ML17277A776

From kanterella
Jump to navigation Jump to search
Forwards FEMA Final Rept, 1983 Supply Sys WPPSS Nuclear Plant 2 Exercise on 830601. Deficiencies Should Be Corrected by Sept 1983
ML17277A776
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/19/1983
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
References
NUDOCS 8308310545
Download: ML17277A776 (4)


Text

'/

Al}6' S

1983 Docket No.:

50-397 Hr.

D. Hazur Managing Director Washington Public Power Supply System P. 0, Box 968 3000 George Washington Way

.Dichland, Washington 99352

Dear Hr. f4azur:

DISTRIBUTION:

Document Control'RC PDR Local PDR NSIC PRC LB82 File EHylton RAuluck

ELJordan, DE(A:IE
JHTaylor, DRP:IE
Paton, OELD Region V

ACRS (16)

Subject:

FEHA RX/RAC Critique - 1983 WNP-2 Joint Exercise on Offsite Plans and Preparedness Attached is a copy of the FEHA's final report on the June 1, 1983, joint exe'reise and a'n interim finding on WNP-2 offsi,te plans

& preparedness.

The report represents the findings of FEHA Region X and the Regional Assistance Committee.

The report further addresses the three deficieni ies related to Alert and No'tiki,'cation (A&N), public brochures, and the public education program.

As stated in the report, these) deficiencies should be corrected by September 1983,,-

'iiith the exception that final approval of A&N must

'a'wait development and application of the FEHA A&N test.

Please contact Raj Auluck, Licensing Project Manager at (301) 492-8547, if you desire any discuss.ion or clar ification of the enclosed report.

Sincerely, io WoaX aiguca by:

P PgrlL%>

A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing

Enclosure:

As stated cc:

See next"page-.-

83083i0545 8308i7 PDR ADOCK 050003'817 F

PDR I

OFFICEIF SURNAME/

DATE0 DL:

B /

ck:p

.N.i /.83........

DL:

BC

~ ~ ~ ~ ~ ~

~ ~

Sch encer NRC FORM 318 (10.80) NRCM 0240 OFFICIAL RECORD COPY USQ PO: 1881~880

'7t

WNP-2 Mr. D. Mazur Managing Director Washington Public Power Supply System P. 0. Box 968 3000 George Washington Way Richland, Washington 99352 CC:

Nicholas Reynolds, Esquire Debevoise 8 Liberman 1200 Seventeenth

Street, N.

W.

Washington, D. C.

20036 Mr. G. E. Doupe, Esquire Washington Public Power Supply System P.O.

Box 968 3000 George Washington.Way

Richland, Washington 99352 Nicholas Lewis, Chairman Energy Facility Site Evaluation Council Mail Stop PY-ll Olympia, Washington 98504 Roger Nelson, Licensing Manager Washington Public Power Supply System P.O.

Box 968

Richland, Washington 99352 Mr. W. G. Conn, Sr.

N/M Group Supervisor Burns and Roe, Incorporated 601 Williams Boulevard

Richland, Washington 99352 Mr. Richard Feil U.S.

NRC Resident Inspector WPPSS-2 NPS P.O.

Box 69

Richland, Washington 99352 Dr. G. D. Bouchey, Manager Nuclear Safety h Regulatory Programs Washington Public Power Supply System P.O.

Box 968, MD 650

Richland, Wa'shington

~ 99352

0

~ J'

~ '

I