Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205B112 + (00:18:41, 8 December 2024)
- ML20205B110 + (00:18:42, 8 December 2024)
- ML20205B109 + (00:18:42, 8 December 2024)
- ML20205B107 + (00:18:43, 8 December 2024)
- 05000440/LER-1987-011, :on 870227,during Audit,Discovered That on 861021,independent Verification of Discharge Path Valve Line Not Performed Prior to Commencing Liquid Radwaste Discharge Release.Caused by Failure to Follow Procedure + (00:18:45, 8 December 2024)
- PNO-I-86-062, on 860807,plant Shut Down Due to Packing Leak on RCIC Testable Check Valve AO-22.Caused by Manual Scram. Licensee Will Repair & Test Valve When Cold Shutdown Reached + (00:18:46, 8 December 2024)
- ML20205B101 + (00:18:46, 8 December 2024)
- ML20205B100 + (00:18:47, 8 December 2024)
- ML20205B098 + (00:18:48, 8 December 2024)
- ML20205B093 + (00:18:49, 8 December 2024)
- ML20205B090 + (00:18:50, 8 December 2024)
- ML20205B092 + (00:18:50, 8 December 2024)
- ML20205B087 + (00:18:51, 8 December 2024)
- ML20205B084 + (00:18:52, 8 December 2024)
- ML20205B079 + (00:18:52, 8 December 2024)
- PY-CEI-NRR-0504, Forwards Description of Emergency Procedures Developed for Hydrogen Igniter Sys,Per Paragraph 2.C.10(b) of License NPF-45.Specific Instruction Under Review & Will Be Approved Upon Receipt of Sser 10 + (00:18:53, 8 December 2024)
- ML20205B072 + (00:18:54, 8 December 2024)
- ML20205B076 + (00:18:54, 8 December 2024)
- ML20205B071 + (00:18:55, 8 December 2024)
- ML20205B067 + (00:18:57, 8 December 2024)
- ML20205B068 + (00:18:57, 8 December 2024)
- ML20205B066 + (00:18:58, 8 December 2024)
- ML20205B063 + (00:18:59, 8 December 2024)
- IR 05000438/1986004 + (00:19:00, 8 December 2024)
- ML20205B057 + (00:19:00, 8 December 2024)
- ML20205B056 + (00:19:01, 8 December 2024)
- ML20205B051 + (00:19:02, 8 December 2024)
- ML20205B052 + (00:19:02, 8 December 2024)
- IR 05000412/1986018 + (00:19:07, 8 December 2024)
- ML20205B047 + (00:19:07, 8 December 2024)
- ML20205B046 + (00:19:08, 8 December 2024)
- ML20205B040 + (00:19:09, 8 December 2024)
- ML20205B041 + (00:19:09, 8 December 2024)
- ML20205B037 + (00:19:10, 8 December 2024)
- ML20205B035 + (00:19:11, 8 December 2024)
- ML20205B036 + (00:19:11, 8 December 2024)
- IR 05000373/1986030 + (00:19:13, 8 December 2024)
- ML20205B033 + (00:19:14, 8 December 2024)
- PNO-I-86-061, on 860806,equipment Qualification Discrepancy Identified W/Field Wiring within Limitorque Valve Operators in Containments.Both Units Shut Down to Replace Questionable Wires W/Qualified Wires + (00:19:21, 8 December 2024)
- ML20205B029 + (00:19:21, 8 December 2024)
- ML20205B027 + (00:19:22, 8 December 2024)
- ST-HL-AE-2793, Forwards Addendum 3 to Crdr,Human Engineering Discrepancy Resolution Rept & Addendum 4 to Crdr,Executive Summary + (00:19:23, 8 December 2024)
- ML20205B022 + (00:19:23, 8 December 2024)
- ML20205B021 + (00:19:24, 8 December 2024)
- ML20205B017 + (00:19:25, 8 December 2024)
- ML20205B015 + (00:19:27, 8 December 2024)
- 05000321/LER-1988-014-02, :on 881003,primary Containment Penetration Local Leak Rate Test Failed Due to MSIVs Exceeding Tech Spec Max Leakage Rate.Cause Under Investigation.Corrective Actions Incomplete + (00:19:28, 8 December 2024)
- ML20205B013 + (00:19:29, 8 December 2024)
- ML20205B011 + (00:19:30, 8 December 2024)
- ML20205B010 + (00:19:31, 8 December 2024)
- ML20205B008 + (00:19:33, 8 December 2024)