Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277A537 + (12:46:13, 8 January 2025)
- ML17277A536 + (12:46:13, 8 January 2025)
- GO2-83-247, Forwards Plant Procedures 1.3.1,1.3.6,1.3.7,1.3.8,1.3.9 & 1.5.1 to Close Out SER (NUREG-0892) Confirmatory Issue 22, Assurance of ESF Functioning (II.K.1.5) & Safety-Related Sys Operability Status (II.K.1.10) + (12:46:14, 8 January 2025)
- ML17277A535 + (12:46:14, 8 January 2025)
- GO2-83-248, Forwards Emergency Operating Procedures Package,Consisting of Emergency Procedure guidelines,plant-specific Writers Guide for Emergency Procedures,Procedure Validation Program & Procedure Training Program,Per Generic Ltr 82-33 + (12:46:17, 8 January 2025)
- ML17277A532 + (12:46:17, 8 January 2025)
- GO2-83-244, Forwards Rewrite of FSAR Chapter 4,Sections 4.1 - 4.4 Re Reactor.Info Will Be Incorporated Into FSAR Amend 30 to Be Issued in June 1983 + (12:46:19, 8 January 2025)
- GO2-83-262, Informs That Recheck Confirmed Turbine Bldg Crane MT-CRA-1 Conformance W/All Seven Guidelines of NUREG-0612 + (12:46:21, 8 January 2025)
- GO2-83-263, Submits Plans for Temporary Deferral of Concrete Block Shielding Wall Const.Fsar Will Be Amended If Any Deferrals Become Deletions + (12:46:23, 8 January 2025)
- GO2-83-243, Forwards Fire Protection Safe Shutdown Analysis Per 821207 Telcon Discussion.Analysis Utilizes Automatic Depressurization Sys & RHR Loop B Not RCIC & Loop B to Achieve Shutdown.Specific FSAR Revs Being Prepared + (12:46:24, 8 January 2025)
- GO2-83-266, Forwards marked-up Pages Originally Submitted in Response to NRC Questions 031.139,031.140 & 031.141,closing Out SER Outstanding Issue 10 Re Standby Svc Water Instrumentation & Control Design + (12:46:26, 8 January 2025)
- GO2-83-249, Forwards Rev 1 to Reverification Instruction QVI-09, Special Structural Steel Reinsp Criteria. Instruction Describes Exceptions Taken to Aws D1.1 During Recent Insp of Structural Steel & Miscellaneous Metal Welds + (12:46:28, 8 January 2025)
- ML17277A523 + (12:46:28, 8 January 2025)
- GO2-83-264, Forwards GE Affidavit Indicating Reasons Why Util Re Fuel Rod Corrosion Measures Is Proprietary.Ge Re Fuel Rod Control Measures Encl + (12:46:30, 8 January 2025)
- GO2-83-260, Forwards Effect of Hydrodynamic Loads on Safety-Related Equipment & Piping Outside Containment, Technical Rept + (12:46:32, 8 January 2025)
- ML17277A513 + (12:46:32, 8 January 2025)
- ML17277A510 + (12:46:34, 8 January 2025)
- GO2-83-240, Forwards Draft ETS Re Instrumentation & Radioactive Effluents + (12:46:35, 8 January 2025)
- ML17277A503 + (12:46:37, 8 January 2025)
- GO2-83-203, Forwards Rewrite of FSAR Section 3.9, New Loads, Which Will Be Incorporated Into FSAR Amend 29 + (12:46:38, 8 January 2025)
- ML17277A499 + (12:46:39, 8 January 2025)
- GO2-83-228, Confirms Discussions W/Mechanical Engineering Branch Re Installation Sequence for Pipe Whip Restraint + (12:46:40, 8 January 2025)
- GO2-83-177, Forwards Emergency Plan Implementing Procedures.Epip 13.1.1, Classification of Emergency, Will Be Submitted by 830315. W/O Stated Encl + (12:46:42, 8 January 2025)
- ML17277A496 + (12:46:42, 8 January 2025)
- GO2-83-184, Forwards Info Presented at 830304 Meeting in Bethesda,Md Re Fire Hose/Standpipe Mod.Encl Info Provides Technical Basis for Acceptance of Current Manual Fire Suppression Sys Design + (12:46:44, 8 January 2025)
- GO2-83-211, Forwards Rept of Audit of WPPSS Plant Verification Program for Wa Nuclear Plant Unit 2 + (12:46:45, 8 January 2025)
- ML17277A489 + (12:46:47, 8 January 2025)
- ML17277A491 + (12:46:47, 8 January 2025)
- ML17277A486 + (12:46:48, 8 January 2025)
- ML17277A485 + (12:46:52, 8 January 2025)
- GO2-83-190, Provides Formal Notification Re Schedule for Operator Licensing Exams,Per 830111 Generic Ltr 83-01 + (12:46:53, 8 January 2025)
- ML17277A482 + (12:46:54, 8 January 2025)
- IR 05000397/1983006 + (12:46:55, 8 January 2025)
- GO2-83-169, Discusses Fire Hose & Standpipe Mods.Meeting Scheduled for 830304 Will Present Position That Current Sys Provides Fully Satisfactory Implementation of App R Requirements + (12:46:57, 8 January 2025)
- ML17277A479 + (12:46:57, 8 January 2025)
- GO2-83-175, Advises That Rev to FSAR Chapter 11,Section 11.4, Utilization of Interim Portable Solid Radwaste Solidification Sys, Will Be Submitted After Fuel Load + (12:47:00, 8 January 2025)
- GO2-83-164, Responds to NRC Question 010.068 Re Secondary Missile Generation Resulting from Spalling & Scabbing of Concrete Walls & Barriers Upon Impact by Credible Plant Missiles. Survey Indicates No Secondary Missiles Can Be Generated + (12:47:04, 8 January 2025)
- GO2-83-166, Submits Changes to 821004 Submittal of Rev 1 to Control of Heavy Loads. Safe Load Path for Cattle Chute Will Be Shown in Plant Procedure 10.3.5 + (12:47:06, 8 January 2025)
- GO2-83-167, Commits to Modifying Design Such That Motor Operated Valves at Standby Svc Water Pumphouse Are Directly Connected to Motor Control Ctr in Radwaste Bldg Per NUREG-0892,SER Outstanding Issue 10 + (12:47:08, 8 January 2025)
- ML17277A472 + (12:47:11, 8 January 2025)
- GO2-83-142, Forwards Amend 28 to FSAR + (12:47:12, 8 January 2025)
- ML17277A471 + (12:47:12, 8 January 2025)
- ML17277A467 + (12:47:14, 8 January 2025)
- ML17277A465 + (12:47:14, 8 January 2025)
- GO2-83-090, Forwards Applicability of Use of Square-Root-of-Sum-of- Square (Srss) Method for Combining Peak Dynamic Responses for Wa Nuclear Plant 2, Per .Rept Satisfies NUREG-0892 SER Confirmatory Item 6 + (12:47:15, 8 January 2025)
- GO2-83-170, Forwards Supporting Documentation & Response to NRC 820916 Request for Addl Info & NUREG-0892 SER Outstanding Issue 26, Operability of Purge Valves. Submittal Also Confirms Discussions W/R Auluck During Pvort Audit in Nov 1982 + (12:47:16, 8 January 2025)
- GO2-83-089, Transmits Preservice Insp Drawings for Scram Discharge Piping Per NRC Request.Boundary Diagram & Supply Sys Exam Requirements for Piping Forwarded by + (12:47:18, 8 January 2025)
- ML17277A460 + (12:47:21, 8 January 2025)
- ML17277A459 + (12:47:22, 8 January 2025)
- GO2-83-140, Requests Written Confirmation of Telcon W/Rh Nelson,R Auluck & R Giardina That Backfitting of Diesel Generators W/Air Dryers by First Refueling Outage Acceptable + (12:47:23, 8 January 2025)
- ML17277A458 + (12:47:23, 8 January 2025)
- ML17277A456 + (12:47:25, 8 January 2025)