Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199K168 + (09:16:03, 8 December 2024)
- ML20199K165 + (09:16:05, 8 December 2024)
- ML20199K160 + (09:16:06, 8 December 2024)
- ML20199K157 + (09:16:07, 8 December 2024)
- ML20199K159 + (09:16:07, 8 December 2024)
- NRC-97-5450, Forwards W Response to FSER Open Item 720.429F Re AP600 PRA in-vessel Steam Explosion Topic.Response to RAI 492.14 Re Oits 2987.W Status Column in Oits 2987 Will Be Changed to Action N + (09:16:08, 8 December 2024)
- IR 05000317/1997009 + (09:16:09, 8 December 2024)
- ML20199K150 + (09:16:10, 8 December 2024)
- HL-5728, Requests That RPV Shell Weld Ultrasonic Exams Be Performed Using Techniques & Procedures,Iaw ASME Section Xi,App Viii, 1992 Edition,1993 Addendum,In Lieu of ASME Section XI,1989 Edition Exam Techniques & Procedures + (09:16:11, 8 December 2024)
- ML20199K142 + (09:16:12, 8 December 2024)
- ML20199K141 + (09:16:13, 8 December 2024)
- ML20199K140 + (09:16:13, 8 December 2024)
- ML20199K138 + (09:16:14, 8 December 2024)
- ML20199K139 + (09:16:14, 8 December 2024)
- ML20199K134 + (09:16:15, 8 December 2024)
- ML20199K131 + (09:16:19, 8 December 2024)
- ML20199K128 + (09:16:20, 8 December 2024)
- ML20199K129 + (09:16:20, 8 December 2024)
- ML20199K126 + (09:16:21, 8 December 2024)
- ML20199K122 + (09:16:22, 8 December 2024)
- ML20199K124 + (09:16:22, 8 December 2024)
- ML20199K121 + (09:16:23, 8 December 2024)
- ML20199K118 + (09:16:23, 8 December 2024)
- ML20199K117 + (09:16:24, 8 December 2024)
- ML20199K111 + (09:16:26, 8 December 2024)
- ML20199K108 + (09:16:27, 8 December 2024)
- LIC-97-0175, Forwards Application for Amend to License DPR-40,revising Tech Specs 5.19 by Incorporating Editorial Changes & Two Exceptions to NEI-94-01,Rev 0, Industry Guideline for Implementing Performance-Based Option of 10CFR50,App J + (09:16:28, 8 December 2024)
- ML20199K107 + (09:16:28, 8 December 2024)
- ML20199K099 + (09:16:29, 8 December 2024)
- 05000278/LER-1998-009-01, :on 981227,unplanned Esfa Were Noted.Caused by Transformer Insulator Failure.Replaced Failed Insulator. with + (09:16:31, 8 December 2024)
- ML20199K081 + (09:16:33, 8 December 2024)
- ML20199K078 + (09:16:34, 8 December 2024)
- ML20199K073 + (09:16:35, 8 December 2024)
- 05000354/LER-1986-027, :on 860602,4,800 Lb of Fiberglass Reinforced Plastic (FRP) Found in Traveling Screen Motor Room Svc Water Intake Structure.Caused by FRP Not Recognized as Combustible Matl.Hourly Fire Watch Performed + (09:16:37, 8 December 2024)
- ML20199K068 + (09:16:41, 8 December 2024)
- ML20199K066 + (09:16:42, 8 December 2024)
- BSEP-98-0244, Responds to NRC Re Violations Noted in Insp Repts 50-324/98-10 & 50-325/98-10.Corrective Actions:Replacement of Torque Switch & Spring Pack,Valve 1-SW-V-106,has Successfully Passed Periodic Testing Requirements + (09:16:43, 8 December 2024)
- ML20199K065 + (09:16:43, 8 December 2024)
- ML20199K061 + (09:16:44, 8 December 2024)
- 05000414/LER-1986-020-01, :on 860528 & 29,main Feedwater Isolations Occurred on Steam Generator C hi-hi Level.Caused by Feedwater Control Valve Malfunction.Isolation Signal Reset & Work Requests Issued + (09:16:45, 8 December 2024)
- ML20199K058 + (09:16:48, 8 December 2024)
- 05000261/LER-1986-011-01, :on 860620,automatic Reactor Trip Initiated Due to Overpower Delta T Trip Signal.Caused by Unsoldered Wire Connection Between Two Variable Resistors in N-41 Circuitry. Loose Wire Soldered to Connection Pin + (09:16:54, 8 December 2024)
- ML20199K054 + (09:16:55, 8 December 2024)
- 05000455/LER-1997-004-10, :on 970912,control Switch Was Functioning Backwards.Caused by Improperly Installed Actuator on Control Switch.Will Revise BHP 4200-46 to Include Specific Steps for Actuator Placement + (09:16:56, 8 December 2024)
- 05000361/LER-1986-014, :on 860613,during Routine Weekly Battery Bank Testing,Cell Gravity Readings Found Outside Allowable Values on Cell 35.Caused by Confusing Tech Spec Acceptance Criteria.Surveillance Procedures Clarified + (09:16:58, 8 December 2024)
- ML20199K050 + (09:16:59, 8 December 2024)
- ML20199K047 + (09:17:01, 8 December 2024)
- ML20199K042 + (09:17:02, 8 December 2024)
- ML20199K044 + (09:17:02, 8 December 2024)
- RA-98-011, Informs of Westinghouse Underway Preparation of Revised Financial Assurance Mechanism,Including 25% Contingency Factor in Decommissioning Cost Estimate for License SNM-1107.Submittal Will Be Made within Few Wks + (09:17:03, 8 December 2024)
- ML20199K039 + (09:17:04, 8 December 2024)
- ML20199K035 + (09:17:06, 8 December 2024)