ML17340A214

From kanterella
Jump to navigation Jump to search
Ack Response to NRC Re ECCS Evaluation Models Dealing W/Fuel Cladding Swelling & Incidence of Rupture. Response Acceptable & No Further Action Necessary
ML17340A214
Person / Time
Site: Turkey Point  
Issue date: 09/12/1980
From: Varga S
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8010010176
Download: ML17340A214 (6)


Text

-4 RANI'fIItIIHRV.<If SEPTEMBER 1 B '1980 Docket N

-250 and DDIETRLEgD am Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology

Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152

Dear Dr. Uhrig:

He have reviewed your response to our November 9, 1979 letter concerning those portions of your ECCS evaluation models, dealing with fuel cladding swelling and incidence of rupture.

He find that you have adequately confirmed the representations made in your behalf by your fuel supplier.

Me, therefore, conclude that your response is acceptable and that no further action is necessary at this time+

Sincerely,

+'iginal signe4 bye

,S. A. Var'ga cc:

See next page Steven A. Varga, Chief Operating Reactors Branch 81 Division of Licensing 8010 o1o If&

OFFICE P SURNAME OATF P DL:ORB1 I'

MGrotenhuis:

09/

/80 DL:ORB1 bs 9/

/80 NRC FORM 318 (9 76) NRCM 0240 4U.S. GOVERNMENT PRINTING OFFICE: 1979.289D69

.)$j< $Jpq jg396 P~i.".",iA hgifiij4fjfQfjjjg

-~~'" ~39i3f l3P.

z qs oir'~i'c:.Z"E.<0, sgvu", L P

~p,ll AK0g o

Cq Cy

~c 0O

.er

+~

~O

~ <<*~<<+'NITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

<PPTEPgPP 1 2 1360 Docket Hos.

50-250 and 50-251 Dr. Robert E. Uhri g, Vice President Advanced Systems'nd Technologoy Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152

Dear Dr. Uhrig:

1!e have reviewed your response to our I'Iovember 9, 1979 letter concerning those portions of your ECCS evaluation

models, dealing with fuel cladding swelling and incidence of rupture.

'He find that you have adequateIy confirmed the representations made in your behalf by.your fuel supplier.

Me, therefore, conclude that your response is acceptable and that no further action is necessary at this time.

Sincerely, I

i I+i C.

tev n

a, Chic Operating Reactors Br ch 81 Division of Licensing cc:

See next page

O.

Hf

Robert E. Uhri g Florida Power and Light Company cc:

Mr. Robert Lowenstein, Esquire Lowenstein,

Newman, Reis and Axelrad 1025 Connecticut
Avenue, H.W.

Suite 1214 Washington, D.

C.

20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Horman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast First National Bank 8u i 1 di n g
Miami, Fl ori da 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Floriida Power and Light Company P. 0.

Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Envi ronmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Fl ori da 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Comnission Post O,fice Box 971277 (vail Heights Station Miami, Florida 33197

t se