Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17290A449 + (10:12:58, 8 January 2025)
- GO2-93-158, Monthly Operating Rept for May 1993 for WNP-2 + (10:12:59, 8 January 2025)
- ML17290A448 + (10:12:59, 8 January 2025)
- 05000397/LER-1993-020, :on 930511,MSRV Position Indicators Not Tested Per TS Requirements Due to Poor Procedures,Inconsistency of Three Specs Re MSRVs & TS 3/4.3.7.5 for MSRV Acoustic Monitors Not Met at Required Times + (10:13:01, 8 January 2025)
- ML17290A445 + (10:13:02, 8 January 2025)
- 05000397/LER-1993-021, :on 930514,discovered Potential for Water Accumulation in CAC Sys.Due to Inadequate Original Analysis of Sys Design.Drains Installed in Lowest Elevations of CAC Sys Piping + (10:13:03, 8 January 2025)
- ML17290A442 + (10:13:04, 8 January 2025)
- 05000397/LER-1990-017, :on 900830,31,0906,17 & 18,HPCS Sys Inoperable as Result of 125-volt Dc Battery Inoperability.Caused by Functional Design Deficiency.Mod Planned to Battery Racks & Encls.Also Reported Per Part 21 by Limitorque + (10:13:05, 8 January 2025)
- 05000397/LER-1993-008, :on 930211,determined That Logic Sys Functional Test Requirements for Emergency Bus Undervoltage Logic Not Fully Implemented.Caused by Inadequate Procedures.New Procedures Developed + (10:13:07, 8 January 2025)
- GO2-93-144, Discusses Info on Evaluation of Lost Part in Rv Covering CR Interference,Corrosion or Adverse Chemical Reaction W/ Other Reactor Matls,Blocked Flow to Fuel Bundle & Subsequent Overheating of Cladding & Fretting Wear + (10:13:08, 8 January 2025)
- ML17290A437 + (10:13:10, 8 January 2025)
- 05000397/LER-1993-007, :on 930210,low RPV Level Reactor Scram Initiated by RPS in Response to Actual Low Water Level Condition.Caused by Connector Pin Corrosion.Suppression Pool Level Lowered + (10:13:12, 8 January 2025)
- GO2-93-108, Forwards COLR 93-9,Rev 0, WNP-2,Cycle 9 COLR, Per TS 6.9.3.4 & 930510 Application for Amend to Stability & Power/ Flow Sections of TS + (10:13:13, 8 January 2025)
- GO2-93-142, Responds to NRC Bulletin 93-002, Debris Plugging of ECC Suction Strainers. None of Suspect Matl Used in Facility Primary Containment + (10:13:15, 8 January 2025)
- 05000397/LER-1993-019, :on 930510,ESF Isolations & Actuations Occurred Due to 500 Kv Load Break Disconnect Failure. RHR Loop a Shutdown Cooling Restored & Plant Sys Returned to Normal Lineup Status + (10:13:17, 8 January 2025)
- 05000397/LER-1991-017, :on 910708,EDGs Automatically Started While on Backfeed Due to Undervoltage Condition,Initiated by 500 Kv Grid Disturbance.Caused by Personnel Error.Returned Unit to Startup Power Source + (10:13:19, 8 January 2025)
- 05000397/LER-1988-005, :on 880208,determined That CR Emergency Filtration Sys,Train B Bypass Flow Greater than TS Limit of 0.05 Gpm from 870923-880120.Caused by Installation Deficiency.Flow Restrictor Installed + (10:13:21, 8 January 2025)
- ML17290A429 + (10:13:22, 8 January 2025)
- ML17290A426 + (10:13:23, 8 January 2025)
- ML17290A425 + (10:13:24, 8 January 2025)
- GO2-93-002, Forwards Draft Copy of Scenario Package for Util 1993 NRC Graded Exercise to Be Conducted on 930222-23 & Revised Objectives & Limitations for Feb Exercise,Per 930104 Discussions W/Nrc.W/O Encls + (10:13:28, 8 January 2025)
- ML17290A422 + (10:13:28, 8 January 2025)
- GO2-93-143, Responds to NRC Bulletin 93-003.Both Procedure Instructions & Installed Interlocks Preclude Simultaneous Opening of Valves in RHR Lines That Could Lead to RPV Drain Down Event While Shutdown + (10:13:30, 8 January 2025)
- GO2-93-018, Forwards 1993 Exercise Scenario Package to Be Conducted on 930222-23.W/o Encls + (10:13:32, 8 January 2025)
- IR 05000397/1993008 + (10:13:32, 8 January 2025)
- GO2-93-125, Forwards Response to NRC Transmitting SALP Rept 50-397/93-04 for Jan 1992 Through Feb 1993.Mgt Attention to Emergency Preparedness Effort Increased by Including Lead Ctr Directors in Resolving Problems & Making Changes + (10:13:34, 8 January 2025)
- GO2-93-135, Requests That All NRC Correspondence to Util Be Directed to Jv Parrish.Change Will Provide Util W/Single Point of Contact for All Official Correspondence at Executive Level. Requested Svc List Encl + (10:13:36, 8 January 2025)
- GO2-93-131, Application for Amend to License NPF-21,changing TS 6.0, Adminstrative Controls to Clearly Assign Corporate Responsibility for Overall Plant Nuclear Safety,Including Review & Audit Functions + (10:13:38, 8 January 2025)
- ML17290A402 + (10:13:38, 8 January 2025)
- GO2-93-127, Forwards Amend 1 Vols 1-3 of ISI Program Plan for First Insp Interval + (10:13:40, 8 January 2025)
- GO2-93-117, Comments on Proposed Insp Procedure 38703, Commercial Grade Procurement Insp + (10:13:41, 8 January 2025)
- ML17290A389 + (10:13:42, 8 January 2025)
- GO2-93-124, Forwards Rev 16 to WPPSS-QA-004, Operational QA Program Description + (10:13:43, 8 January 2025)
- GO2-93-116, Provides Revised Completion Date for Installation of Adjustable Speed Drives (ASD) in Rrs.Current Plans Are to Installed ASDs During R-11 Annual Maint & Refueling Outage (Currently Scheduled for Spring 1996) + (10:13:44, 8 January 2025)
- ML17290A383 + (10:13:46, 8 January 2025)
- GO2-93-119, Forwards GE Rept R-R8-111 Re Flaw in Reactor Bldg Piping. Review of Program Output for Fatigue Analysis & IGSCC Fracture Mechanics Showed Current Crack Size Well within Limit of Util Evaluation.Indication Will Be Monitored + (10:13:47, 8 January 2025)
- TAC:M80358 + (10:13:47, 8 January 2025)
- GO2-93-123, Describes Alternate Schedule for IGSCC Insps,Per GL 88-01. All Required Insps of Category D Welds Will Be Completed within Required 3-yr Interval.All Welds Inspected During Refueling Outage 7 & No Indications Noted + (10:13:49, 8 January 2025)
- TAC:M84714 + (10:13:49, 8 January 2025)
- 05000397/LER-1993-018, :on 930428,discovered Design Condition That Could Have Impacted Plants Ability to Mitigate Accident Conditions.Caused by Less than Adequate Change Mgt.Abnormal Operating Procedures Will Be Revised + (10:13:52, 8 January 2025)
- ML17290A378 + (10:13:54, 8 January 2025)
- ML17290A377 + (10:13:55, 8 January 2025)
- GO2-93-128, Forwards Revised Relief Request RP-9 to Permit Use of Ref Curve for Testing Specific Pumps (Rhr,Hpcs,Lpcs & RCIC) Instead of Fixed Ref Point + (10:13:56, 8 January 2025)
- TAC:M60493 + (10:13:56, 8 January 2025)
- ML17290A371 + (10:13:59, 8 January 2025)
- WO 17-0065, Submittal of LER 17-S01-00 for Wolf Creek Nuclear Operating Corp., Regarding Contraband Introduced Into the Protected Area Boundary + (10:14:00, 8 January 2025)
- ML17290A369 + (10:14:01, 8 January 2025)
- IR 05000397/1992043 + (10:14:02, 8 January 2025)
- IR 05000397/1993017 + (10:14:04, 8 January 2025)
- NL-17-134, Radiation Monitor R-26 Inoperable + (10:14:06, 8 January 2025)
- ML17290A359 + (10:14:07, 8 January 2025)