Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000397/1989012 + (10:56:56, 8 January 2025)
- ML17285A508 + (10:56:57, 8 January 2025)
- GO2-89-103, Forwards Addl Info Re Insp Rept 50-397/86-12 Concerning Equipment Qualification of Limitorque Motor Operators Toward Resolution of Remaining Open Item on Subj Audit.Grease Relief Valve Test Data & T-drain Technical Analysis Encl + (10:56:58, 8 January 2025)
- GO2-89-102, Suppls 890303 & 0420 Applications for Amend to Tech Specs Re Reload Requirements for (Cycle 5).Figures 3.2.1-6,3.2.3-1, 3.2.4-2 & 3.2.4-3 Encl + (10:56:59, 8 January 2025)
- GO2-89-104, Part 21 Rept Re Defect Discovered in Valve Motor Operator of RCIC Inboard Containment Isolation Valve RCIC-V-63.Upper Housing Cover Will Be Machined to Remove Excess Matl to Provide Required Recess + (10:57:00, 8 January 2025)
- GO2-89-098, Requests That 21 Addl Days Be Granted for Response to Generic Ltr 89-08, Erosion/Corrosion-Induced Pipe Wall Thining, Due to Util Not Receiving Ltr Until 890523 + (10:57:02, 8 January 2025)
- GO2-89-097, Advises That No Tech Spec Change to Table 3.12-1 Re Location of Direct Radiation Station Necessary Per Review of Amend 6 to Offsite Dose Calculation Manual + (10:57:03, 8 January 2025)
- 05000397/LER-1989-014, :on 890509,full Reactor Protection Sys Actuation Occurred.Caused by Accidental Movement of Local Power Range Monitor Cables.Scram Reset & Importance of Tying Cables Away from Working Area Stressed + (10:57:05, 8 January 2025)
- ML17285A492 + (10:57:09, 8 January 2025)
- GO2-89-081, Forwards Status Rept for Apr 1989 in Response to Generic Ltr 88-14 Instrument Air Supply Sys Problems Affecting Safety-Related Equipment. W/Six Oversize Drawings + (10:57:10, 8 January 2025)
- GO2-89-096, Requests Addl 30 Days for Responding to Generic Ltr 89-06. Response Would Be Due to NRC by 890810.Ltr Not Received Until 890512 + (10:57:12, 8 January 2025)
- GO2-89-092, Forwards Info Re Implementation of Improvement Programs in Each of Functional Areas Reviewed by NRC in 1988 SALP Rept & Summary of Accomplishments & Status of All Commitments from Util 880917 Response to Subj Rept,Per 890105 Meeting + (10:57:14, 8 January 2025)
- 05000397/LER-1989-008, :on 890419,discovered That on 881202,Tech Spec Amend Request Submitted to NRC Describing Diesel Generator Trip Bypass Verification That Had Not Been Performed W/Ler Not Issued within 30 Days After Determination + (10:57:16, 8 January 2025)
- ML17285A483 + (10:57:17, 8 January 2025)
- TAC:63934 + (10:57:18, 8 January 2025)
- ML17285A480 + (10:57:19, 8 January 2025)
- ML17285A482 + (10:57:19, 8 January 2025)
- ML17285A479 + (10:57:20, 8 January 2025)
- GO2-89-089, Forwards Update of Status Sheets Used to Track Items/Issues Identified During Mar & Apr 1989 NRC SSOMI at Plant.Items Include 125-volt Dc Battery Life Calculations & Change from Automatic to Manual Intake Valve Operation in Control Room + (10:57:21, 8 January 2025)
- GO2-89-095, Part 21 Rept Re Defects in Target Rock Actuator Kits (Part 300562-1).Initially Reported on 890516.Defects Noted in Cold Solder Condition,Insufficient Solder Joints & Failed Solder Joints.Defective Kits Returned to Mfg for Repair + (10:57:22, 8 January 2025)
- ML17285A474 + (10:57:24, 8 January 2025)
- TAC:69299 + (10:57:24, 8 January 2025)
- GO2-89-087, Suppls Response to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:All Associated Master Data Sheets Revised + (10:57:25, 8 January 2025)
- ML17285A472 + (10:57:25, 8 January 2025)
- ML17285A470 + (10:57:27, 8 January 2025)
- ML17285A468 + (10:57:28, 8 January 2025)
- ML17285A467 + (10:57:29, 8 January 2025)
- ML17285A466 + (10:57:29, 8 January 2025)
- ML17285A465 + (10:57:30, 8 January 2025)
- ML17285A463 + (10:57:31, 8 January 2025)
- ML17285A460 + (10:57:32, 8 January 2025)
- ML17285A462 + (10:57:32, 8 January 2025)
- ML17285A457 + (10:57:33, 8 January 2025)
- ML17285A459 + (10:57:33, 8 January 2025)
- ML17285A455 + (10:57:34, 8 January 2025)
- 05000397/LER-1988-030-01, Forwards LER 88-030-01.Rept Submitted Per Commitment in Response to Violation B Noted in Insp Rept 50-397/88-24 + (10:57:35, 8 January 2025)
- ML17285A449 + (10:57:36, 8 January 2025)
- GO2-89-074, Radiological Environ Monitoring Program 1988 Annual Rept for Nuclear Plant 2 + (10:57:37, 8 January 2025)
- ML17285A447 + (10:57:38, 8 January 2025)
- ML17285A445 + (10:57:39, 8 January 2025)
- ML17285A438 + (10:57:40, 8 January 2025)
- 05000397/LER-1988-030, :on 880825 & 26,full Reactor Protection Sys (RPS) Actuations Occurred.Caused by Switch Overtravel.Rps Power Supply Select Switch Returned to Normal Position & Scram Reset + (10:57:43, 8 January 2025)
- GO2-89-070, Part 21 Rept Re Defect in Limitorque Valve Motor Operator Model SMB-2 W/Soft Worm Shaft Clutch Gear Assembly.Caused by Failure to Install Split Spacer of Worm Shaft Clutch Gear assembly.Safety-related Valves Manually Operated + (10:57:44, 8 January 2025)
- GO2-89-069, Forwards Application to Amend License NPF-21,authorizing Onsite Disposal of Very Low Level Radwaste by Burying Eight Moisture Separator Reheater Tube Bundles W/Associated Assemblies & Four Small Spools of Piping + (10:57:46, 8 January 2025)
- GO2-89-072, Supply Sys Nuclear Plant 2 Annual Environ Operating Rept 1988 + (10:57:47, 8 January 2025)
- ML17285A427 + (10:57:49, 8 January 2025)
- 05000397/LER-1989-009, :on 880529,full Reactor Protection Sys Actuation Occurred Twice During Performance Testing.Caused by Inadequate Preoperational Test & trouble-shooting Procedures.Preoperational Procedure Revised + (10:57:50, 8 January 2025)
- IR 05000397/1989008 + (10:57:54, 8 January 2025)
- ML17285A421 + (10:57:55, 8 January 2025)
- IR 05000397/1989010 + (10:57:56, 8 January 2025)
- ML17285A418 + (10:57:57, 8 January 2025)