Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-97-219, Application for Amend to License NPF-21,modifying Min Critical Power Ratio Safety Limits by 980515 to Allow Continued Power Operation at WNP-2 Following Restart from R-13 Refueling Outage + (09:17:05, 8 January 2025)
- IR 05000397/1997017 + (09:17:10, 8 January 2025)
- ML17292B127 + (09:17:11, 8 January 2025)
- ML17292B126 + (09:17:12, 8 January 2025)
- ML17292B124 + (09:17:14, 8 January 2025)
- ML17292B123 + (09:17:15, 8 January 2025)
- ML17292B122 + (09:17:16, 8 January 2025)
- GO2-97-215, Forwards Evaluation of Effect of Revised Safety Limit on Past Operations at WNP-2,in Response to Unresolved Items in Insp Rept 50-397/97-11 + (09:17:17, 8 January 2025)
- ML17292B121 + (09:17:17, 8 January 2025)
- GO2-97-211, Informs That Util Intends to Implement Rev 26 to Operational QA Program Description,Including Clarifications Requested by NRC to App Iii.Description of Clarifications & Paragraphs Modified,Per Agreement Encl + (09:17:19, 8 January 2025)
- GO2-97-210, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-16 on 970815.Corrective Actions:Additional Training for Operations Personnel Will Be Given to Review Requirements of TS Surveillance Interval + (09:17:20, 8 January 2025)
- ML17292B117 + (09:17:25, 8 January 2025)
- ML17292B116 + (09:17:25, 8 January 2025)
- 05000397/LER-1997-010, :on 970906,discovered That TS SR 3.4.5.1 for Identified Portion of RCS Total Leakage Would Not Be Able to Perform within Time Limits of SR 3.0.2.Caused by Inadequate Methods.Method of Meeting SR 3.4.5.1 Established + (09:17:26, 8 January 2025)
- TAC:M96886 + (09:17:28, 8 January 2025)
- ML17292B112 + (09:17:28, 8 January 2025)
- 05000397/LER-1997-011, :on 971010,HPCS Battery Charger Failed.Caused by Failure of a Phase Firing Control Circuit Board Due to Aging During 7 Yrs of Use.Hpcs Sys Was Immediately Declared Inoperable + (09:17:29, 8 January 2025)
- GO2-97-205, Monthly Operating Rept for Oct 1997 for WNP-2 + (09:17:30, 8 January 2025)
- GO2-97-202, Informs That Util Will Not Be Able to Provide Response for Staff to Maintain Review Schedule within 30-day Time Period. Info Will Be Provided on or Before 971205 + (09:17:31, 8 January 2025)
- GO2-97-201, Submits 30-day Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (09:17:33, 8 January 2025)
- ML17292B108 + (09:17:33, 8 January 2025)
- ML17292B103 + (09:17:35, 8 January 2025)
- IR 05000397/1997011 + (09:17:39, 8 January 2025)
- ML17292B100 + (09:17:40, 8 January 2025)
- IR 05000397/1997010 + (09:17:41, 8 January 2025)
- GO2-97-197, Informs NRC of Change to Plant Reactor Stability Long Term Solution from Option I-A to Option III & to Provide Update to Implementation Schedule + (09:17:42, 8 January 2025)
- GO2-97-196, Provides Clarification on Two Points Made by Staff in Re Request for Extension of Exam Interval for IGSCC Category C Welds for Unit 2 + (09:17:43, 8 January 2025)
- GO2-97-195, Submits COLR 97-13,rev 2,IAW Requirements of WNP-2 TS 5.6.5 + (09:17:44, 8 January 2025)
- ML17292B094 + (09:17:46, 8 January 2025)
- ML17292B093 + (09:17:47, 8 January 2025)
- ML17292B092 + (09:17:47, 8 January 2025)
- ML17292B090 + (09:17:48, 8 January 2025)
- ML17292B089 + (09:17:49, 8 January 2025)
- ML17292B087 + (09:17:50, 8 January 2025)
- GO2-97-188, Monthly Operating Rept for Sept 1997 for WNP-2 + (09:17:51, 8 January 2025)
- ML17292B086 + (09:17:51, 8 January 2025)
- GO2-97-189, Resubmits Response to NOV for Insp Rept 50-397/97-10 Dtd 971002.Two Pages Were Inadvertently Missing from Ltr + (09:17:53, 8 January 2025)
- ML17292B084 + (09:17:53, 8 January 2025)
- GO2-97-185, Provides Update of Process Re Revs to WNP-2 Inservice Testing Program Plan for Pumps & Valves That Result from Change in Classification.Process Will Incorporate Guidelines Provided in NUREG-1482,Section 7.2, Design Basis Reviews + (09:17:54, 8 January 2025)
- GO2-97-184, Responds to NRC Re Violations Noted in Insp Rept 50-397/97-10.Corrective Actions:Established Event Evaluation Team & Independent Evaluation Team to Investigate Reactor Feedwater Pump Trip Test & Reactor Scram of 970327 + (09:17:56, 8 January 2025)
- GO2-97-181, Submits Rept on Impact of non-significant Changes & Errors Discovered in ECCS Evaluation Methodology Used in Licensing of WNP-2 Core.Rept Submitted Per Requirements of 10CFR50.46 + (09:17:57, 8 January 2025)
- ML17292B079 + (09:17:58, 8 January 2025)
- GO2-97-182, Forwards WNP-2 ISI Summary Rept for Refueling Outage RF12 + (09:17:59, 8 January 2025)
- ML17292B078 + (09:17:59, 8 January 2025)
- GO2-97-180, Forwards Proprietary Info Which Supplements Response to Violations Noted in Insp Rept 50-397/97-11.Encl Withheld,Per 10CFR2.790(b) + (09:18:03, 8 January 2025)
- ML17292B071 + (09:18:05, 8 January 2025)
- ML17292B070 + (09:18:06, 8 January 2025)
- ML17292B069 + (09:18:07, 8 January 2025)
- GO2-97-176, Provides Addendum to NRC Response to Unresolved Items 96-201-02 & 96-201-10 Contained in Insp Rept 50-397/96-201. Util Response Modified as Follows to Reflect Revised Position on ADS Design Compliance W/Reg Guide 1.62 + (09:18:08, 8 January 2025)
- ML17292B067 + (09:18:08, 8 January 2025)
- 05000397/LER-1997-004, :on 970327,plant Operators Manually Scrammed Reactor as Required by TS Due to Indication of Entry Into Region a of power-to-flow Map.Caused by Inadequate Attention to Detail.Established Event Evaluation Teams + (09:18:12, 8 January 2025)