Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000315/LER-1979-054-03, /03L-0:on 791013,all Bistable Trip Points Out of Spec.Caused by T-hot Resistance Drift 7-8% Below Normal. Replacement for Resistance to Voltage Converter Calibr to Spec & Loop Set for Proper Trip Setpoints + (20:20:04, 7 January 2025)
- 05000315/LER-1979-054, Forwards LER 79-054/03L-0 + (20:20:06, 7 January 2025)
- 05000315/LER-1979-053-03, /03L-0:on 791012,loop 3 Channel 4 Steam Generator Level Failed.Caused by Faulty Containment Cable Penetration. Penetration Feedthrough Switched to Spare Penetration & New Feedthrough Checked for Operability + (20:20:08, 7 January 2025)
- 05000315/LER-1979-053, Forwards LER 79-053/03L-0 + (20:20:10, 7 January 2025)
- ML17326A333 + (20:20:12, 7 January 2025)
- ML17326A328 + (20:20:13, 7 January 2025)
- ML17326A329 + (20:20:13, 7 January 2025)
- ML17326A327 + (20:20:14, 7 January 2025)
- ML17326A325 + (20:20:15, 7 January 2025)
- IR 05000315/1979022 + (20:20:17, 7 January 2025)
- 05000315/LER-1979-052, Forwards LER 79-052/03L-0 + (20:20:20, 7 January 2025)
- 05000316/LER-1979-035-01, /01T-0:on 791017,emergency Diesel Generator AB & Motor Driven Auxiliary Feedwater Pump Removed from Svc for Maint.Caused by Failure of Operators to Identify safety- Related Equipment Associated W/Emergency Diesel Generator + (20:20:23, 7 January 2025)
- 05000316/LER-1979-035, Forwards LER 79-035/01T-0 + (20:20:25, 7 January 2025)
- ML17326A313 + (20:20:26, 7 January 2025)
- ML17326A311 + (20:20:27, 7 January 2025)
- ML17326A310 + (20:20:28, 7 January 2025)
- ML17326A309 + (20:20:30, 7 January 2025)
- ML17326A307 + (20:20:31, 7 January 2025)
- 05000315/LER-1979-051-03, /03L-0:on 790929,isolation Valves VCR-10 & 20 Would Not Close.Cause Not Stated.Valves Cycled & Began to Operate Properly.No Further Action Is Planned + (20:20:33, 7 January 2025)
- 05000315/LER-1979-051, Forwards LER 79-051/03L-0 + (20:20:36, 7 January 2025)
- ML17326A303 + (20:20:38, 7 January 2025)
- ML17326A302 + (20:20:39, 7 January 2025)
- ML17326A299 + (20:20:40, 7 January 2025)
- ML17326A298 + (20:20:40, 7 January 2025)
- ML17326A297 + (20:20:42, 7 January 2025)
- 05000316/LER-1979-034-03, /03L-0:on 790926,sample Pump for Radiation Monitors R-11 & R-12 Tripped at Frequent Intervals on Two Occasions.Cause Unknown.Pumps Replaced & Tested Satisfactorily.Pumps Scheduled for Periodic Replacement + (20:20:43, 7 January 2025)
- ML17326A295 + (20:20:44, 7 January 2025)
- 05000315/LER-1979-050-03, /03L-0:on 790929,during Surveillance Test,Steam Generator Water Level low-low Bistable Drifted Excessively. Caused by Defective Bistable.Bistable Replaced,Calibr,Tested & Returned to Svc + (20:20:47, 7 January 2025)
- 05000315/LER-1979-049-03, /03L-0:on 790924,during Review of Axial Power Distribution Monitoring Sys Readout,Discovered That Sys Failed to Perform Tech Spec Surveillance Requirement F(Z). Caused by Direction Relay Sticking on Detector Drive 4 + (20:20:50, 7 January 2025)
- ML17326A292 + (20:20:51, 7 January 2025)
- 05000316/LER-1979-033-03, /03L-0:on 790930,steam Generator Stop Valve Dump 3 Failed to Open.Caused by Open Coil for Solenoid Valve.Coil Replaced & Proper Action Verified + (20:20:54, 7 January 2025)
- 05000315/LER-1979-048-03, /03L-0:on 790917,sample Pump for Radiation Monitor Was Inoperable Due to Failed motor-to-pump Coupling Insert. Caused by Failure of Rubber Spider in Coupling.Coupling Was Replaced & Air Sampler Tested + (20:20:56, 7 January 2025)
- ML17326A288 + (20:20:58, 7 January 2025)
- ML17326A286 + (20:20:59, 7 January 2025)
- ML17326A285 + (20:20:59, 7 January 2025)
- 05000316/LER-1979-032-03, /03L-0:on 790911,during Surveillance Test,High Pressure Reactor Trip Bistable Found to Trip at Setpoint Corresponding to 2417 Psig.Caused by Defective Bistable. Bistable Replaced + (20:21:02, 7 January 2025)
- 05000316/LER-1979-030-03, /03L-0:on 790909,while at 81% Power,Delta Flux Indication Was Below Tech Spec Limit.Caused by Operator Error.Procedures Have Been Revised + (20:21:04, 7 January 2025)
- 05000316/LER-1979-031-03, /03L-0:on 790912,elevation Containmment Airlock Interlock at 612 Ft Did Not Prevent Opening of Outer Door W/Inner Door Open.Caused by Flexing of One Interlock Support Bracket.Gusset Added to Bracket + (20:21:07, 7 January 2025)
- ML17326A280 + (20:21:08, 7 January 2025)
- 05000315/LER-1979-047-03, /03l-0:on 790908,circuit Breakers FMO-241,breaker- to-engineered Safety Feature Ventillation Fan 2 & breaker- to-A Train Heat Trace Circuits Found Open.Cause Not Identified.Breakers Reclosed & keep-free Areas Established + (20:21:10, 7 January 2025)
- 05000315/LER-1979-046-03, /03L-0:on 790905,during Full Length Control Rod Operability Test,Urgent Failure Alarm from Power Cabinet 2AC Was Received on Rod Control.Cause Could Not Be Found.Power Supply Reset & Operability Test Satisfactorily Completed + (20:21:12, 7 January 2025)
- ML17326A277 + (20:21:13, 7 January 2025)
- ML17326A276 + (20:21:14, 7 January 2025)
- ML17326A275 + (20:21:15, 7 January 2025)
- ML17326A274 + (20:21:17, 7 January 2025)
- ML17326A273 + (20:21:18, 7 January 2025)
- ML17326A272 + (20:21:19, 7 January 2025)
- ML17326A271 + (20:21:20, 7 January 2025)
- ML17326A270 + (20:21:21, 7 January 2025)
- ML17326A268 + (20:21:22, 7 January 2025)
- ML17326A267 + (20:21:23, 7 January 2025)