Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203K488 + (05:28:48, 8 December 2024)
- ML20203K485 + (05:28:50, 8 December 2024)
- ML20203K482 + (05:28:51, 8 December 2024)
- ML20203K484 + (05:28:51, 8 December 2024)
- ML20203K480 + (05:28:52, 8 December 2024)
- ML20203K479 + (05:28:53, 8 December 2024)
- 05000312/LER-1986-018, :on 860717,determined That Control Room Did Not Implement Compensatory Fire Protection Measures When Smoke Detectors Disabled for Welding Operations.Caused by Communication Problems.Memo Issued + (05:28:54, 8 December 2024)
- 05000293/LER-1986-019, :on 860715,recirculation Pump Trip Sys & Alternate Rod Insertion Sys Declared Inoperable Due to Insufficient Monthly ATWS Surveillance Procedure.Caused by Tech Spec Change.Tech Spec Revised + (05:28:57, 8 December 2024)
- 3F0298-07, Forwards Topical Rept for Review & Approval,Which Describes Addl Active Method of Preventing Boron Precipitation Following Design Basis Loca.Issuance of SER Is Also Requested + (05:28:58, 8 December 2024)
- 05000267/LER-1986-022, :on 860715,failure Point in 480-volt Ac Essential Bus 1 & 2 Undervoltage Relay Logic Identified. Caused by Misunderstanding of Basic Design Requirements. Designer & Independent Reviewer Reprimanded + (05:29:00, 8 December 2024)
- ML20203K471 + (05:29:01, 8 December 2024)
- IR 05000259/1973003 + (05:29:02, 8 December 2024)
- ML20203K468 + (05:29:03, 8 December 2024)
- 0CAN088603, Semiannual Effluent & Waste Disposal Repts First & Second Quarters 1986 + (05:29:04, 8 December 2024)
- ML20203K463 + (05:29:05, 8 December 2024)
- IR 05000348/1997015 + (05:29:08, 8 December 2024)
- ML20203K458 + (05:29:09, 8 December 2024)
- ML20203K452 + (05:29:12, 8 December 2024)
- ML20203K453 + (05:29:12, 8 December 2024)
- ML20203K447 + (05:29:13, 8 December 2024)
- 05000362/LER-1986-008-01, :on 860716,containment Purge Isolation Sys Train B Actuated on Instrument Failure Signal from Containment Airborne Gas Monitor.Caused by Faulty Wire on Assembly Connector.Connector Repaired + (05:29:15, 8 December 2024)
- ML20203K439 + (05:29:24, 8 December 2024)
- 05000362/LER-1986-007-01, :on 860715,discovered 8 H Turbine Bldg Sump Effluent Sampling Analysis Delinquent.Caused by Failure to Follow Administrative Controls.Technicians Disciplined & Counseled.Procedures Revised + (05:29:26, 8 December 2024)
- ML20203K437 + (05:29:27, 8 December 2024)
- PNO-II-86-056, on 860804,unidentified Leakage of 1.31 Gpm Noted.Power Reduced to Allow Containment Entry to Identify Leakage.Three Valves,Including Loop Stop Valve,Found Leaking.On 860805,reactor Shut Down to Repair Leak + (05:29:27, 8 December 2024)
- ML20203K434 + (05:29:28, 8 December 2024)
- 05000249/LER-1986-010-08, :on 860713,auto Blowdown Sys I Tripped During Instrument Surveillance Logic Test.Caused by Instrument Setpoint Drift.Relays Recalibr + (05:29:30, 8 December 2024)
- ML20203K431 + (05:29:31, 8 December 2024)
- RC-97-0256, Forwards Amend 41 to Physical Security Plan.Plan Withheld, Per 10CFR73.21 + (05:29:31, 8 December 2024)
- ML20203K427 + (05:29:32, 8 December 2024)
- ML20203K426 + (05:29:34, 8 December 2024)
- ML20203K422 + (05:29:35, 8 December 2024)
- 05000298/LER-1986-014, :on 860718,inadvertent Isolation of RWCU Sys Occurred.Caused by Air in Low Pressure Instrument Sensing Line.Air Purged from Line & Surveillance Procedure Performed Satisfactorily + (05:29:37, 8 December 2024)
- ML20203K418 + (05:29:38, 8 December 2024)
- 05000373/LER-1996-017-02, Forwards LER 96-017-02 Per 10CFR50.73(a)(2)(i).Commitment Made by Util,Listed + (05:29:41, 8 December 2024)
- ML20203K416 + (05:29:42, 8 December 2024)
- ML20203K415 + (05:29:43, 8 December 2024)
- ML20203K412 + (05:29:44, 8 December 2024)
- ML20203K408 + (05:29:44, 8 December 2024)
- JAFP-98-0078, Forwards Semi-Annual Radioactive Effluent Release Rept, for July-Dec 1997 & Amend to Table 3B, Solid Waste & Irradiated Fuel Shipments for Semi-Annual Radioactive Effluent Release Rept for Jan-June 1997 + (05:29:45, 8 December 2024)
- IR 05000320/1986008 + (05:29:47, 8 December 2024)
- ML20203K403 + (05:29:47, 8 December 2024)
- ML20203K402 + (05:29:48, 8 December 2024)
- ML20203K401 + (05:29:49, 8 December 2024)
- 05000354/LER-1986-041, :on 860715,HPCI Sys Actuated from Invalid Reactor Vessel Low Water Level 2 Signal from Channel C LOCA Instrumentation.Caused by Transient Due to Personnel Stepping on Sensing Line Piping.Lines Labeled + (05:29:50, 8 December 2024)
- ML20203K399 + (05:29:52, 8 December 2024)
- ML20203K397 + (05:29:52, 8 December 2024)
- ML20203K394 + (05:29:53, 8 December 2024)
- ML20203K391 + (05:29:56, 8 December 2024)
- ML20203K389 + (05:29:57, 8 December 2024)
- ML20203K387 + (05:29:57, 8 December 2024)