ML17290A448

From kanterella
Jump to navigation Jump to search
Notification of Significant Meeting W/Util on 930321 in Walnut Creek,Ca.Enforcement Conference Re Suppression Pool Bypass Leakage (EA 93-134) & Falsified Fire Tour Logs (EA 93-135)
ML17290A448
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 06/09/1993
From: Perkins K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
EA-93-134, EA-93-135, NUDOCS 9306220033
Download: ML17290A448 (3)


Text

~p,Q AEQUI~ tp O~

Cy A

I nO I

,{r, Vl9 IP +a*++

UNITED STATES NUCLEAR REGULATORYCOMMISSION REGION V 1450 MARIALANE WALNUTCREEK, CAUFORNIA94596-5368 JUN -.8 F993 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Name of Faci l ity:

Docket Number:

Date and Time of Heeting:

Location of Heeting:

Purpose of Meeting NRC Attendees:

Licensee Attendees:

Washington Public Power Supply System Washington Nuc'Iear Project No.

2 (WNP-2) 50-397 June 21,

1993, 1:00 p.m.

Region V Office, Walnut Creek, California Enforcement Conference Regarding Suppression Pool Bypass Leakage (EA 93-134) and Falsified Fire Tour Logs (EA 93-135)

B. H. Faulkenberry, Regional Administrator, RV K. E. Perkins, Director, Division of Reactor Safety and Projects C. A. VanDenburgh, Chief, Reactor Projects Branch T.

R. quay, Director, Project Directorate V

H.

B. Blume, Regional Attorney F.

R. Huey, Enforcement Officer L. F. Hiller, Chief, Reactor Safety Branch P.

H. Johnson, Chief, Reactor Projects Section 1

J.

W. Clifford, NRR Project Hanager R. C. Barr, Senior Resident Inspector D. E. Corporandy, Project Inspector J.

V. Parrish, Assistant Hanaging Director for Operations J.

W. Baker, WNP-2 Plant Hanager G. C. Sorensen, Regulatory Programs Hanager W. D. Shaeffer,

Hanager, Operations J. J. Huth, Principal
Engineer, Operating Event Analysis and Resolution 9306220033 930609..

PDR ADOCK 05000397 P

PDR

/(p(

Note:

Attendance at this meeting by NRC personnel other than those listed above should be made known by June 18, 1:00 p.m. via a telephone call to P. Johnson, (510) 975-0300.

Distribution:

Approved by:

K. E. Perkins, Director Division of Reactor Safety and Projects NRC Participants Listed Above J. Taylor, EDO J. Sniezek, EDO T. Hurley, NRR E. Jordan, AEOD J.

Lieberman, OE J. Partlow, NRR W. Russell, NRR J.

Roe, NRR E. Adensam, NRR J. Hitchell, OEDO L. Chandler, OGC L. Plisco, NRR/LPEB G. Cook, RV D. Kunihiro,.RV CC:

Hr. J.

W. Baker, WNP-2 Plant Hanager G.

E.

C. Doupe, Esq.,

WPPSS Hr. Warren A. Bishop,

Chairman, Energy Facility Site Evaluation Council Hr. Alan G. Hosier, Licensing Hanager, WPPSS Hr.

G.

C. Sorensen, Regulator Programs

Hanager, MPPSS Hr. J.

V. Parrish, Assistant Managing Director for Operations, WPPSS Hr. James C. Gearhart, Director, guality Assurance, WPPSS

Chairman, Benton County Board of Commissioners H. H. Phi lips, Esq.,

Winston E Strawn

bcc:

Docket Files Project Inspector N. Smith J. Bianchi J. Zollicoffer REGIO V

KJo n ton 6/g/

3 PJ sn 6/g /

CVa gh KPe ins 6/Q/ 3 6

/93 Eg EST COPY g

ST COPY EST COPY REVUE T COPY YES NO ES NO YES NO YES NO TO PDR YES NO File location:

GYPS INW2NENFHTG.KEJ

'