Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17340A531 + (17:46:10, 7 January 2025)
- ML17340A530 + (17:46:11, 7 January 2025)
- ML17340A525 + (17:46:11, 7 January 2025)
- ML17340A523 + (17:46:12, 7 January 2025)
- L-80-417, Application to Amend Licenses DPR-31 & DPR 41 Authorizing Proposed Changes to Tech Specs Per TMI Lessons Learned + (17:46:13, 7 January 2025)
- ML17340A520 + (17:46:15, 7 January 2025)
- ML17340A517 + (17:46:16, 7 January 2025)
- ML17340A516 + (17:46:17, 7 January 2025)
- ML17340A515 + (17:46:18, 7 January 2025)
- L-80-410, Forwards Revision 3 to QA Manual + (17:46:19, 7 January 2025)
- L-80-411, Forwards Addl Info Re Distribution Sys Voltages,In Response to NRC .Since Safety Injection Signal Initiates Automatic Fast Transfer from Auxiliary Transformer to Startup Transformer,Only Connection Via Startup Analyzed + (17:46:21, 7 January 2025)
- ML17340A511 + (17:46:23, 7 January 2025)
- ML17340A510 + (17:46:24, 7 January 2025)
- L-80-412, Forwards Steam Generator Insp Results from Current Outage. Results Show No New Phenomena & Verify General Denting Pattern within Predictable Limits Consistent W/Previous Insp.Requests Permission to Return to Full Power Operation + (17:46:25, 7 January 2025)
- ML17340A505 + (17:46:27, 7 January 2025)
- ML17340A503 + (17:46:28, 7 January 2025)
- ML17340A501 + (17:46:29, 7 January 2025)
- ML17340A498 + (17:46:30, 7 January 2025)
- L-80-398, Advises That Containment Purge Valve Torque & Stress Analysis Has Been Completed by Henry Pratt Co.Mods to Limit Valve Disc Openings for Unit 3 Completed.Mods to Unit 4 Will Be Completed During Current Refueling Outage + (17:46:31, 7 January 2025)
- ML17340A495 + (17:46:31, 7 January 2025)
- IR 05000250/1980032 + (17:46:34, 7 January 2025)
- ML17340A471 + (17:46:35, 7 January 2025)
- L-80-344, Responds to NRC Re Violations Noted in IE Insp Repts 50-250/80-19 & 50-250/80-20.Requests Extension of Compliance Date from 801015 to 801115 for Revisions to Fire Training Procedures + (17:46:36, 7 January 2025)
- ML17340A467 + (17:46:38, 7 January 2025)
- W3F1-2017-0078, Final Safety Analysis Report, Revision 310 + (17:46:39, 7 January 2025)
- ML17340A463 + (17:46:40, 7 January 2025)
- BSEP 17-0117, Response to Request for Additional Information (Probabilistic Risk Assessment and Human Performance Branches) Regarding Request for Risk-Informed Exigent License Amendment - Technical Specification 3.8.1 AC Sources + (17:46:44, 7 January 2025)
- ML17340A460 + (17:46:44, 7 January 2025)
- L-80-391, Forwards Info Re Security Plan.Info Withheld (Ref 10CFR2.790) + (17:46:47, 7 January 2025)
- 05000250/LER-1980-020-03, /03L-0:on 801018,periodic Test of RHR Pump 3A Not Completed within Prescribed Time Interval.Caused by Personnel Being Unaware That 3A 4160-volt Bus Returned to Svc.Scheduling Sys Modified + (17:46:49, 7 January 2025)
- 05000250/LER-1980-020, Forwards LER 80-020/03L-0 + (17:46:51, 7 January 2025)
- 05000251/LER-1980-012-03, /03L-0:on 801013,excessive Leakage Past Primary Packing in Charging Pump 4A Caused Pump to Be Removed from Svc.Caused by Loose Packing.Packing Replaced + (17:46:53, 7 January 2025)
- 05000251/LER-1980-012, Forwards LER 80-012/03L-0 + (17:46:55, 7 January 2025)
- L-80-390, Forwards Final Rept on Low Fracture Toughness in Response to NRC + (17:46:56, 7 January 2025)
- L-80-389, Forwards Info Re Air Lock Leakage Testing Per 790312 Request + (17:46:57, 7 January 2025)
- L-80-386, Forwards Addl Info Re Steam Generator Decontamination Alternatives & Weld Strength for Sealing of Steam Generator Lower Assemblies After Removal,Per 801110 Telcon.Info Re Doses Resulting from Postulated Drop of Lower Assembly Encl + (17:46:59, 7 January 2025)
- L-80-388, Forwards Info Re Rare & Endangered Species Occurring at Facility or Vicinity,In Response to + (17:47:01, 7 January 2025)
- L-80-373, Responds to IE Bulletin 80-11, Masonry Wall Design. Re-evaluations of 99 safety-related Walls in Progress.Final Rept Scheduled for 810209 + (17:47:02, 7 January 2025)
- ML17340A437 + (17:47:05, 7 January 2025)
- IR 05000250/1980027 + (17:47:06, 7 January 2025)
- ML17340A434 + (17:47:07, 7 January 2025)
- L-80-362, Forwards Response to IE Bulletin 79-03A, Longitudinal Weld Defects in ASME SA-312,Type 304 Stainless Steel Pipe. Hoop Stress for All Fusion Welded Stainless Steel Piping Used in safety-related Sys within 85% of Code Allowable Stress + (17:47:08, 7 January 2025)
- ML17340A430 + (17:47:10, 7 January 2025)
- ML17340A428 + (17:47:11, 7 January 2025)
- ML17340A421 + (17:47:12, 7 January 2025)
- ML17340A424 + (17:47:12, 7 January 2025)
- L-80-348, Updates Responding to IE Bulletin 80-06.No Mod Planned for Operation of Feedwater Main & Bypass Control Valves.Scheduled Completion Date for Circuit Mods of Containment Cooling Fans & Sump Pump Is 810315 + (17:47:13, 7 January 2025)
- L-80-378, Informs That Emergency Operating Procedure 20,000,immediate Actions & Diagnostics,Has Been Revised to Clarify Compliance W/Fourth Paragraph of Section 2.1.4 to TMI Lessons Learned Category a Items + (17:47:14, 7 January 2025)
- ML17340A417 + (17:47:17, 7 January 2025)
- ML17340A416 + (17:47:18, 7 January 2025)
- ML17340A411 + (17:47:19, 7 January 2025)
- ML17340A403 + (17:47:20, 7 January 2025)