (12:53:27, 8 January 2025)
- ML17276B650 + (12:54:03, 8 January 2025)
- GO2-82-826, Submits Addl Info to Suppl Test Rept Data in Util 820802 & 0920 Ltrs to NRC Re Thermo-Lag 330-1,subliming Coating Envelope Sys (Itl Rept 82-5-355A) for Fire Protection of Cable Raceway Sys Discussed in App R + (12:54:04, 8 January 2025)
- GO2-82-793, Advises That Manual Block Valve CAS-VX-82e Will Be Utilized as Containment Isolation Valve in Lieu of Relocating Check Valve on Air Line to Inside Containment.Change Will Be Incorporated in Future FSAR Amend + (12:54:29, 8 January 2025)
- GO2-82-385, Forwards Revised Corrective Actions to NRC Notice of Violations 79-10/01,79-10/03,80-09/09 & 80-08/22 Noted in IE Insp Rept 50-397/81-22.All Future Liquid Penetrant Exams Will Be Performed by Bechtel Approved Subcontractor + (12:54:39, 8 January 2025)