Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17340A306 + (17:49:03, 7 January 2025)
- ML17340A305 + (17:49:04, 7 January 2025)
- ML17340A302 + (17:49:05, 7 January 2025)
- ML17340A300 + (17:49:06, 7 January 2025)
- ML17340A299 + (17:49:07, 7 January 2025)
- ML17340A295 + (17:49:08, 7 January 2025)
- L-80-315, Responds to IE Bulletin 80-18, Maint of Adequate Min Flow Thru Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. Units Do Not Have Centrifugal Charging Pumps + (17:49:09, 7 January 2025)
- L-80-346, Updates Mod Plans & Provides Addl Info Re Fire Protection Plan + (17:49:10, 7 January 2025)
- L-80-330, Forwards Security Plan,Revision 3.Revision Withheld (Ref 10CFR2.790) + (17:49:13, 7 January 2025)
- ML17340A289 + (17:49:13, 7 January 2025)
- L-80-341, Forwards Info Re Inservice Insp Program in Response to NRC + (17:49:18, 7 January 2025)
- L-80-339, Submits Info Re Plans to Prevent ECCS Computational Errors in Response to NRC .Std Procedure Document for Steam Generator Tube Plugging Analysis Has Been Written.Qa Audits Indicated Correction of Previous Errors + (17:49:20, 7 January 2025)
- ML17340A282 + (17:49:24, 7 January 2025)
- IR 05000250/1980021 + (17:49:26, 7 January 2025)
- ML17340A269 + (17:49:27, 7 January 2025)
- ML17340A265 + (17:49:28, 7 January 2025)
- L-80-243, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-21 & 50-251/80-21.Corrective Actions: Antirotation Devices Were Installed on Check Valve & New QC Inspector Checkoff List Developed + (17:49:29, 7 January 2025)
- ML17340A262 + (17:49:31, 7 January 2025)
- ML17340A261 + (17:49:33, 7 January 2025)
- IR 05000250/1980026 + (17:49:34, 7 January 2025)
- ML17340A258 + (17:49:35, 7 January 2025)
- ML17340A257 + (17:49:36, 7 January 2025)
- L-80-282, Responds to NRC Ltr Re Violations Noted in IE Insp Repts 50-250/80-26 & 50-251/80-26.Corrective Actions:Radioactive Filter Matl Disposed of Per Health Physics Procedure & Cart Labeled + (17:49:37, 7 January 2025)
- ML17340A253 + (17:49:39, 7 January 2025)
- L-80-307, Forwards Response to IE Bulletin 80-20 Re W-2 Spring Return to Neutral Control switches.Safety-related Sys Using Switches Identified & Test Performed.Longer Term Measures Mod Plan to Be Completed by Second Quarter 1981 + (17:49:40, 7 January 2025)
- L-80-336, Submits Info Re 800507 Commitment to Design Reactor Coolant Pressure Oil Collection Sys to Prevent Loss of Operability of safety-related Equipment During Sse.Sys Attachments Will Protect safety-related Equipment + (17:49:41, 7 January 2025)
- ML17340A245 + (17:49:43, 7 January 2025)
- ML17340A244 + (17:49:44, 7 January 2025)
- IR 05000250/1980018 + (17:49:46, 7 January 2025)
- ML17340A242 + (17:49:47, 7 January 2025)
- ML17340A241 + (17:49:48, 7 January 2025)
- L-80-264, Advises That Util Reviewed IE Insp Repts 50-250/80-18 & 50-251/80-18 & Initiated Coordination W/Ae to Disposition Insp Findings.Followup Rept Scheduled for Submittal by 800901 + (17:49:49, 7 January 2025)
- L-80-303, Responds to NRC Ltr,Supplementing 800908 Response,Re Violations Noted in IE Insp Repts 50-250/80-18 & 50-251/80-18.Corrective Actions:Insp & Repairs on Sys Identified in IE Bulletins 79-02 & 79-14 Will Be Performed + (17:49:50, 7 January 2025)
- ML17340A236 + (17:49:52, 7 January 2025)
- ML17340A235 + (17:49:53, 7 January 2025)
- ML17340A234 + (17:49:54, 7 January 2025)
- ML17340A232 + (17:49:56, 7 January 2025)
- L-80-332, Updates Re Low Fracture Toughness in Response to NRC 800729 Questions.Forwards Partial Response to Questions & Status of Remaining Items W/Anticipated Completion Dates + (17:49:57, 7 January 2025)
- ML17340A230 + (17:49:57, 7 January 2025)
- L-80-314, Responds to NRC Re Need to Maintain at Least 23 Ft of Water Above Irradiated Fuel Assemblies During Refueling.Procedure Change Scheduled for Implementation by 801031 + (17:49:59, 7 January 2025)
- L-80-312, Provides Updated Schedule for Implementation of Fire Protection Mod.Diesel Oil Transfer Isolation Solenoid Valves Will Not Be Installed Until Apr 1981 Due to Vendor Delay in Delivery + (17:50:01, 7 January 2025)
- ML17340A225 + (17:50:03, 7 January 2025)
- ML17340A226 + (17:50:03, 7 January 2025)
- ML17340A224 + (17:50:04, 7 January 2025)
- ML17340A222 + (17:50:05, 7 January 2025)
- L-80-318, Forwards Addl Info Re Effluents from Steam Generator Repair, Per NRC .Questions 1-8 Were Previously Answered. Answers to Questions 9,10,11 & 12 Encl.One Oversize Drawing Encl + (17:50:06, 7 January 2025)
- L-80-322, Forwards Supplemental Info Re 790131 Request for Amend to Tech Spec,Allowing Deletion of Interim Fuel Residence Time Limits.Requests NRC Approval by 801130 + (17:50:07, 7 January 2025)
- L-80-230, Application to Amend Licenses DPR-31 & DPR-41,changing Tech Specs Re RHR Sys Testing Frequency to 18 Months + (17:50:09, 7 January 2025)
- ML17340A217 + (17:50:09, 7 January 2025)
- ML17340A214 + (17:50:12, 7 January 2025)
- ML17340A212 + (17:50:13, 7 January 2025)