Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17277A777 + (12:31:06, 8 January 2025)
- ML17277A776 + (12:31:08, 8 January 2025)
- GO2-83-732, Forwards Info Describing Actions Taken to Resolve Const Issues Identified in IE Insp Rept 50-397/83-29,per 830715 Submittal.Schedules for Completion & Status of Programs Addressing Broad Issues Also Encl + (12:31:09, 8 January 2025)
- GO2-83-765, Advises That as of 830708,applicable Personnel Have Attended & Completed Mitigating Core Damage Training Classes or Equivalent,Per TMI Action Item II.B.4 & SER Confirmatory Item 21 Responses + (12:31:12, 8 January 2025)
- GO2-83-756, Advises That Jet Pump Holddown Beams Retensioned,Per 801204 Commitment & Section 3.9.5 of SER (NUREG-0892).Daily Jet Pump Operability Surveillance Testing & Periodic Insps Provide Addl Assurance of Proper Operation + (12:31:15, 8 January 2025)
- GO2-83-764, Confirms 830812 Telcon W/R Auluck Re Change in Current Projected Fuel Load of Early Nov 1983.Meeting W/Nrc Mgt to Discuss Fuel Load & Other Issues Requested + (12:31:18, 8 January 2025)
- GO2-83-748, Forwards Radwaste Bldg Ventilation Exhaust Flow Measurement Description in Response to Questions During Radiological Effluent Tech Spec Discussions + (12:32:03, 8 January 2025)
- ML17277A766 + (12:32:52, 8 January 2025)
- GO2-83-724, Advises That SER (NUREG-0892) Confirmatory Issue 22 Re TMI Items II.K.1.5, ESF Functioning & II.K.1.10, Safety- Related Sys Operability Status, Will Remain Open Until Corrective Actions Completed + (12:32:53, 8 January 2025)
- GO2-83-710, Responds to SER Licensing Condition 4 Re Inadequate Core Cooling (TMI Item II.F.2).Util Will Provide plant-unique Response Following Review of NRC Evaluation of BWR Owners Group Program.Resolution Should Not Affect Fuel Loading + (12:32:58, 8 January 2025)
- GO2-83-726, Closes SER (NUREG-0892) Confirmatory Issue 14,modifying RCIC Pipe Break Detection Circuitry Sys to Prevent Spurious Isolation of RCIC Sys.Changes Will Be Incorporated Into Next FSAR Amend + (12:33:02, 8 January 2025)
- ML17277A749 + (12:33:07, 8 January 2025)
- GO2-83-704, Forwards Proposed Environ Protection Plan for Nonradiological Programs + (12:33:08, 8 January 2025)
- ML17277A746 + (12:33:10, 8 January 2025)
- ML17277A740 + (12:33:11, 8 January 2025)
- GO2-83-705, Forwards Revised FSAR Figures Documenting Analyses of SER Confirmatory Issue 1 Re Final Pipe Break Locations & Design of Pipe Whip Restraints.Final Break Locations Based on Completion of as-built Programs & Final Stress Analysis + (12:33:12, 8 January 2025)
- GO2-83-580, Resubmits Amend 30 to FSAR Due to Printer Collation Problem + (12:33:14, 8 January 2025)
- GO2-83-696, Forwards Rev 1 to 830713 Response to NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Procedures for Moving Three Lower dryer-separator Storage Pool Step Plugs Revised to Specify Max Lifting Height + (12:33:16, 8 January 2025)
- GO2-83-684, Forwards Equipment Environ Qualification Files 018008, 256016,207002,207004 & 221001 Requested by a Masciantonio, for Review.W/O Encl + (12:33:22, 8 January 2025)
- GO2-83-693, Proposes to Replace Source Range Monitors at First Refueling,Per Reg Guide 1.97,to Allow Time to Complete & Qualify Replacement & Accommodate Replacement Into Plant Design,Maint & Operating Procedures + (12:33:24, 8 January 2025)
- ML17277A702 + (12:33:26, 8 January 2025)
- ML17277A696 + (12:33:27, 8 January 2025)
- ML17277A694 + (12:33:28, 8 January 2025)
- ML17277A693 + (12:33:29, 8 January 2025)
- GO2-83-629, Forwards River Seismic Reflection Survey, Detailing Acquisition,Processing & Analysis of Marine Seismic Reflection Line Along Columbia River,Per 820629 Request for Supplemental Geology/Seismology SER Input + (12:33:30, 8 January 2025)
- GO2-83-660, Advises That BWR Owners Group Option 2 Will Be Implemented Per SER (NUREG-0892) Outstanding Issue 1.7(9), Mods to Automatic Depressurization Sys Logic. Reliance on RCIC Sys as HPCS Backup for Selected Accidents Eliminated + (12:33:32, 8 January 2025)
- GO2-83-662, Forwards Listing of Preoperational & Acceptance Tests to Be Completed Past Fuel Load as Discussed at Caseload Forecast Panel 830712-14 Meetings.Completion of Tests Will Not Compromise Safety of Fuel Load & Startup Activities + (12:33:34, 8 January 2025)
- GO2-83-675, Forwards Response to NRC Request for Addl Info Re Procedures Generation Package + (12:33:36, 8 January 2025)
- GO2-83-661, Forwards Table 3.9-2b, Reactor Internals & Associated Equipment, to Be Submitted in Amend 32 to Fsar.Ser Confirmatory Issues 9 & 10 Closed + (12:33:37, 8 January 2025)
- GO2-83-648, Requests That Official Correspondence Be Sent to DW Mazur + (12:33:39, 8 January 2025)
- GO2-83-650, Informs of Electrical Safety Features Incorporated Into Design & Maint of Reactor Bldg Crane + (12:33:41, 8 January 2025)
- GO2-83-596, Forwards Rept on Safety Parameter Display Sys Safety Analysis,Per 830415 Commitment & Response to Generic Ltr 82-33,Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability + (12:33:43, 8 January 2025)
- GO2-83-631, Forwards List of Dates for Issuance & Expiration of Permits & Permit Numbers Per E Chan Telcon Request for Status of Various Permits & Licenses Noted in Table 12.1-1 of Environ Rept + (12:33:44, 8 January 2025)
- GO2-83-636, Requests Relief from SER License Condition 8 Requiring Completion Due Date for Relocation of Instrument Panel from HPCS Diesel Generator Skid,Per 830616 Telcon.Completion Prior to Startup After First Refueling Outage Requested + (12:33:46, 8 January 2025)
- ML17277A665 + (12:33:48, 8 January 2025)
- GO2-83-614, Forwards Response to Phase II of NUREG-0612, Control of Heavy Loads at Nuclear Power Plants. Items Discussed Include Step Plugs,Vessel Cavity Plugs,Dryer Separator Pool Step Plugs,Fueling Slot Plugs & Auxiliary Hoist + (12:33:49, 8 January 2025)
- ML17277A663 + (12:33:51, 8 January 2025)
- ML17277A662 + (12:33:51, 8 January 2025)
- ML17277A661 + (12:33:52, 8 January 2025)
- ML17277A659 + (12:33:53, 8 January 2025)
- NL-17-1646, Snubber Program Plan for the Fourth Ten Year Inservice Testing Interval + (12:33:54, 8 January 2025)
- GO2-83-611, Forwards Proposed Snubber Tech Spec for Review as Followup to 830314 & 0624 Telcons.Changes Will Not Lessen Assurance of Structural Integrity & Functionality of safety-related Sys.Fuel Load Scheduled for Sept 1983 + (12:33:55, 8 January 2025)
- GO2-83-606, Revises Re GDC 51,based on Discussions & Agreements Reached at 830616 Meeting.Encl Provides Lowest Svc Metal Temp Values Superseding Values Previously Provided + (12:33:57, 8 January 2025)
- GO2-83-602, Informs That D Mazur Appointed New Managing Director, Effective 830516 + (12:34:28, 8 January 2025)
- GO2-83-597, Responds to Fire Protection Site Audit Concerns Noted in 830413 Trip Rept.Corrective Actions:Fire Detectors Installed,Instrument Racks Will Be Encl W/Concrete & Use of Automatic Sprinkler Sys Reevaluated + (12:34:57, 8 January 2025)
- GO2-83-550, Forwards WPPSS 2 Purge & Vent Valves Seismic & Hydrodynamic Analysis, Per SER Outstanding Issue 26 + (12:35:03, 8 January 2025)
- ML17277A643 + (12:35:26, 8 January 2025)
- GO2-83-584, Responds to NRC Request for Addl Info Re SER Confirmatory Issue 7, Component Supports. Results of Evaluation in Phase II Indicate That 175 Supports & 16 Anchors Acceptable + (12:35:28, 8 January 2025)
- ML17277A640 + (12:36:04, 8 January 2025)
- GO2-83-590, Forwards Revised Vols 1-3 to Environ Equipment Qualification Rept for Safety-Related Equipment. Rev Provides Response to Concerns Raised in Suppl 3 to SER (NUREG-0892) + (12:36:05, 8 January 2025)
- GO2-83-552, Responds to SER Suppl 2 (NUREG-0892) & TMI Action Item II.K.3.28 Re Surveillance Requirements to Ensure Operability of back-up Air Supply Sys.Requirement on Calibr of Bottle Gauges Contested & Not Included in Tech Specs + (12:36:43, 8 January 2025)